Daily Drilling Fluids Report

EGYPTIAN MUD ENGINEERING & CHEMICALS COMPANY


Water Base

Operator General Petroleum Company"GPC" Rig Name ADM#3 Report No. 12


Operator (Rep's) Sameh Tash Country Egypt Date 4/18/2017
Well Name & Number S.E. AL HAMD - 2 Field / Location G.O.S / G.O.S Measure Depth / TVD, m 1057 / 865.63
Contractor ADS Water Depth / RKB, m 49.00 / 72.00 Progress 0
Contractor (Rep's) Kareem Spud Date 07.04.2017 Present Activity N/U BOPs

STRING DATA CASING DATA HOLE VOLUMES MUD PIT VOLUME


OD ID Type Length OD ID Set @ MD bbl min stks Pit
Fluid Type Volume, bbl
24.000 20.000 116.00 Surface Equipments 1.62 0 ID Status
13.375 12.415 1,057.00 Drill String Capacity 0.00 0 S.TRAP 1 Active S.S. KCL POLY. MUD 45.81
Drill String Displacement 0.00 0 S.TRAP 2 Active S.S. KCL POLY. MUD 45.81
Annular Section 0.00 0 S.TRAP 3 Active S.S. KCL POLY. MUD 45.81
Total Hole With String 519.24 0 S.TRAP 4 Active S.S. KCL POLY. MUD 45.81
Total Hole Without String 519.24 0 TANK#1 Active S.S. KCL POLY MUD 356.44
Active Pits Volume 539.70 0 TANK#2 Reserve OBM 0.00
Total Circulation Volume 1,060.56 0 TANK#3 Reserve SPUD MUD 0.00
Circulation Volume at Bit 541.32 0 TANK#4 Reserve S.S. KCL POLY. MUD 72.22
TANK#5 Reserve 70.00
SLUG Reserve S.S. KCL POLY. MUD H 30.00

MUD SPECS BIT DATA SOLIDS CONTROL EQUIPMENT CIRCULATION & PUMPS DATA
Fluid Type Hole Size in Device Make Size Hrs Pump Make NATIONAL DUPLEX NATIONAL DUPLEX
Parameters min max Bit Size in SH.SH#1 SWACO 2*100 1 Pump Model NT. P-160 NT. P-160
Bit No. SH.SH#2 SWACO 1*120( 1 Liner, in 6.50 6.50
Bit Type SH.SH#3 SWACO 2*100 1 Stroke Length, in 12.00 12.00
TFA in2 MUD CLEANER SWACO 2*140 0 Efficiency, % 97.00 97.00
Depth in m DESANDER SWACO 2 CO 0 Pump Rate, stk/min 0 0
W.O.B lbf 0 DESILTER SWACO 16 CO 0 Pump Output, bbl 0.119 0.119
R.P.M 0 CENTRIFUGE Derrick centrif 0 Pump Flow Rate, bbl/min 0.0 0.0
R.O.P m/h 0.0 Flow Rate, gal/min 0.0
Pump Pressure, psi 0.0

MUD PROPERTIES MUD VOLUME ACCOUNTING MUD PRODUCTS CONSUMPTION


Sample Source Flow Line Additions, bbl Daily Cumm. Products Unit Size Used
Time 10:37:11 Initial Volume 1532.77 1017.4
Flow Line Temp., F 125 Mud Mixed 0 2155.35
Depth MD / TVD, m 1,057.00/865.63 Water (dilution) 0 405
Mud Weight, lb/gal 9.80 Diesel Added 0 0
Mud Gradient, psi/ft 0.51 Chemicals 0 96.64
Funnel Viscosity, sec/Qrt 68 Mud Recieved 0 0
600 / 300 / 200 RPM 86/62/52 Gain 0 0
100 / 6 / 3 RPM 36/13/12 Total Addition 0 2656.99
Rheology Temp., F 120
PV / YP / LSYP, cP/lb/100ft2 24/38/11
Gel Str. 10s/10m/30m, lb/100ft2 13 / 19 /
API Fluid Loss, ml/30min 5.6
HTHP, ml/30min/HTHP Temp., F /
Cake API / HTHP, 1/32nd in 0.50/ Losses, bbl Daily Cumm.
Sand Content, Vol % 0.40 Shakers 0 240
Report Oil, Vol % 0.00 S.C.Eq. 0 110
Retort Water, Vol % 88.00 Formation 0 485
Retort Solids, Vol % 12.00 Dumped 300 1464.62
Ph / Ph Temp., F 9.5/120 Trip 0 0
CEC Mud(MBT), ppb 5 Left in Hole 0 0
Alkalinity Mud (Pm), 0.5 Mud Returned 0 0 DAILY ADDITIONAL COST
Alkalinity Filtrate (Pf) / (Mf), 0.15/0.3 Oil in Cuttings 0 0
Chlorides, mg/l 53000 Other 0 0
Total Hardness, mg/l 640 Total Losses 300 2299.62
Glycol, gal/bbl Final Volume 1232.77 1374.77
Glycol Cloud Point, F
ADDITIONAL PARAMETERS

Current Dilution Factor 0.57


SOLIDS ANALYSIS BIT HYDRAULICS MUD COST ANALYSIS
Dissolved Solids, Vol % 2.42 Rheology Model Power Law 17.50 Original Water Base Spud Mud 2,410.00
NaCl, % wt / ppb 8.3 / 30.58 AV / DP, ft/min 17.50 Original Water Base S.S KCL POLY. MUD 59,882.50
KCl, % wt / ppb / AV / DC, ft/min
Avg.Sp.Gr. Solids, 2.28 AV / Riser, ft/min
Corrected Solids, Vol % 9.58 Bit HHSI, hp/in2
LGS, Vol % 2.6 Bit Press. Loss, psi
Betonite, Vol % 0.3 Nozzels Vel., ft/sec
Betonite, ppb 2.73 ECD @ Bit, lb/gal 9.8
Drilled Solids, Vol % 2.3 ECD @ Casing Shoe, lb/gal
Drilled Solids, ppb 21.72 Leak-Off Test
HGS (EMEC CARB (EF)), Vol % 6.99 n 0.47
HGS (EMEC CARB (EF)), ppb 66.38 k (lbf.sec^-n/100ft^2) 3.483
Aw 0.9492

Total Cost 62,292.50


RIG OPERATIONS TIME DISTRIBUTION MUD TREATMENT
CONTINUED PERFORMED CMT JOB AS PER PROGRAM. WOC ,N/D DIVERTER SYSTEM AND Cementing 01:00 TREATED 730 BBL OBM (O/W 70/30 ,VIS 152 SEC ,MWT 9PPG ,E.S 440 V ,EX. LIME 1.3) TO 1050
N/UP BOP. WOC 10:00 BBLS OBM O/W 79/21 ,VIS 80 SEC ,E.S 480V ,MWT 9 PPG ,EX LIME 3) AFTER ADDED DIESEL
N/U BOPs 05:00 AND E. MUL ,E. CON ,E.WET ,CALCIUME CHLORIDE 94% , LIME AND PERM BRIDG-XF ( PITS
#1,2 & 5 )

Total 16:00:00
LITHOLOGY DATA
Age
Formation Drilled South Gharib
Lithology Anhydrite
DEVIATION DATA
Inclination / Azimuth, de
MD / TVD, m
Horisontal Displ., m
A.fatah Elnokrashi District Egypt District Representative Alaa El Meligue Daily Cost, $ Cummulative Cost, $
EMEC ENGINEER
Badry Elasayed Ahmad Warehouse ALEX. Free Zone Field Representative HAKIM 0 62292.5

General Petroleum Company"GPC", Egypt Page 1 of 1 April, 2017