ACTIVITY
A. Mobilization/Demobilization
B.3. Supply and Installation of 10mm thk Single-faced Roof Insulation Target
B.4. Supply and Installation of Prepainted Galvalume Rib-type Longspan 0.6mm thk Target
B.5. Supply and Installation of Prepainted GI Side Flashing 0.6mm thk Target
D. Safety Items (Safety harness, scaffolds, flatforms and other safety items) Target
E. Disposal Target
Prepared By:
J.J. LACEBAL CONSTRUCTION AND DEV'T CORPORATION
21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7
V I T I E S
J U N E
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
J
26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13
J U L Y
14 15 16 17 18 19 20 21 22 23
A
24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
A U G U S T
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
S E P T E
29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14
T E M B E R
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Project : ROOF REPLACEMENT PHASE 1 (AM AREA & LOBBY AREA)
Location : HTMPC, SUBIC TECHNO PARK, SBFZ
Contractor : J. J. LACEBAL CONSTRUCTION
ACTIVITY
A. Mobilization/Demobilization
B.3. Supply and Installation of 10mm thk Single-faced Roof Insulation Target
Actual
Accomplishment %
B.4. Supply and Installation of Prepainted Galvalume Rib-type Longspan 0.6mm thk Target
Actual
Accomplishment %
B.5. Supply and Installation of Prepainted GI Side Flashing 0.6mm thk Target
Actual
Accomplishment %
C.2. Supply and Installation of Prepainted Galvalume Rib-type Longspan 0.6mm thk Target
Actual
Accomplishment %
D. Safety Items (Safety harness, scaffolds, flatforms and other safety items) Target
Actual
Accomplishment %
E. Disposal Target
Actual
Accomplishment %
Prepared By:
J.J. LACEBAL CONSTRUCTION AND DEV'T CORPORATION
25% 50%
S C H E D U L E O F A C T I V I T I E
21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7
75% 100%
2.50% 5.00% 8.75% 12.50% 15.00% 21.25% 27.50% 33.75% 40.00% 46.25%
1.25% 3.50% 7.75% 11.75% 14.50% 21.25% 27.25% 33.25% 39.25% 45.25%
1.12% 2.25% 4.50% 9.00% 12.37% 14.62% 20.23% 25.84% 31.45% 35.95% 41.56%
25% 28% 31% 35% 39% 42% 49% 56% 63% 70% 77%
J U L Y
14 15 16 17 18 19 20 21 22 23
48.75% 51.25%
47.50% 53.50%
43.80% 46.00%
79% 81%
A
24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
57.50% 62.50%
59.50% 64.30%
51.61% 56.09%
83% 85% 87% 88% 89% 90% 91% 92% 95% 100%
12.50%
A U G U S T
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
50.00% 100.00%
15.00% 35.00% 80.00% 100.00%
78.31%
T E M B E R
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
95.00% 100.00%