Professional Documents
Culture Documents
Heat Load Computations: Fourth Floor - South Wing, PUP Main Academic Building
Heat Load Computations: Fourth Floor - South Wing, PUP Main Academic Building
Heat Load Computations: Fourth Floor - South Wing, PUP Main Academic Building
1. ROOF – 0
2. WALLS
𝑄𝑤 = 𝑈𝑤𝐴𝑤(𝐶𝐿𝑇𝐷′𝑤)
a. West-facing Wall
b. East-facing Wall
Where: tin = 23 °C
tom = 13.70 °C
c. North-facing Wall
Where: tin = 23 °C
tom = 13.70 °C
d. South-facing Wall
Where: tin = 23 °C
tom = 13.70 °C
Therefore,
𝑄𝑐𝑜𝑛𝑑−𝑔 = 𝑈𝑔𝐴𝑔(𝐶𝐿𝑇𝐷′ )𝑔
𝑊
𝑄𝑐𝑜𝑛𝑑−𝑔 = 5.902 (2.375 𝑚²)(9.67𝐾)
𝑚2.𝐾
𝐵𝑇𝑈
𝑄𝑐𝑜𝑛𝑑−𝑔 = 135.5353 𝑊 𝑥 3.4122
ℎ𝑟−𝑊
𝐵𝑇𝑈
𝑄𝑐𝑜𝑛𝑑−𝑔 = 462.4736
ℎ𝑟
5. CEILING – 0
6. PARTITION WALLS – 0
𝑩𝑻𝑼
𝐓𝐎𝐓𝐀𝐋 𝐇𝐄𝐀𝐓 𝐋𝐎𝐀𝐃(𝐄𝐗𝐓𝐄𝐑𝐍𝐀𝐋) = 𝟑𝟖𝟗𝟕. 𝟔𝟗
𝒉𝒓
HEAT LOAD COMPUTATIONS
Fourth Floor – South Wing, PUP Main Academic Building
II. INTERNAL LOADS
1. LIGHTS
𝑄𝑙 = 𝑁 𝑥 𝑃𝑖𝑛 𝑥 𝐹𝑢𝑙 𝑥 𝐹𝑠𝑎 𝑥 𝐶𝐿𝐹
Number of Lights: 𝑁 = 6
Power Input: 𝑃 = 60 W
Lighting Use Factor: 𝐹𝑢𝑙 = 1.0 (𝑆𝑒𝑒 𝑁𝑜𝑡𝑒 #16)
Special Allowance Factor: 𝐹𝑠𝑎 = 1.20 (𝑆𝑒𝑒 𝑁𝑜𝑡𝑒 #17)
Cooling Load Factor: 𝐶𝐿𝐹 = 1.0
Therefore,
𝑄𝑙 = 𝑁 𝑥 𝑃𝑖𝑛 𝑥 𝐹𝑢𝑙 𝑥 𝐹𝑠𝑎 𝑥 𝐶𝐿𝐹
𝑄𝑙 = 6𝑥 60𝑊 𝑥 1.0 𝑥 1.20 𝑥 1.0
𝐵𝑇𝑈
𝑄𝑙 = 432𝑊 𝑥 3.4122
ℎ𝑟
𝐵𝑇𝑈
1474.07
𝑄𝑙 = ℎ𝑟
2. PEOPLE
𝑄𝑠𝑒𝑛𝑠−𝑜𝑐𝑐 = 𝑁(𝐻𝑠𝑒𝑛𝑠−𝑜𝑐𝑐)(𝐶𝐿𝐹)
Number of Occupants: 𝑁 = 20
Sensible Heat Gain: 𝐻𝑠𝑒𝑛𝑠−𝑜𝑐𝑐 = 75 𝑊 (𝑆𝑒𝑒 𝑁𝑜𝑡𝑒 #14)
Cooling Load Factor: 𝐶𝐿𝐹 = 1.0 (𝑆𝑒𝑒 𝑁𝑜𝑡𝑒 #15)
Therefore,
𝑄𝑠𝑒𝑛𝑠−𝑜𝑐𝑐 = 𝑁(𝐻𝑠𝑒𝑛𝑠−𝑜𝑐𝑐)(𝐶𝐿𝐹)
𝑄𝑠𝑒𝑛𝑠−𝑜𝑐𝑐 = 20(75 𝑊)(1.0)
𝐵𝑇𝑈
𝑄𝑠𝑒𝑛𝑠−𝑜𝑐𝑐 = 1500𝑊 𝑥 3.4122
𝐵𝑇𝑈 ℎ𝑟−𝑊
5118.3
𝑄𝑠𝑒𝑛𝑠−𝑜𝑐𝑐 = ℎ𝑟
3. APPLIANCES
a. Fan Motors
𝑃𝑖𝑛
𝑄=𝑁× ×𝐹 ×𝐹
𝑓 𝑢𝑚 𝑙𝑚
𝜂𝑚
Number of Fan: 𝑁 =3
Input Power: 𝑃𝑖𝑛 = 65 𝑊 (𝑀𝑜𝑡𝑜𝑟 𝑃𝑜𝑤𝑒𝑟 𝐼𝑛𝑝𝑢𝑡)
Mechanical Efficiency: 𝜂𝑚 = 70% (𝑈𝑠𝑢𝑎𝑙𝑙𝑦 𝑓𝑜𝑟 𝑠𝑚𝑎𝑙𝑙 𝑓𝑎𝑛 𝑎𝑝𝑝𝑙𝑖𝑐𝑎𝑡𝑖𝑜𝑛)
Motor Use Factor: 𝐹𝑢𝑚 = 1.0 (𝐹𝑜𝑟 𝑔𝑒𝑛𝑒𝑟𝑎𝑙 𝑎𝑝𝑝𝑟𝑜𝑥𝑖𝑚𝑎𝑡𝑖𝑜𝑛)
Motor Load Factor: 𝐹𝑙𝑚 = 1.0 (𝐹𝑜𝑟 𝑔𝑒𝑛𝑒𝑟𝑎𝑙 𝑎𝑝𝑝𝑟𝑜𝑥𝑖𝑚𝑎𝑡𝑖𝑜𝑛)
HEAT LOAD COMPUTATIONS
Fourth Floor – South Wing, PUP Main Academic Building
Therefore,
𝑃𝑖𝑛
𝑄=𝑁× ×𝐹 ×𝐹
𝑓 𝑢𝑚 𝑙𝑚
𝜂𝑚
65𝑊
𝑄𝑓 = 3 × 𝑥 1.0 𝑥 1.0
0.70
𝐵𝑇𝑈
𝑄𝑓 = 278.57𝑊 𝑥 3.4122
ℎ𝑟 − 𝑊
𝑄𝑓 = 950.5414 𝐵𝑇𝑈
ℎ𝑟
b. Personal Computer
𝑄𝑠𝑒𝑛𝑠−𝑝𝑐 = 𝑃𝑖𝑛 × 𝐶𝐿𝐹
Number of Set: 𝑁 =2
Input Power: 𝑃𝑖𝑛 = 480 𝑊 × 0.50 (see note #18)
𝑃𝑖𝑛 = 240 𝑊
𝐵𝑇𝑈
𝑄𝑠𝑒𝑛𝑠−𝑎𝑝𝑝 = 300.65
ℎ𝑟
𝑩𝑻𝑼
𝐄𝐟𝐟𝐞𝐜𝐭𝐢𝐯𝐞 𝐑𝐨𝐨𝐦 𝐒𝐞𝐧𝐬𝐢𝐛𝐥𝐞 𝐇𝐞𝐚𝐭 𝐋𝐨𝐚𝐝(𝐒𝐮𝐦𝐦𝐚𝐭𝐢𝐨𝐧 𝐨𝐟 #"𝐬 𝟏 − 𝟗) = 𝟑𝟎𝟏𝟎𝟑. 𝟒𝟒
𝒉𝒓
HEAT LOAD COMPUTATIONS
Fourth Floor – South Wing, PUP Main Academic Building
B. LATENT HEAT COMPONENTS
1. PEOPLE
𝑄𝑙𝑎𝑡−𝑜𝑐𝑐 = 𝑁 × 𝐻𝑙𝑎𝑡−𝑜𝑐𝑐 × 𝐶𝐿𝐹
Number of Occupants: 𝑁 = 20
Latent Heat Gain: 𝐻𝑙𝑎𝑡−𝑜𝑐𝑐 = 55 𝑊 (𝑆𝑒𝑒 𝑁𝑜𝑡𝑒 #13)
Cooling Load Factor: 𝐶𝐿𝐹 = 1.0 (𝑆𝑒𝑒 𝑁𝑜𝑡𝑒 #14)
Therefore,
𝑄𝑙𝑎𝑡−𝑜𝑐𝑐 = 𝑁 × 𝐻𝑙𝑎𝑡−𝑜𝑐𝑐 × 𝐶𝐿𝐹
𝑄𝑙𝑎𝑡−𝑜𝑐𝑐 = 20 × 55 𝑊 × 1.0
𝐵𝑇𝑈
𝑄𝑙𝑎𝑡−𝑜𝑐𝑐 = 1100𝑊 𝑥 3.4122
ℎ𝑟−𝑊
𝐵𝑇𝑈
𝑄𝑙𝑎𝑡−𝑜𝑐𝑐 = 3753.42 ℎ𝑟
2. APPLIANCES
a. Fan Motors
𝑃𝑖𝑛
𝑄=𝑁× ×𝐹 ×𝐹
𝑓 𝑢𝑚 𝑙𝑚
𝜂𝑚
Number of Fan: 𝑁 =3
Input Power: 𝑃𝑖𝑛 = 65 𝑊 (𝑀𝑜𝑡𝑜𝑟 𝑃𝑜𝑤𝑒𝑟 𝐼𝑛𝑝𝑢𝑡)
Mechanical Efficiency: 𝜂𝑚 = 70% (𝑈𝑠𝑢𝑎𝑙𝑙𝑦 𝑓𝑜𝑟 𝑠𝑚𝑎𝑙𝑙 𝑓𝑎𝑛 𝑎𝑝𝑝𝑙𝑖𝑐𝑎𝑡𝑖𝑜𝑛)
Motor Use Factor: 𝐹𝑢𝑚 = 1.0 (𝐹𝑜𝑟 𝑔𝑒𝑛𝑒𝑟𝑎𝑙 𝑎𝑝𝑝𝑟𝑜𝑥𝑖𝑚𝑎𝑡𝑖𝑜𝑛)
Motor Load Factor: 𝐹𝑙𝑚 = 1.0 (𝐹𝑜𝑟 𝑔𝑒𝑛𝑒𝑟𝑎𝑙 𝑎𝑝𝑝𝑟𝑜𝑥𝑖𝑚𝑎𝑡𝑖𝑜𝑛)
Therefore,
𝑃𝑖𝑛
𝑄=𝑁× ×𝐹 ×𝐹
𝑓 𝑢𝑚 𝑙𝑚
𝜂𝑚
65𝑊
𝑄𝑓 = 3 × 𝑥 1.0 𝑥 1.0
0.70
𝐵𝑇𝑈
𝑄𝑓 = 278.57𝑊 𝑥 3.4122
ℎ𝑟 − 𝑊
𝐵𝑇𝑈
𝑄𝑓 = 950.54
ℎ𝑟
HEAT LOAD COMPUTATIONS
Fourth Floor – South Wing, PUP Main Academic Building
b. Personal Computer
𝑄𝑙 = 𝐶𝑙 × 𝑁 × 𝑃𝑖𝑛 × 𝐶𝐿𝐹
𝑄𝑙 = 𝐶𝑙 × 𝑁 × 𝑃𝑖𝑛 × 𝐶𝐿𝐹
𝐵𝑇𝑈
𝑅𝑜𝑜𝑚 𝐿𝑎𝑡𝑒𝑛𝑡 𝐻𝑒𝑎𝑡 𝐿𝑜𝑎𝑑 = 5379.52
ℎ𝑟
7. VENTILATION
𝑊 𝑐𝑓𝑚
𝐻𝑙𝑎𝑡−𝑣𝑒𝑛 = 1418.3889 × × 𝑁 × (∆𝑊)
𝑐𝑓𝑚 𝑝𝑒𝑟𝑠𝑜𝑛
𝑐𝑓𝑚
CFM per person: 20 (𝑆𝑒𝑒 𝑁𝑜𝑡𝑒 #20)
𝑝𝑒𝑟𝑠𝑜𝑛
Number of Occupants: 𝑁 = 20
Humidity Ratios:
At initial, using 𝑡𝑖𝑛 =23°𝐶 and RH = 55%
𝑘𝑔 𝑤. 𝑣.
𝑊1 = 0.00875
𝑘𝑔 𝑑. 𝑎.
At final, using 𝑡𝑜𝑚𝑎𝑥 =33.2°𝐶 for dry-bulb & 26.10°𝐶 for wet-bulb
(see note #21)
HEAT LOAD COMPUTATIONS
Fourth Floor – South Wing, PUP Main Academic Building
𝑘𝑔 𝑤. 𝑣.
𝑊2 = 0.01975
𝑘𝑔 𝑑. 𝑎.
∆𝑊 = 𝑊2 − 𝑊1
𝑘𝑔 𝑤. 𝑣.
∆𝑊 = (0.01975 − 0.00875)
𝑘𝑔 𝑑. 𝑎.
𝑘𝑔 𝑤.𝑣.
∆𝑊 = 0.011
𝑘𝑔 𝑑.𝑎.
𝑊
𝐻 = (1418.3889 ×
20 𝑐𝑓𝑚
× 20 × 0.011
𝑘𝑔 𝑤.𝑣.
)
𝑙𝑎𝑡−𝑣𝑒𝑛 𝑐𝑓𝑚 𝑝𝑒𝑟𝑠𝑜𝑛 𝑘𝑔 𝑑.𝑎.
𝐵𝑇𝑈
𝐻𝑙𝑎𝑡−𝑣𝑒𝑛 = 6240.911𝑊 × 3.4122
ℎ𝑟−𝑊
𝐵𝑇𝑈
21295.24
𝐻𝑙𝑎𝑡−𝑣𝑒𝑛 =
ℎ𝑟
𝑩𝑻𝑼
𝐄𝐟𝐟𝐞𝐜𝐭𝐢𝐯𝐞 𝐑𝐨𝐨𝐦 𝐋𝐚𝐭𝐞𝐧𝐭 𝐇𝐞𝐚𝐭 𝐋𝐨𝐚𝐝(𝐒𝐮𝐦𝐦𝐚𝐭𝐢𝐨𝐧 𝐨𝐟 #"𝐬 𝟒 − 𝟕) = 𝟐𝟕𝟒𝟖𝟏. 𝟔𝟗
𝒉𝒓
SUMMARY:
A. Total Internal Heat Load = ERSHL + ERLHL 57585.13 BTUH
B. Return Duct Heat Gain = 6% of A 3455.11 BTUH
C. Return Duct Leakage Losses = 3% of A 1727.55 BTUH