Project : ROOF REPLACEMENT PHASE 1 (AM AREA & LOBBY AREA)

Location : HTMPC, SUBIC TECHNO PARK, SBFZ


Contractor : J. J. LACEBAL CONSTRUCTION

ACTIVITY

A. Mobilization/Demobilization

A.1 Procurement of Materials Target

A.2 Processing of Permits Target

B.1. Dismantling works of Existing Roof Sheets Target

B.3. Supply and Installation of 10mm thk Single-faced Roof Insulation Target

B.4. Supply and Installation of Prepainted Galvalume Rib-type Longspan 0.6mm thk Target

B.5. Supply and Installation of Prepainted GI Side Flashing 0.6mm thk Target

B.7. Leak Testing Target

C. Roof Gutter Replacement at Lobby Canopy Area

C.1. Dismantling works of Existing Roof Sheets Target


C.2. Supply and Installation of Prepainted Galvalume Rib-type Longspan 0.6mm thk Target

C.3. Removal of Existing Damaged Roof Gutter Target

C.4. Installation of New Stainless Gutter, Ga. 26 Target

C.5. Removal of Existing Ridge Roll Target

C.6. Installation of Prepainted Ridge Roll 0.6mm thk Target

C.7. Removal of Existing Damaged Spandrel Panel Target

C.8. Installation of New Spandrel Panel Target

C.9. Painting Works Target

C.10. Temporary enclosure and protective covering Target

D. Safety Items (Safety harness, scaffolds, flatforms and other safety items) Target

E. Disposal Target

Prepared By:
J.J. LACEBAL CONSTRUCTION AND DEV'T CORPORATION

ENGR. JAYVEE PINEDA


M A Y
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
S C H E D U L E O F A C T I V I T I E

21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7
V I T I E S
J U N E
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
J
26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13
J U L Y
14 15 16 17 18 19 20 21 22 23
A
24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
A U G U S T
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
S E P T E
29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14
T E M B E R
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Project : ROOF REPLACEMENT PHASE 1 (AM AREA & LOBBY AREA)
Location : HTMPC, SUBIC TECHNO PARK, SBFZ
Contractor : J. J. LACEBAL CONSTRUCTION

ACTIVITY

A. Mobilization/Demobilization

A.1 Procurement of Materials Target


Actual
Accomplishment %

A.2 Processing of Permits Target


Actual
Accomplishment %

B.1. Dismantling works of Existing Roof Sheets Target


Actual
Accomplishment %

B.3. Supply and Installation of 10mm thk Single-faced Roof Insulation Target
Actual
Accomplishment %

B.4. Supply and Installation of Prepainted Galvalume Rib-type Longspan 0.6mm thk Target
Actual
Accomplishment %

B.5. Supply and Installation of Prepainted GI Side Flashing 0.6mm thk Target
Actual
Accomplishment %

B.7. Leak Testing Target


Actual
Accomplishment %

C. Roof Gutter Replacement at Lobby Canopy Area

C.1. Dismantling works of Existing Roof Sheets Target


Actual
Accomplishment %

C.2. Supply and Installation of Prepainted Galvalume Rib-type Longspan 0.6mm thk Target
Actual
Accomplishment %

C.3. Removal of Existing Damaged Roof Gutter Target


Actual
Accomplishment %

C.4. Installation of New Stainless Gutter, Ga. 26 Target


Actual
Accomplishment %

C.5. Removal of Existing Ridge Roll Target


Actual
Accomplishment %

C.6. Installation of Prepainted Ridge Roll 0.6mm thk Target


Actual
Accomplishment %
C.7. Removal of Existing Damaged Spandrel Panel Target
Actual
Accomplishment %

C.8. Installation of New Spandrel Panel Target


Actual
Accomplishment %

C.9. Painting Works Target


Actual
Accomplishment %

C.10. Temporary enclosure and protective covering Target


Actual
Accomplishment %

D. Safety Items (Safety harness, scaffolds, flatforms and other safety items) Target
Actual
Accomplishment %

E. Disposal Target
Actual
Accomplishment %

Prepared By:
J.J. LACEBAL CONSTRUCTION AND DEV'T CORPORATION

ENGR. JAYVEE PINEDA


M A Y
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

25% 50%
S C H E D U L E O F A C T I V I T I E

21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7

75% 100%

17% 34% 51% 68% 90% 100%


V I T I E S
J U N E
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
J
26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13

2.50% 5.00% 8.75% 12.50% 15.00% 21.25% 27.50% 33.75% 40.00% 46.25%

1.25% 3.50% 7.75% 11.75% 14.50% 21.25% 27.25% 33.25% 39.25% 45.25%
1.12% 2.25% 4.50% 9.00% 12.37% 14.62% 20.23% 25.84% 31.45% 35.95% 41.56%

25% 28% 31% 35% 39% 42% 49% 56% 63% 70% 77%
J U L Y
14 15 16 17 18 19 20 21 22 23

48.75% 51.25%

47.50% 53.50%
43.80% 46.00%

79% 81%
A
24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10

57.50% 62.50%

59.50% 64.30%
51.61% 56.09%

83% 85% 87% 88% 89% 90% 91% 92% 95% 100%
12.50%
A U G U S T
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

67.50% 72.50% 75.50% 80.50% 85.50%

69.10% 73.90% 76.78% 81.58% 86.38%


61.70% 67.30% 70.66% 76.26% 81.86%

87.00% 89.00% 91.00% 93.00%


49.95%
S E P T E
29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14

91.50% 96.50% 100.00%

92.14% 96.94% 100.00%


88.58% 94.18% 100.00%

15.00% 35.00% 80.00% 95.00% 100.00%

15.00% 35.00% 80.00% 95.00% 100.00%

15.00% 35.00% 80.00% 95.00% 100.00%

15.00% 35.00% 80.00% 95.00% 100.00%

15.00% 35.00% 80.00% 95.00% 100.00%

50.00% 100.00%
15.00% 35.00% 80.00% 100.00%

78.31%
T E M B E R
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
95.00% 100.00%