 Air intake filter house, Compressor intake area inspection and cleaning
work.
 Air intake flap MOV lubrication and operational checks to be done.
 Inspection of IGV area, vanes angle checking and compressor blades
inspection.
 IGV operating system turn buckles greasing & actuator operational
checks to be done.
 ESV before NG strainer inspection and cleaning work.
 Both combustion chambers opening and inspection of Flame tube and
flue gas path area.
 Both combustion chambers burners inspection for blockages.
 Both combustion chambers tiles and tile holder’s inspection.
 Both combustion chambers cones inspection.
 Turbine blades inspection to assess blade condition (Visual and
Boroscope).
 Rotor lifts checking and adjustment ( if Required)
 Visual inspection of Exhaust gas Diffuser.
 Diverter damper seals inspection.
 All supporting auxiliaries’ inspection, lubrication, alignment checks to be
done.
 Seal oil, stator water system pumps alignment checks.
 Lube oil, Hydraulic oil, Lift oil, Seal oil, Stator water system filters
cleaning.
 All NG lines purging to be done by Nitrogen.
 All generator connections which are under hydrogen pressure need to
be tested with helium to ensure no leakage.