Ws - Cebu Capitol

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 30

CLA

SF-AD-W
REVISIO

LBP RESOURCES AND DEVELOPMENT CORPORATION


WITHDRAWAL SLIP
WS No: CEBUREN-01
PROJECT/PURPOSE: LBP CEBU MANGO AVENUE BRANCH RELOC./RENOVATION Date of Request:
FULL WALL PARTITION
10/09/20
Quantity Unit Item Description Available
11.00 sheets 1/4" x 4' x 8' Marine Plywood
11.00 sheets 1/4" x 4' x 8' Ordinary Plywood
11.00 sheets 6mm x 4' x 8' Flexboard
36.00 pcs 0.6mm x 50mm x 100mm x 3m Metal Studs
22.00 pcs 0.6mm x 50mm x 100mm x 3m Metal Tracks
6.00 pcs 6.0mm x 50mm x 6m Flat Bar
15.00 pcs 2" x 4" x 12' s4s tanguile
4.00 sheet Cosmic dusk Formica Laminate, 0.8mm x 4' x 8'
8.00 sheets Wood Excel Laminate, 0.8mm x 4' x 8'
12.00 gals Adhesive (Rugby)
15.00 pcs. 4" x 4" Heavy Duty Butterfly Hinge
3.00 sets Abloy Door Closer 235
3.00 sets Push Plate Handle, Stainless
3.00 pcs Door Stopper
24.00 pcs. 8.0mm x 150mm x 150mm Steel Plate
40.00 pcs 12mmø x 2" Expansion Bolt
9.00 pcs 10mmø x 2" Expansion Bolt
2.00 boxes Blind Rivets, 1/8" x 3/4"
1.00 kgs. 5/8"X 3/4"Ficem Nails
3.00 pcs. Masonry Drill Bit, 12mm
1.00 kgs. Welding Rod
2.00 pc. 1/2" Steel Drill Bit
2.00 pc. 10mm dia. Masonry Drill Bit
3.00 pcs. 4" Cutting Disc
6.00 pcs. 1/8" Metal Drill Bit
3.00 kgs. Asstd. Finishing nails (2 kgs.-1-1/2" , 1kg. - 1")
4.00 pcs. 4" cutting Disc

Note: Requesting Unit must invariably cross all spaces not used below the last article.
[1] Requested By: [4] Recommending Approval:

HEBA S. TAMSILANI JOEY R. ATIENZA


Requesting Employee Unit Head
[2] Recommendation [5] Approved by:
For Release (Items Available in the Warehouse) For Release (Items Available in the Warehouse)
For PM Preparation (Items not Available in the Warehouse) For PM Preparation (Items not Available in the Warehouse)

NORBERTO A. COLINARES ALLAN G. REDONDO


Central Warehouseman Administrative and General Services Manag
[3] Checked within Cost Estimate: Distribution:

[1] Administrative Unit


JOBERT BARCE [2] Requesting Unit
Cost Engineer
CLASS D
SF-AD-WS-19
REVISION DATE:

AND DEVELOPMENT CORPORATION


WITHDRAWAL SLIP
CEBUREN-01
Date of Request:

10/09/2019
Not Available

JOEY R. ATIENZA
Unit Head

For PM Preparation (Items not Available in the Warehouse)

ALLAN G. REDONDO
Administrative and General Services Manager
[1] Administrative Unit
CLASS D
SF-AD-WS-19
REVISION DATE:

LBP RESOURCES AND DEVELOPMENT CORPORATION


WITHDRAWAL SLIP
WS No: CEBUREN-03REV
PROJECT/PURPOSE: LBP CEBU MANGO AVENUE BRANCH RELOC./RENOVATION Date of Request:
CEILING FINISHES
October 22, 2019
Quantity Unit Item Description Available
13 sheets 4.5mm thk x 4' x 8' Flexboard
8 pcs Steel Angle
8 pcs 12' Wall Angle, GI
23 pcs 0.40mm x 19mm x 25mm x 5m Furring Channel
16 pcs 1.00mm x 12mm x 38mm x 5m Carrying Channel
24 pcs #8 Hanger Rod
24 sets Suspension Clip & Rod Joiner
78 pcs W-Clips
3 kg 2" Concrete Nail
5 kg Ga.#16 GI Tie Wire
2 kgs. 7 x 25 Ficem screw
1 boxes 1/8" x 1/2" Blind rivets
27 pcs. Ramset Bullet
************Nothing Follows*************

Note: Requesting Unit must invariably cross all spaces not used below the last article.
[1] Requested By: [4] Recommending Approval:

HEBA S. TAMSILANI JOEY R. ATIENZA


Requesting Employee Unit Head
[2] Recommendation [5] Approved by:
For Release (Items Available in the Warehouse) For Release (Items Available in the Warehouse)
For PM Preparation (Items not Available in the Warehouse) For PM Preparation (Items not Available in the Warehouse)

NORBERTO A. COLINARES ALLAN G. REDONDO


Central Warehouseman Administrative and General Services Manager
[3] Checked within Cost Estimate: Distribution:

[1] Administrative Unit


JOBERT BARCE [2] Requesting Unit
Cost Engineer
CLASS D
SF-AD-WS-19
REVISION DATE:

CES AND DEVELOPMENT CORPORATION


WITHDRAWAL SLIP
CEBUREN-03REV
Date of Request:

October 22, 2019


Not Available

JOEY R. ATIENZA
Unit Head

For PM Preparation (Items not Available in the Warehouse)

ALLAN G. REDONDO
Administrative and General Services Manager
CLASS D
SF-AD-WS-19
REVISION DATE:

LBP RESOURCES AND DEVELOPMENT CORPORATION


WITHDRAWAL SLIP
WS No: CEBUREN-03
PROJECT/PURPOSE: LBP CEBU MANGO AVENUE BRANCH RELOC./RENOVATION Date of Request:
CEILING FINISHES
November 5, 2019
Quantity Unit Item Description Available
226 pcs. 10mm thk x 600m x 600mm laminated Gypsum board
25 pcs. Shadow Moulding, 3m
32 pcs. Main tee 12', Baked white
334 pcs. Cross tee 2', Baked White
82 pcs. Suspension clip and rod joiner
82 pcs. #8 Hanger Rod
4 kgs. Welding Rod E6014
3 kgs. Concrete nails
5 kgs. Ga. #16 G.I. tie wire
************Nothing Follows*************

Note: Requesting Unit must invariably cross all spaces not used below the last article.
[1] Requested By: [4] Recommending Approval:

HEBA S. TAMSILANI JOEY R. ATIENZA


Requesting Employee Unit Head
[2] Recommendation [5] Approved by:
For Release (Items Available in the Warehouse) For Release (Items Available in the Warehouse)
For PM Preparation (Items not Available in the Warehouse) For PM Preparation (Items not Available in the Warehouse)

NORBERTO A. COLINARES ALLAN G. REDONDO


Central Warehouseman Administrative and General Services Manager
[3] Checked within Cost Estimate: Distribution:

[1] Administrative Unit


JOBERT BARCE [2] Requesting Unit
Cost Engineer
CLASS D
SF-AD-WS-19
REVISION DATE:

CES AND DEVELOPMENT CORPORATION


WITHDRAWAL SLIP
CEBUREN-03
Date of Request:

November 5, 2019
Not Available

JOEY R. ATIENZA
Unit Head

For PM Preparation (Items not Available in the Warehouse)

ALLAN G. REDONDO
Administrative and General Services Manager
CLASS D
SF-AD-WS-19
REVISION DATE:

LBP RESOURCES AND DEVELOPMENT CORPORATION


WITHDRAWAL SLIP
WS No: UMIREN-03
PROJECT/PURPOSE: LBP CEBU MANGO AVENUE BRANCH RELOC./RENOVATION Date of Request:
TILES & TILE ADHESIVES
July 24, 2019
Quantity Unit Item Description Available Not Available
30 pcs 60cm x 60cm Ceramic Tiles Matte VFT Madison Ivory
333 pcs 20cm x 20cm Ceramic Tiles, Romana White
23 pcs 60cm x 60cm Ceramic Wall Tile
23 pcs 20cm x 60cm Ceramic Wall Tile
167 pcs 30cm x 60cm Ceramic Wall Tile, Fiorello Beige
10 pcs 12' Tile trim (Color: Beige)
26 bags ABC Heavy Tile Adhesive (25 kgs)
12 bags ABC Tile Grout (2 kgs)
4 gal Grout Sealer
10 pcs 4" Cutting Disc
****************Nothing Follows****************

Note: Requesting Unit must invariably cross all spaces not used below the last article.
[1] Requested By: [4] Recommending Approval:

HEBA S. TAMSILANI JOEY R. ATIENZA


Requesting Employee Unit Head
[2] Recommendation [5] Approved by:
For Release (Items Available in the Warehouse) For Release (Items Available in the Warehouse)
For PM Preparation (Items not Available in the Warehouse) For PM Preparation (Items not Available in the Warehouse)

NORBERTO A. COLINARES ALLAN G. REDONDO


Central Warehouseman Administrative and General Services Manager
[3] Checked within Cost Estimate: Distribution:

[1] Administrative Unit


JOBERT BARCE [2] Requesting Unit
Cost Engineer
CLASS D
SF-AD-WS-19
REVISION DATE:

LBP RESOURCES AND DEVELOPMENT CORPORATION


WITHDRAWAL SLIP
WS No: UMIREN-3b
PROJECT/PURPOSE: LBP CEBU MANGO AVENUE BRANCH RELOC./RENOVATION Date of Request:
CUTTING LIST OF 3/4" JET BLACK GRANITE
September 4, 2019
Quantity Unit Item Description Available Not Available
Pantry
1.00 set 3.0mL x 0.60mH 3/4" Jet Black Granite
1.00 set 3.0mL x 0.60mH 3/4" Jet Black Granite
1.00 set 3.0mL x 0.20mH 3/4" Jet Black Granite
1.00 set 3.0mL x 0.20mH 3/4" Jet Black Granite
1.00 set 0.60mL x 0.20mH 3/4" Jet Black Granite
1.00 set 2.20mL x 0.10mH 3/4" Jet Black Granite
1.00 set 2.50mL x 0.10mH 3/4" Jet Black Granite
1.00 set 0.60mL x 0.10mH 3/4" Jet Black Granite
Female CR & Male CR
1 set 1.50mL x 0.60mH 3/4" Jet Black Granite
1 set 1.50mL x 0.20mH 3/4" Jet Black Granite
1 set 0.60mL x 0.20mH 3/4" Jet Black Granite
1 set 1.50mL x 0.10mH 3/4" Jet Black Granite
1.00 set 0.60mL x 0.10mH 3/4" Jet Black Granite
1.00 set 1.50mL x 0.60mH 3/4" Jet Black Granite
1.00 set 1.50mL x 0.20mH 3/4" Jet Black Granite
2.00 sets 0.60mL x 0.20mH 3/4" Jet Black Granite
1.00 set 1.50mL x 0.10mH 3/4" Jet Black Granite
1.00 set 0.60mL x 0.10mH 3/4" Jet Black Granite

Note: Requesting Unit must invariably cross all spaces not used below the last article.
[1] Requested By:

HEBA S. TAMSILANI JOEY R. ATIENZA


Requesting Employee Unit Head
[2] Recommendation [5] Approved by:
For Release (Items Available in the Warehouse) For Release (Items Available in the Warehouse)
For PM Preparation (Items not Available in the Warehouse) For PM Preparation (Items not Available in the Warehouse)

NORBERTO A. COLINARES ALLAN G. REDONDO


Central Warehouseman Administrative and General Services Manager
[3] Checked within Cost Estimate: Distribution:

[1] Administrative Unit


JOBERT BARCE [2] Requesting Unit
Cost Engineer
CLASS D
SF-AD-WS-19
REVISION DATE:

LBP RESOURCES AND DEVELOPMENT CORPORATION


WITHDRAWAL SLIP
WS No: CEBUREN-04
PROJECT/PURPOSE: LBP CEBU MANGO AVENUE BRANCH RELOC./RENOVATION Date of Request:
FIRE RATED STEEL DOORS LOCKSET &
ACESSORIES October 9, 2019
Quantity Unit Item Description Available
1 set (D-2) 1.0mW x 2.1mH Fire rated steel flush door
and door jamb (By federals doortech system or approved
equal) with primer paint
for Fire Exit , one-leaf door
Swing to the LEFT from inside
Door Accessories & Lockset:
1-Set Von Duprin 22EO- Fire Rated SP28
Abloy DC 235 Door Closr
Hager peep hole
4pcs 3mm x 4" x 4" S/S 2BB Butt Hinges
****************Nothing Follows****************

Note: Requesting Unit must invariably cross all spaces not used below the last article.
[1] Requested By: [4] Recommending Approval:

HEBA S. TAMSILANI JOEY R. ATIENZA


Requesting Employee Unit Head
[2] Recommendation [5] Approved by:
For Release (Items Available in the Warehouse) For Release (Items Available in the Warehouse)
For PM Preparation (Items not Available in the Warehouse) For PM Preparation (Items not Available in the Warehouse)

NORBERTO A. COLINARES ALLAN G. REDONDO


Central Warehouseman Administrative and General Services Manager
[3] Checked within Cost Estimate: Distribution:

[1] Administrative Unit


JOBERT BARCE [2] Requesting Unit
Cost Engineer
CLASS D
SF-AD-WS-19
REVISION DATE:

CES AND DEVELOPMENT CORPORATION


WITHDRAWAL SLIP
CEBUREN-04
Date of Request:

October 9, 2019
Not Available

JOEY R. ATIENZA
Unit Head

For PM Preparation (Items not Available in the Warehouse)

ALLAN G. REDONDO
Administrative and General Services Manager
CLASS D
SF-AD-WS-19
REVISION DATE:

LBP RESOURCES AND DEVELOPMENT CORPORATION


WITHDRAWAL SLIP
WS No: CEBUREN-04A
PROJECT/PURPOSE: LBP CEBU MANGO AVENUE BRANCH RELOC./RENOVATION Date of Request:
METAL FLUSHED DOOR LOCKSET &
ACESSORIES October 9, 2019
Quantity Unit Item Description Available
1 set (D-3) 1.8mW x 2.1mH 44mm thk metal flushed type louvered
Ga. 18 door panel (louver type) & Ga. #16 Single
Rabbet 45mm x 100mm for Genset Room , two-leaf door
Location: Electrical Room
Door Accessories & Lockset:
1-Set Abloy 4190 w/4690 Striker Plate
Abloy CY028C Single Cylinder
Abloy 16/006 Polarita Handle
6pcs 3mm x 4" x 4" S/S Bearing Hinges
****************Nothing Follows****************

Note: Requesting Unit must invariably cross all spaces not used below the last article.
[1] Requested By: [4] Recommending Approval:

HEBA S. TAMSILANI JOEY R. ATIENZA


Requesting Employee Unit Head
[2] Recommendation [5] Approved by:
For Release (Items Available in the Warehouse) For Release (Items Available in the Warehouse)
For PM Preparation (Items not Available in the Warehouse) For PM Preparation (Items not Available in the Warehouse)

NORBERTO A. COLINARES ALLAN G. REDONDO


Central Warehouseman Administrative and General Services Manager
[3] Checked within Cost Estimate: Distribution:

[1] Administrative Unit


JOBERT BARCE [2] Requesting Unit
Cost Engineer
CLASS D
SF-AD-WS-19
REVISION DATE:

CES AND DEVELOPMENT CORPORATION


WITHDRAWAL SLIP
CEBUREN-04A
Date of Request:

October 9, 2019
Not Available

JOEY R. ATIENZA
Unit Head

For PM Preparation (Items not Available in the Warehouse)

ALLAN G. REDONDO
Administrative and General Services Manager
CLASS D
SF-AD-WS-19
REVISION DATE:

LBP RESOURCES AND DEVELOPMENT CORPORATION


WITHDRAWAL SLIP
WS No: CEBUREN-08
PROJECT/PURPOSE: LBP CEBU MANGO AVENUE BRANCH RELOC./RENOVATI Date of Request:
CABINETS FOR PANTRY & CASH VAULT
November 6, 2019
Quantity Unit Item Description Not Available
3/4" Marine Plywood Hanging Cabinet with Inside Counter for:
5 lm a. Cash Vault
4 lm b. Pantry
3/4" Marine Plywood Base Cabinet with Inside Counter for:
4 lm a. Pantry
***********Nothing Follows************

Note: Requesting Unit must invariably cross all spaces not used below the last article.
[1] Requested By: [4] Recommending Approval:

HEBA S. TAMSILANI JOEY R. ATIENZA


Requesting Employee Unit Head
[2] Recommendation [5] Approved by:
For Release (Items Available in the Warehouse) For Release (Items Available in the Warehouse)
For PM Preparation (Items not Available in the Warehouse) For PM Preparation (Items not Available in the Warehouse)

NORBERTO A. COLINARES ALLAN G. REDONDO


Central Warehouseman Administrative and General Services Manager
[3] Checked within Cost Estimate: Distribution:

[1] Administrative Unit


JOBERT BARCE [2] Requesting Unit
Cost Engineer
CLASS D
SF-AD-WS-19
REVISION DATE:

LBP RESOURCES AND DEVELOPMENT CORPORATION


WITHDRAWAL SLIP
WS No: CEBUREN-09
PROJECT/PURPOSE: LBP CEBU MANGO AVE.BRANCH RELOC./RENOVATION Date of Request:
PREFABRICATED MATERIALS & LOCKSET
INCLUDING GRAB RAIL November 6, 2019
Quantity Unit Item Description Available Not Available
1 set (D-1) Security Steel Grilles at Main Entrance with
Primer Paint with transom
Door: 1.90mL x 2.10mH
Transom: 1.90mL x 0.30mH
1 set Inner Lockset & accessories at Cash Vault
Abloy 4190 Lock Case with Abloy 4690 Striker plate
Abloy CY029C Double Cylinder
Dimension: 3.390mL x 2.350mH
Security Steel Grilles at the following:
1 lot Hazardous Waste Bin Enclosure w/ 4 units 600mm dia. X
1000mH Container Drums
1 lot Generator Set Housing w/roofing and painting
38mm Ø Stainless Steel Pipe Railing at the following:
6.40 lm > Ramp
8.00 lm > ATM Transaction Area
************Nothing Follows************

Note: Requesting Unit must invariably cross all spaces not used below the last article.
[1] Requested By: [4] Recommending Approval:

HEBA S. TAMSILANI JOEY R. ATIENZA


Requesting Employee Unit Head
[2] Recommendation [5] Approved by:
For Release (Items Available in the Warehouse) For Release (Items Available in the Warehouse)
For PM Preparation (Items not Available in the Warehouse) For PM Preparation (Items not Available in the Warehouse)

NORBERTO A. COLINARES ALLAN G. REDONDO


Central Warehouseman Administrative and General Services Manager
[3] Checked within Cost Estimate: Distribution:

[1] Administrative Unit


JOBERT BARCE [2] Requesting Unit
Cost Engineer
CLASS D
SF-AD-WS-19
REVISION DATE:

LBP RESOURCES AND DEVELOPMENT CORPORATION


WITHDRAWAL SLIP
WS No: CEBUREN-10
PROJECT/PURPOSE: LBP CEBU MANGO AVE.BRANCH RELOC./RENOVATION Date of Request:
CARPENTRY WORKS
November 6, 2019
Quantity Unit Item Description Available Not Available
1 sheet 3/4" x 4' x 8' marine plywood (Cove)
9 sheets 8mm x 4' x 8' flexboard
18 pcs. 0.4mmthkx45mmx15mmx5m furring channel
4 pcs. 4.5mm thk x 38mm x 38mm x 6m Angle Bar
53 pcs. 10mm x 2" expansion bolt
1 pcs. Metal Drill bit 1/8"
1 pcs. Masonry Drill Bit 10mm
2 boxes 1/8" x 3/4" Blind rivet
5 kgs Concrete nails 3"
14 pcs. #1 Concealed Hinges, Soft Close
48 pcs. #2 Concealed Hinges, Soft Close
16 pcs. Dual lock
16 pcs. Hook and Eye
4 kgs. Asstd. Finishing nails (2 kgs. - 2", 2 kgs. - 1-1/2")
4 lit Stickwell wood glue
4 pcs. 2" x 3" x 12' s4s KD
48 pcs. 1/2" x 1" x 12' s4s KD
22 pcs. 0.6mm x 35mm x 76mmx3m metal studs
32 pcs. 0.6mm x 35mm x 76mmx3m metal tracks
1 pcs. Masonry Drill Bit, 10mm
4 pcs. Metal Drill Bit, 1/8"
************Nothing Follows************

Note: Requesting Unit must invariably cross all spaces not used below the last article.
[1] Requested By: [4] Recommending Approval:

HEBA S. TAMSILANI JOEY R. ATIENZA


Requesting Employee Unit Head
[2] Recommendation [5] Approved by:
For Release (Items Available in the Warehouse) For Release (Items Available in the Warehouse)
For PM Preparation (Items not Available in the Warehouse) For PM Preparation (Items not Available in the Warehouse)

NORBERTO A. COLINARES ALLAN G. REDONDO


Central Warehouseman Administrative and General Services Manager
[3] Checked within Cost Estimate: Distribution:

[1] Administrative Unit


JOBERT BARCE [2] Requesting Unit
Cost Engineer
CLASS D
SF-AD-WS-19
REVISION DATE:

LBP RESOURCES AND DEVELOPMENT CORPORATION


WITHDRAWAL SLIP
WS No:
PROJECT/PURPOSE: Date of Request:

Quantity Unit Item Description Available Not Available

Note: Requesting Unit must invariably cross all spaces not used below the last article.
[1] Requested By: [4] Recommending Approval:

JOEY R. ATIENZA
Requesting Employee Unit Head
[2] Recommendation [5] Approved by:
For Release (Items Available in the Warehouse) For Release (Items Available in the Warehouse)
For PM Preparation (Items not Available in the Warehouse) For PM Preparation (Items not Available in the Warehouse)

NORBERTO A. COLINARES ALLAN G. REDONDO


Central Warehouseman Administrative and General Services Manager
[3] Checked within Cost Estimate: Distribution:

[1] Administrative Unit


JOBERT BARCE [2] Requesting Unit
Cost Engineer
CLASS
SF-AD-WS-19
REVISION DAT

LBP RESOURCES AND DEVELOPMENT CORPORATION


WITHDRAWAL SLIP
WS No: CEBUREN-06
PROJECT/PURPOSE: LBP CEBU MANGO AVENUE BRANCH RELOC./RENOVATION Date of Request:
WATERLINES SYSTEM - REHAU PIPING
October 9, 2019
Quantity Unit Item Description Available
4 pcs REHAU Coated Pipe 20 x 2.8
6 pcs REHAU Coated Pipe 25 x 3.5
2 pcs Adaptor 20 x 2.8 R 1
2 pcs Adaptor 25 x 3.5 R 3/4
1 pcs End Plug 20mm
2 pcs PX Elbow 20 x 90°
1 pcs PX Elbow 25 x 90°
3 pcs PX Coupling 20 uniform
3 pcs PX Coupling 25 uniform
3 pcs PX Coupling 25 x 20
3 pcs PX Coupling 32 x 25
3 pcs PX Sleeve 20 compression
3 pcs PX Sleeve 25 compression
0 pcs T-piece 32 x Rp 1 x 32
1 pcs T-piece WM, 20 x 2.8-Rp 1/2 x 20
1 pcs PX T-piece 25 x 20 x 25
1 pcs PX T-piece 25 x 25 x 25
0 pcs Ball Valve 20mm
1 pcs Plastic Plug
1 pc Gate Valve
2 rolls teflon tape
****************Nothing Follows****************

****************Nothing Follows****************
Note: Requesting Unit must invariably cross all spaces not used below the last article.
[1] Requested By: [4] Recommending Approval:

HEBA S. TAMSILANI JOEY R. ATIENZA


Requesting Employee Unit Head
[2] Recommendation [5] Approved by:
For Release (Items Available in the Warehouse) For Release (Items Available in the Warehouse)
For PM Preparation (Items not Available in the WarehousFor PM Preparation (Items not Available in the Warehouse)

NORBERTO A. COLINARES ALLAN G. REDONDO


Central Warehouseman Administrative and General Services Manager
[3] Checked within Cost Estimate: Distribution:

[1] Administrative Unit


JOBERT BARCE [2] Requesting Unit
Cost Engineer
CLASS D
SF-AD-WS-19
REVISION DATE:

CES AND DEVELOPMENT CORPORATION


WITHDRAWAL SLIP
CEBUREN-06
Date of Request:

October 9, 2019
Not Available

JOEY R. ATIENZA
Unit Head

ALLAN G. REDONDO
Administrative and General Services Manager
CLASS D
SF-AD-WS-19
REVISION DATE:

LBP RESOURCES AND DEVELOPMENT CORPORATION


WITHDRAWAL SLIP
WS No: CEBUREN-05
PROJECT/PURPOSE: LBP CEBU MANGO AVENUE BRANCH RELOC./RENOVATI Date of Request:
SANITARY LINES (NELTEX PIPING) SERIES 1000
INCLUDING PLUMBING FIXUTRES October 9, 2019
Quantity Unit Item Description Available Not Available
6 m 4"ø x 3.0m PVC pipe, Neltex
8 m 2"ø x 3.0m PVC pipe, Neltex
4 pc/s 2"ø x 90 deg PVC elbow
4 pc/s 4"Coupling
4 pc/s 2"Coupling
2 pc/s 4" x 2" x 4" ø PVC wye
2 pc/s 4"ø PVC Clean-out
1 pc/s 2"ø PVC P-trap
3 pc/s 2"ø PVC tee
4 pc/s 4"ø PVC tee
4 can/s 400 cc solvent cement
1 gal/s Epoxy A&B
1 set Stainless Steel Grease Trap, 5Gpm Capacity
****************Nothing Follows****************

Note: Requesting Unit must invariably cross all spaces not used below the last article.
[1] Requested By: [4] Recommending Approval:

HEBA S. TAMSILANI JOEY R. ATIENZA


Requesting Employee Unit Head
[2] Recommendation [5] Approved by:
For Release (Items Available in the Warehouse) For Release (Items Available in the Warehouse)
For PM Preparation (Items not Available in the Warehouse) For PM Preparation (Items not Available in the Warehouse)

NORBERTO A. COLINARES ALLAN G. REDONDO


Central Warehouseman Administrative and General Services Manager
[3] Checked within Cost Estimate: Distribution:

[1] Administrative Unit


JOBERT BARCE [2] Requesting Unit
Cost Engineer
CLASS D
SF-AD-WS-19
REVISION DATE:

LBP RESOURCES AND DEVELOPMENT CORPORATION


WITHDRAWAL SLIP
WS No: CEBUREN-02A
PROJECT/PURPOSE: LBP CEBU MANGO AVENUE BRANCH RELOC./RENOVATION Date of Request:
TEMPORARY FACILITIES October 9, 2019
Quantity Unit Item Description Available Not Available
1 pcs. Electric Grinder
1 pcs. Electric Drill
2 pcs. Shovel (pointed or flat)
2 units Claw Bar (big & small)
1 unit Jackhammer
1 pcs. Rebar Bender tools (10mmØ, 12mmØ & 16mmØ)
1 pcs. Sledge Hammer
6 pcs. Hacksaw Blade
15 pcs. MasonryDrill Bit (5pcs- 1/2", 5pcs-3/8", 5pcs.-1/4")
8 pcs. 1/2" x 4' x 8' ordinary plywood
6 kgs. CWN (2kgs-1-1/2", 2kgs-2", 2kgs - 3")
6 kgs. Concrete Nails (2kgs-2", 2kgs-3", 2kgs - 4")
20 kgs. Ga.# 16 G.I Tie wire
16 pcs. H-frame 1.70m x 1.20m steel scaffoldings
16 pcs. Cross Brace 1.70m x 1.230m Steel Scaffoldings
2 pcs. Catwalk (1.5mL x 0.4mW)
4 pcs. Caster Wheel/Break pad
10 sets Worker's Uniform
50 pcs. G.I. pipe 1-1/2"Ø Schd. 20 (30 pcs.-3m; 20 pcs.-2m)
1 unit Plastic Container Drum
1 lot First Aid Kit
1 lot Safety Goggles
5 pairs Hand Gloves
****************Nothing Follows****************

Note: Requesting Unit must invariably cross all spaces not used below the last article.
[1] Requested By: [4] Recommending Approval:

HEBA S. TAMSILANI JOEY R. ATIENZA


Requesting Employee Unit Head
[2] Recommendation [5] Approved by:
For Release (Items Available in the Warehouse) For Release (Items Available in the Warehouse)
For PM Preparation (Items not Available in the Warehouse) For PM Preparation (Items not Available in the Warehouse)

NORBERTO A. COLINARES ALLAN G. REDONDO


Central Warehouseman Administrative and General Services Manager
[3] Checked within Cost Estimate: Distribution:

[1] Administrative Unit


JOBERT BARCE [2] Requesting Unit
Cost Engineer
CLASS D
SF-AD-WS-19
REVISION DATE:

LBP RESOURCES AND DEVELOPMENT CORPORATION


WITHDRAWAL SLIP
WS No: CEBUREN-02B
PROJECT/PURPOSELBP CEBU MANGO AVENUE BRANCH RELOC./RENOVATION Date of Request:
TEMPORARY FACILITIES October 9, 2019
Quantity Unit Item Description Available Not Available
130 pcs. Swivel Clamp
35 pcs. 60cm x 120cm Phenolic Form
30 pcs. 50cm x 120cm Phenolic Form
20 pcs. 45cm x 120cm Phenolic Form
30 pcs. 20cm x 120cm Phenolic Form
1 lot Safety Signages
1 lot COA Billboard 8'
****************Nothing Follows****************

Note: Requesting Unit must invariably cross all spaces not used below the last article.
[1] Requested By: [4] Recommending Approval:

HEBA S. TAMSILANI JOEY R. ATIENZA


Requesting Employee Unit Head
[2] Recommendation [5] Approved by:
For Release (Items Available in the Warehouse) For Release (Items Available in the Warehouse)
For PM Preparation (Items not Available in the Warehouse) For PM Preparation (Items not Available in the Warehouse)

NORBERTO A. COLINARES ALLAN G. REDONDO


Central Warehouseman Administrative and General Services Manager
[3] Checked within Cost Estimate: Distribution:

[1] Administrative Unit


JOBERT BARCE [2] Requesting Unit
Cost Engineer
CLASS D
SF-AD-WS-19
REVISION DATE:

LBP RESOURCES AND DEVELOPMENT CORPORATION


WITHDRAWAL SLIP
WS No: CEBUREN-07A
PROJECT/PURPOSE: LBP CEBU MANGO AVENUE BRANCH RELOC./RENOVATION Date of Request:
PAINTING WORKS & EPOXY PAINT FINISH October 9, 2019
Quantity Unit Item Description Available
17 gals Permacoat Flat Latex B-701
6 gals Masonry Putty B-7311
1 gals Concrete Neutralizer
1 bags Patching Compound
14 gals Permacoat Latex Topcoat B-715
5 gals Boysen Flatwall Enamel B-200
3 gals Glazing Putty B-311
8 gals Boysen Semi-gloss Enamel B-200
3 gals Epoxy Primer
4 gals Quick Dry Enamel
2 lit. Paint Thinner
1 gals Boysen Lacquer Primer Surfacer B-305
1 gals Boysen Lacquer Spot Putty B-306
1 gals Boysen Automotive Lacquer B-1300
1 gals Boysen Lacquer Thinner
5 pcs. Paint Roller w/tray
5 pcs. 2" Paint Brush
5 pcs. 3" Paint Brush
5 pcs. 5" Paint Brush
**************Nothing Follows**************

Note: Requesting Unit must invariably cross all spaces not used below the last article.
[1] Requested By: [4] Recommending Approval:

HEBA S. TAMSILANI JOEY R. ATIENZA


Requesting Employee Unit Head
[2] Recommendation [5] Approved by:
For Release (Items Available in the Warehouse) For Release (Items Available in the Warehouse)
For PM Preparation (Items not Available in the Warehouse) For PM Preparation (Items not Available in the Warehouse)

NORBERTO A. COLINARES ALLAN G. REDONDO


Central Warehouseman Administrative and General Services Manager
[3] Checked within Cost Estimate: Distribution:

[1] Administrative Unit


JOBERT BARCE [2] Requesting Unit
Cost Engineer
CLASS D
SF-AD-WS-19
REVISION DATE:

CES AND DEVELOPMENT CORPORATION


WITHDRAWAL SLIP
CEBUREN-07A
Date of Request:
October 9, 2019
Not Available

JOEY R. ATIENZA
Unit Head

For PM Preparation (Items not Available in the Warehouse)

ALLAN G. REDONDO
Administrative and General Services Manager
CLASS D
SF-AD-WS-19
REVISION DATE:

LBP RESOURCES AND DEVELOPMENT CORPORATION


WITHDRAWAL SLIP
WS No: CEBUREN-08
PROJECT/PURPOSE: LBP CEBU MANGO AVENUE BRANCH RELOC./RENOVATION Date of Request:
TILES & TILE ADHESIVES October 21, 2019
Quantity Unit Item Description Available
475 pcs. 600mm x 600mm Homogeneous Polished Tiles (HE601)
70 bags ABC Heavy Duty Tile Adhesive (25 kgs.)
12 bags ABC tile grout (3 kgs.)
5 lit Grout Sealer
20 lit ABC Redifix
10 pcs. 4" Cutting Disc ,Diamond
**************Nothing Follows**************

Note: Requesting Unit must invariably cross all spaces not used below the last article.
[1] Requested By: [4] Recommending Approval:

HEBA S. TAMSILANI JOEY R. ATIENZA


Requesting Employee Unit Head
[2] Recommendation [5] Approved by:
For Release (Items Available in the Warehouse) For Release (Items Available in the Warehouse)
For PM Preparation (Items not Available in the Warehouse) For PM Preparation (Items not Available in the Warehouse)

NORBERTO A. COLINARES ALLAN G. REDONDO


Central Warehouseman Administrative and General Services Manager
[3] Checked within Cost Estimate: Distribution:

[1] Administrative Unit


JOBERT BARCE [2] Requesting Unit
Cost Engineer
CLASS D
SF-AD-WS-19
REVISION DATE:

CES AND DEVELOPMENT CORPORATION


WITHDRAWAL SLIP
CEBUREN-08
Date of Request:
October 21, 2019
Not Available

JOEY R. ATIENZA
Unit Head

For PM Preparation (Items not Available in the Warehouse)

ALLAN G. REDONDO
Administrative and General Services Manager
CLASS D
SF-AD-WS-19
REVISION DATE:

LBP RESOURCES AND DEVELOPMENT CORPORATION


WITHDRAWAL SLIP
WS No: CEBUREN-07B
PROJECT/PURPOSE: LBP CEBU MANGO AVENUE BRANCH RELOC./RENOVATION Date of Request:
PAINTING WORKS & EPOXY PAINT FINISH October 9, 2019
Quantity Unit Item Description Available Not Available
5 1/4 lit. tinting colors (lamp black)
5 1/4 lit. tinting colors (hansa yellow)
5 1/4 lit. tinting colors (thalo green)
5 1/4 lit. tinting colors (bulletin red)
10 1/4 lit. sand paper #100
10 1/4 lit. sand paper #200
5 kgs. stopa rugs
5 lit. Polituff
5 pcs. Baby Roller Cotton
5 pcs. Roller Foam
**************Nothing Follows**************

Note: Requesting Unit must invariably cross all spaces not used below the last article.
[1] Requested By: [4] Recommending Approval:

HEBA S. TAMSILANI JOEY R. ATIENZA


Requesting Employee Unit Head
[2] Recommendation [5] Approved by:
For Release (Items Available in the Warehouse) For Release (Items Available in the Warehouse)
For PM Preparation (Items not Available in the Wareho For PM Preparation (Items not Available in the Warehouse)

NORBERTO A. COLINARES ALLAN G. REDONDO


Central Warehouseman Administrative and General Services Manager
[3] Checked within Cost Estimate: Distribution:

[1] Administrative Unit


JOBERT BARCE [2] Requesting Unit
Cost Engineer
CLASS D
SF-AD-WS-19
REVISION DATE:

LBP RESOURCES AND DEVELOPMENT CORPORATION


WITHDRAWAL SLIP
WS No: UMIREN-14
PROJECT/PURPOSE: LBP CEBU MANGO AVENUE BRANCH RELOC./RENOVAT Date of Request:
GLASS & ALUMINUUM WORKS July 29, 2019
Quantity Unit Item Description Available Not Available
1 set (D-1) 6mm thk ordinary glass door (Color: Green)
50mm x 75mm Baked PowderCoated Aluminum Frame
w/ 50mm x 100mm jamb with awning type operable
panel at transom
Location: Main Entrance
Dimension:1.80mL x 2.10mH -DOOR
1.80mL x 0.50mH -TRANSOM
1 set (W-3) Aluminum awning window with 4mm thk ordinary green
glass (Color: Transoformer Gray)
Location: Female CR
Dimension:0.70mL x 0.5mH
2 sets 6mm thk mirror on aluminum frame with 6mm thk
ordinary plywood backing
Dimension:1.35mL x 1.10mH
**************Nothing Follows**************

Note: Requesting Unit must invariably cross all spaces not used below the last article.
[1] Requested By: [4] Recommending Approval:

HEBA S. TAMSILANI JOEY R. ATIENZA


Requesting Employee Unit Head
[2] Recommendation [5] Approved by:
For Release (Items Available in the Warehouse) For Release (Items Available in the Warehouse)
For PM Preparation (Items not Available in the Wareh For PM Preparation (Items not Available in the Warehouse)

NORBERTO A. COLINARES ALLAN G. REDONDO


Central Warehouseman Administrative and General Services Manager
[3] Checked within Cost Estimate: Distribution:

[1] Administrative Unit


JOBERT BARCE [2] Requesting Unit
Cost Engineer
CLASS D
SF-AD-WS-19
REVISION DATE:

LBP RESOURCES AND DEVELOPMENT CORPORATION


WITHDRAWAL SLIP
WS No: UMIREN-15
PROJECT/PURPOSE: LBP CEBU MANGO AVENUE BRANCH RELOC./RENOVATION Date of Request:
WATER LINES (REHAU PIPING)
July 29, 2019
Quantity Unit Item Description Available Not Available
20 m Rehau Coated Pipe 20 x 2.8
30 m Rehau Coated Pipe 25 x 3.5
5 pc/s Adaptor (20 x 2.8 R 1/2)
6 pc/s Adaptor (25x 3.4 R 3/4)
4 pc/s End plug 20mm
3 pc/s Male Reducer 25 x 3/4
8 pc/s PX elbow 20 x 90
21 pc/s PX elbow 25 x 90
1 pc/s PX Coupling 20 uniform
3 pc/s PX Coupling 25 uniform
4 pc/s px coupling 25 x 20
42 pc/s px sleeve 20comp
38 pc/s px sleeve 25comp
7 pc/s T-piece WM, 20 x 2.8 Rp 1/2 x 20
1 pc/s T-piece WM, 25 x 2.8 Rp 3/4 x 25
6 pc/s PX T-piece 25 x 25 x 25
12 pc/s PX T-piece 25 x 20 x 25
8 pc/s plastic plug 20mm
3 pc/s 25mm" Ø gate valve
2 rolls teflon tape
****************Nothing Follows****************

Note: Requesting Unit must invariably cross all spaces not used below the last article.
[1] Requested By: [4] Recommending Approval:

HEBA S. TAMSILANI JOEY R. ATIENZA


Requesting Employee Unit Head
[2] Recommendation [5] Approved by:
For Release (Items Available in the Warehouse) For Release (Items Available in the Warehouse)
For PM Preparation (Items not Available in the Warehouse) For PM Preparation (Items not Available in the Warehouse)

NORBERTO A. COLINARES ALLAN G. REDONDO


Central Warehouseman Administrative and General Services Manager
[3] Checked within Cost Estimate: Distribution:

[1] Administrative Unit


JOBERT BARCE [2] Requesting Unit
Cost Engineer

You might also like