Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

DUE Date: 14-12-2019 Multan Electric Power Company (15224-D.

G KHAN-II) Security Cost

14-10-2019 15224004662 201911796286


New Connection New Connection 13-11-2019
Domestic 010045401

Nill

2 (KW) Allied Bank Railway Road D G Khan


220 D.G KHAN

A-1a(01)

Ghulam Sarwar / Manzoor Hussain / Nawan Samandri Wala.Kotla Shafi Muhammad.DG khan

30

1220

30

01

Sub-Division Office 15224-D.G KHAN-II SDO Wapda


Line Superintendent 15224-D.G KHAN-II SDO Wapda

Due Date: 14-12-2019 Security Cost

Ghulam Sarwar / Manzoor Hussain / Nawan Samandri Wala.Kotla Shafi Muhammad.DG khan
14-10-2019 15224004662
1220 13-11-2019 201911796286

010045401
Allied Bank Railway Road D G Khan

DUE DATE: 14-12-2019 Security Cost


Allied Bank Railway Road D G 1220
Khan

201911796286 15224004662 201911796286

1220 13-11-2019

NOTE:- Computer generated demand notice, Hence no signature is required.

Date & Time: (20-11-2019 12:36:12)


DUE DATE: 14-12-2019 Multan Electric Power Company (15224-D.G KHAN-II) Service Cost

14-10-2019 15224004662 201911796286


New Connection New Connection 13-11-2019
Domestic 010045401

Nill

2 (KW) Allied Bank Railway Road D G Khan


220 D.G KHAN

A-1a(01)

Ghulam Sarwar / Manzoor Hussain / Nawan Samandri Wala.Kotla Shafi Muhammad.DG khan

30

4000

30

01

Sub-Division Office 15224-D.G KHAN-II SDO Wapda


Line Superintendent 15224-D.G KHAN-II SDO Wapda

DUE DATE: 14-12-2019 Service Cost

Ghulam Sarwar / Manzoor Hussain / Nawan Samandri Wala.Kotla Shafi Muhammad.DG khan
14-10-2019 15224004662
4000 13-11-2019 201911796286

010045401
Allied Bank Railway Road D G Khan

DUE DATE: 14-12-2019 Service Cost

201911796286 15224004662 201911796286

4000 13-11-2019

NOTE:- Computer generated demand notice, Hence no signature is required.

This subject cited case has been processed in accordance with documents uploded/produced by the owner/applicant. In case any doocument is
found false at later stages, the said connection is likely to be cannceled and as a result of concalment of facts or fraud at any stage and if codal
formalities are not follwed and company resrved its rights to take legal action against owner/applicant.

Date & Time: (20-11-2019 12:36:12)

Powered by TCPDF (www.tcpdf.org)

You might also like