Download as pdf
Download as pdf
You are on page 1of 1
Compliance Statement project Name: 6OOKW HSBCSOLAR PROJECT. (Contractor: M/s: Bhawan Enterprises LLC Consultant: M/s ON)P Consultants Ret Wo: HSBC-BE-002-ED, MAS-LTP/Rev-l (22-10-2019) [cient m/s. HSBC Oman Manufacturer M/s Talent Electric Services LLC subject Compliance justifications agains the comments received. Date: 31-10-2019, ‘SNe: ‘Consultant comments Please ari this ransmival approval for vendor drawing or MAS 1 approval (Document ransmitals LV Panel vendor drawing, inside shoct material approval sheet) Talent response 1 |ontractors Scope. [enclosure test certificate and breaker estcertifiate tobe submit. Iwoted& Comply. Test certificates enclosed herewith or review. 3 |Greuivbreaker deliver atch cerfiate tobe submit '3_ [Noted & Comply. Shall produce atthe tine of FAT, for review. Provide Manufacture License & 150 Certificate Noted & comply. Enclosed herewith for review. [Provide Component and panel warranty certifate Noted & comply. Pane Warranty Certificate (Including components) encosed herewith forrevew. 6 [Circuit contro wiring nt clear (ference number aot cored. 6 [Note Corrected in revised drawing 7__[eonsuteant name ls wrong (on). 7 [Noted Corrected in revised drawing (clarity the contractor name (Bhawan Enterprises LLC or Zabalr featemiosoarceereames 79] a fe 5 Se ee = SRS | foenremcn Saar epee reverent eee ee ener 18 |Noted. Meter shall be in Main Contractor Scope. stall be installed, checked

You might also like