TIEM 13 Inspecting and Testing Electrical Distribution Circuits Questions and Answers
© ECITB Page 1 of 5
Question 1
The maintenance craft person may have to plan conduit and trunking runs to
install plant and equipment. State two facts that must be considered before
commencing work.
Answer
Question 2
What must you wear to stop electrostatic discharge whilst dismantling electronic
circuitry from a cabinet?
Answer
Question 3
Answer
1. Polarity
TIEM 13 Inspecting and Testing Electrical Distribution Circuits Questions and Answers
© ECITB Page 2 of 5
Question 4
Answer
Question 5
What action should be taken when a junction box cover is found to be broken on
site?
Answer
1. Secure the cover to stop the ingress of moisture and report it to your
supervisor/engineer
TIEM 13 Inspecting and Testing Electrical Distribution Circuits Questions and Answers
© ECITB Page 3 of 5
Question 6
Answer
1. Damaged insulation
2. Inadequate systems of work
3. Inadequate overcurrent protection
4. Inadequate earthing
5. Carelessness and complacency
6. Apparatus overheating
7. Earth leakage currents
8. Loose contacts and connections
9. Inadequate ratings of circuit parts
10. Connections unprotected
11. Poor maintenance and testing of equipment
Question 7
State the recommended maximum length of extension lead for general use with
each of the following core areas:-
a) 1.25mm²
b) 1.5mm²
c) 2.5mm²
Answer
a) 12m
b) 15m
c) 25m
TIEM 13 Inspecting and Testing Electrical Distribution Circuits Questions and Answers
© ECITB Page 4 of 5
Question 8
Answer
1. Procedures manual