Service Accuracy Variance

Hierarchy : [Branch: Underground Mining Equipment] [Site: Tambomayo] [Equipment: (-1/9) ***]
Report Type : Detail
Date Range : [ago-2019 - sep-2019]
Analyse By : [Equipment]

Machine Within
Fleet Machine Service Type Down Date Usage Interval Variance % Variance Tolerance

Tambomayo - Scaler 2DR010 7523.0.PM.0 Preventive Maintenance 125 Hour 04/08/2019 4,804 181 31 20.9 % No
Tambomayo - Scaler 2DR010 7524.0.PM.0 Preventive Maintenance 250 Hour 23/08/2019 5,088 284 134 89.4 % No
Tambomayo - Scaler 2DR010 7527.0.PM.0 Preventive Maintenance 1000 Hour 01/09/2019 5,168 79 71 47.1 % No
Tambomayo - Scaler 2DR010 7523.0.PM.0 Preventive Maintenance 125 Hour 17/09/2019 5,321 153 3 2.0 % Sí
2DR010 174 60 39.8 % 25 %
Tambomayo - Rock Bol2JE027 6401.0.PM.0 Rock Drill Bolting - Service 1 02/08/2019 4,739 32 118 78.5 % No
Tambomayo - Rock Bol2JE027 6395.0.PM.0 Rock Drill - Service 1 17/08/2019 4,774 35 115 76.6 % No
Tambomayo - Rock Bol2JE027 6395.0.PM.0 Rock Drill - Service 1 02/09/2019 4,808 34 116 77.3 % No
Tambomayo - Rock Bol2JE027 6395.0.PM.0 Rock Drill - Service 1 12/09/2019 4,832 24 126 84.0 % No
2JE027 31 119 79.1 % 0 %
Tambomayo - Rock Bol2JE030 6395.0.PM.0 Rock Drill - Service 1 13/08/2019 2,741 75 75 49.8 % No
Tambomayo - Rock Bol2JE030 6395.0.PM.0 Rock Drill - Service 1 21/08/2019 2,756 15 135 90.2 % No
Tambomayo - Rock Bol2JE030 6395.0.PM.0 Rock Drill - Service 1 09/09/2019 2,781 25 125 83.5 % No
Tambomayo - Rock Bol2JE030 6395.0.PM.0 Rock Drill - Service 1 21/09/2019 2,801 20 130 86.5 % No
2JE030 34 116 77.5 % 0 %
Tambomayo - Jumbos 2JF027 PM01.0.PM.0 Rock Drill - Service 1 06/08/2019 4,895 45 80 64.2 % No
Tambomayo - Jumbos 2JF027 PD02.0.PD.0 Inspeccion Termografica-Camara 17/08/2019 4,933 38 87 69.5 % No
Tambomayo - Jumbos 2JF027 PM01.0.PM.0 Rock Drill - Service 1 26/08/2019 4,958 25 100 80.3 % No
Tambomayo - Jumbos 2JF027 CM03.0.SM.0 Panel Electrico 13/09/2019 5,014 56 69 55.3 % No
Tambomayo - Jumbos 2JF027 PM01.0.PM.0 Rock Drill - Service 1 23/09/2019 5,039 25 100 79.9 % No
2JF027 38 87 69.8 % 0 %
Tambomayo - Jumbos 2JF034 6396.0.PM.0 Rock Drill - Service 2 01/08/2019 3,522 20 105 83.6 % No
Tambomayo - Jumbos 2JF034 6395.0.PM.0 Rock Drill - Service 1 09/08/2019 3,553 30 95 75.9 % No
Tambomayo - Jumbos 2JF034 6395.0.PM.0 Rock Drill - Service 1 18/08/2019 3,592 40 85 68.2 % No
Tambomayo - Jumbos 2JF034 6395.0.PM.0 Rock Drill - Service 1 05/09/2019 3,663 71 54 43.1 % No
Tambomayo - Jumbos 2JF034 6395.0.PM.0 Rock Drill - Service 1 16/09/2019 3,709 46 79 63.5 % No
2JF034 41 84 66.9 % 0 %
Tambomayo - Scooptr 2SC057 7524.0.PM.0 Preventive Maintenance 250 Hour 08/08/2019 13,686 193 7 3.6 % Sí
Tambomayo - Scooptr 2SC057 7527.0.PM.0 Preventive Maintenance 1000 Hour 24/08/2019 13,883 198 2 1.2 % Sí
Tambomayo - Scooptr 2SC057 7524.0.PM.0 Preventive Maintenance 250 Hour 18/09/2019 14,069 185 15 7.4 % Sí
2SC057 192 8 4.1 % 100 %
Tambomayo - Scooptr 2SC066 7527.0.PM.0 Preventive Maintenance 1000 Hour 11/08/2019 7,744 214 14 6.9 % Sí
Tambomayo - Scooptr 2SC066 7524.0.PM.0 Preventive Maintenance 250 Hour 25/08/2019 7,938 195 5 2.6 % Sí
Tambomayo - Scooptr 2SC066 7525.0.PM.0 Preventive Maintenance 500 Hour 10/09/2019 8,157 219 19 9.3 % Sí
2SC066 209 12 6.2 % 100 %
Tambomayo - Telehand2TH002 7525.0.PM.0 Preventive Maintenance 500 Hour 11/08/2019 20,464 174 76 30.4 % No
Tambomayo - Telehand2TH002 7524.0.PM.0 Preventive Maintenance 250 Hour 30/08/2019 20,542 78 172 68.8 % No
2TH002 126 124 49.6 % 0 %
Total 94 78 53.3 % 23 %

lunes, 07 de octubre de 2019 03:59:26p.m. Página 2 de 2