Professional Documents
Culture Documents
Buckeye Power& Light Co
Buckeye Power& Light Co
Plant Requirement
Plant Btus(billion Tota Req Maxim Allowable Wghtd Avg
(Safety Stck Moisture Ash Sulfur
Stb 800 960 6 15 1
Zan 500 600 7 11 2
Ath 600 720 7 18 1
Plant $/Ton Units Used Btus Price Sulfur c3
Ath 30.8 0 0 0 0 0
Ath 36.8 8000 185.44 72000000 7200 0
Ath 34 0 0 0 0 0
Stb 42 0 0 0 0 27000
Zan 41.6 4846.6639 116.95 0 4846.663904 0
Ath 45.6 22153.3361 534.56 0 22153.3361 0
Stb 43.92 22500 549.45 506250000 20250 22500
Zan 42.7 0 0 0 0 0
Ath 41.48 0 0 0 0 0
Stb 33.15 5622.57282 126.3954 33735437 10120.63107 0
Stb 32 0 0 0 0 0
Stb 44.1 11240.2913 284.1546 337208738 8992.23301 30000
Zan 45.36 18759.7087 474.2454 0 15007.76699 0
Zan 35 0 0 0 0 0
Zan 33.12 0 0 0 0 0
Zan 32.4 364.427281 8.804563 838182.746 400.870009 0
950032358
Btus Sulfur
C1 C2
39362.86 960 39362.86
47941.6 600 20255.3
30153.34 720 29353.34