BEAM SCHEDULE (C28:Fy276) (LEVEL: 1.5m)
BEAM SCHEDULE (C28:Fy276) (LEVEL: 1.5m)
BEAM SCHEDULE (C28:Fy276) (LEVEL: 1.5m)
5m)
5000 5000
SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT
BEAM SHEAR STIRRUPS SFR REMARKS
NO. B D STRAIGHT CURTAILED EXTRA EXTRA STRAIGHT EXTRA EXTRA
LEFT RIGHT LEFT SUPP RIGHT SUPP
B11
B14
B17
B4 300 400 4-#16 - - - 4-#16 - - 41-2L-#10@80,140,80 C/C - -
2-#16 2-#16 2-#16
B10
B13
B16
B9 300 400 4-#16 - - - 4-#16 - - 41-2L-#10@80,140,80 C/C - -
3-#16 3-#16
B12
B15
2-#16 2-#16
PRC No. REVISION DESCRIPTION PROJECT TITLE SHEET CONTENTS PROPONENT SHEET No.
PROPOSED 2-STOREY RESIDENTIAL BUILDING
TIN No. WITH GROUND LEVEL PARKING
TIE BEAM PLAN S-6
TIE BEAM SCHEDULE