Compliance Statement
project Name: 6OOKW HSBCSOLAR PROJECT.
(Contractor: M/s: Bhawan Enterprises LLC
Consultant: M/s ON)P Consultants
Ret Wo: HSBC-BE-002-ED, MAS-LTP/Rev-l (22-10-2019)
[cient m/s. HSBC Oman
Manufacturer M/s Talent Electric Services LLC
subject Compliance justifications agains the comments received.
Date: 31-10-2019,
‘SNe: ‘Consultant comments
Please ari this ransmival approval for vendor drawing or MAS
1 approval (Document ransmitals LV Panel vendor drawing, inside
shoct material approval sheet)
Talent response
1 |ontractors Scope.
[enclosure test certificate and breaker estcertifiate tobe submit.
Iwoted& Comply. Test certificates enclosed herewith or review.
3 |Greuivbreaker deliver atch cerfiate tobe submit
'3_ [Noted & Comply. Shall produce atthe tine of FAT, for review.
Provide Manufacture License & 150 Certificate
Noted & comply. Enclosed herewith for review.
[Provide Component and panel warranty certifate
Noted & comply. Pane Warranty Certificate (Including components)
encosed herewith forrevew.
6 [Circuit contro wiring nt clear (ference number aot cored.
6 [Note Corrected in revised drawing
7__[eonsuteant name ls wrong (on).
7 [Noted Corrected in revised drawing
(clarity the contractor name (Bhawan Enterprises LLC or Zabalr
featemiosoarceereames 79] a fe
5 Se ee
= SRS | foenremcn
Saar epee reverent eee ee ener 18 |Noted. Meter shall be in Main Contractor Scope.
stall be installed,
checked