Snag Ohdc Project
Snag Ohdc Project
Snag Ohdc Project
4) Manhole in fire pump room to be closed properly and suction header to be relocated as advised by
client at site
7) Lay one more 4 inches interconnection pipe between two holding tanks
14) All panels should undergo load balancing according to the load consumption
19) Flexible pipe connection to be required in above fire pump to manage the vibration
21) Disconnect isolator to be provided for fire pump control panel installed in pump room