Professional Documents
Culture Documents
Tools Inspection Checklist
Tools Inspection Checklist
MANAGEMENT SYSTEM
Passed(P) /
Group SN Checks N/A Remarks
Failed(F)
Lifting tools should be free of broken wire strands / kinks /
1
core damaged / cracks / spreading / wear and deformation
*Lifting tools / accessories has to be certified by third party
Group 1
2
and valid.
3 Safety latch should be in good condition for all hooks.
4 Cable drum stand have third party load test certificate
5 Load Capacity is marked on cable drum stand
Group 2
INSPECTION RESULTS
[ ] Accepted [ ] Rejected
Reason for Rejection:
1.
2.
3.
Date
Inspected by: 1.
2.
3.
NOTE:
Any other tools not specified in this form; End user & contractor subject matter
experts need to agree on a checklist requirement and attach it to this form.