DESIGN OF COMBINED
FOOTING
12-Apr-15 1
plan
12-Apr-15 2
1
4/12/2015
Using:
الشكل مستطيل أو شبه منحرف
عمود
جار
قاعدة إقتصادية
فكرة الحل:
نجعل مركز المحصلة فى منتصف قاعدة غير إقتصادية
القاعدة المجمعة حتى تكون اإلجھادات
أسفل القاعدة منتظمة
12-Apr-15 4
2
4/12/2015
a) RECTANGULAR FOOTING:
Property
Line
P1 < P2
12-Apr-15 5
Data: S
12-Apr-15 6
3
4/12/2015
Design Procedures:
1) RC footing dim.
R = P1 + P2
take moment about P1 P2 * S
P2 * S = R * Y Y
R
L/2 = Y + (a1/2) + C1 ….. get L
12-Apr-15 7
Q4 = - w * C2
Q3 = -w * (C2+a2) + P2
point of zero shear at distance
x P1 / w
C12
M1 w *
2
((C a 1 ) 2 a
M2 w * 1 P1 * 1
2 2
C 22 (C a 2 ) 2 a
M4 w * M3 w * 2 P2 * 2
2 2 2
2
X a
get Mmax at zero shear M max w * P1 * ( X C1 1 )
2 2
12-Apr-15 8
4
4/12/2015
12-Apr-15 9
3) Depth
Q sh * 1 . 5
d sh ----- get dI
B * q cu
Qsh at distance d from col. face -----
Qsh = Qmax – w * d
Mu = 1.5 * Mmax
Mu
d m C1 ----- get dII
fcu * B
12-Apr-15 10
5
4/12/2015
12-Apr-15 11
4) Reinforcement
M utop
A S top
j d fy
M
A S bottom ubottom take √ Φ √ mm / B
j d fy
As min 0.0015* B * t
Check Dev. Length
f cu
f bu 0.30
c
φ α β η (f y / γ s ) X
Ld
4 f bu
12-Apr-15 12
6
4/12/2015
5) Transverse Direction
For Col. 1
width = a1 + 2d or
B1’ = a1 + d + C1
C3
wu1 = Pu1 / B M u1 w u1 * C 3 * * 0 . 85
2
M u1
A S1
j d fy
…….. take
k √ Φ √ mm / B1’
As min 0.0015* B1' * t
Ld ≤ C3
12-Apr-15 13
For Col. 2
width = a2 + 2d or
B2’ = a2 + d + C2
wu2 = Pu2 / B C4
M u2 w u2 * C 4 * * 0 . 85
2
M u2
A S2
j d fy ……. take √ Φ √ mm / B2’
Ld ≤ C4
12-Apr-15 14
7
4/12/2015
RFT Details
5Φ12 mm /m
5Φ12 mm /m
As1
As2
A
A
12-Apr-15 15
8
Foundation Engineering ( 5701332-3)
Design Procedures:
1) RC footing dim.
R = 1000 + 1500 = 2500
1500 * 5 = 2500 * Y Y=3m
L/2 = 3 + (0.4/2) + 0.5 = 3.7 m …. L = 7.4 m
A RC 2500/200 12.5m 2
12.5 = 7.4 * B ---- Take B=1.7 m
2500
fn 199 kN/m 2
≤ qna= 200 kN/m2
7.4 * 1.7
w = 199 * 1.7 = 338 kN/m’
2) Draw S.F.D & B.M.D for long dir.
C2 = 7.4 – (0.5+0.2+5+0.3) = 1.4 m
Q1 = 338 * 0.5 = 169 kN
Q2 = 338 * (0.5+0.4) – 1000 = -696 kN
Q4 = -338 * 1.4 = -473 kN
Q3 = -338 * (1.4+0.6) + 1500 = 824 kN
point of zero shear at distance x 1000 / 338 2.96 m
(0.5) 2
M1 338 * 42 m.kN
2
( 0 .9 ) 2
M 2 338 * 1000 * 0.2 63 m.kN
2
(1.4) 2
M 4 338 * 331 m.kN
2
(1.4 0.6) 2
M 3 338 * 1500 * 0.3 226 m.kN
2
(2.96) 2
M max 338 * 1000 * (2.96 0.5 0.2) 780 m.kN
2
3) Depth
Qsh = 824 – 338 * d
1.5(824 - 338 * d)
d ----- d = 0.77 m Take d= 0.8m
1.7 * 0.65 *1000
1000-199*(0.4 0.8) * (0.6 0.8)
fp 160 kN/m2 = 0.16 N/mm2 < qcup (ok)
2(0.4 0.6 2*0.8) *0.8
1500-199*(0.6 0.8) *(0.6 0.8)
fp 248 kN/m2 = 0.25 N/mm2 < qcup (ok)
2(0.6 0.6 2*0.8) *0.8
780 * 10 6
dm 4 = 542 mm = 0.55 m
25 * 1700
Take d = 0.80 m & t = 0.85 m
4) Reinforcement
780 * 10 6
A s top = 3356 mm2 take 12 Φ 19mm/1.7 m
0.807 * 360 * 8 00
331 * 10 6
A s bottom = 1424 mm2
0.807 * 360 * 8 00 take 11 Φ 16mm/1.7 m
2
Asmin = 0.0015 * 1700 * 850 = 2167 mm
φ α β η (f y / γ s ) 19 *1* 0.75 *1 (360 / 1.15 )
Ld 914mm
4 f bu 4 *1.22
< x 2960 mm
5) Transverse Direction
For Col. 1 For Col. 2
By Dr . Hussein Mahmoud
Property
Line
1
24/06/1436
Data:
Column load (left side) P1 (kN)
Column load (right side) P2 (kN)
Spacing bet. Columns (C.L to C.L) S (m)
RC allowable stress fcu, fy (N/mm2)
Design Procedures:
1) RC footings dim.
Y = 0 R2 = P1 + P2 - R1
2
24/06/1436
R1
A1 B1 = A1 / L1 …... get B1
q na
R2
A2 B2 L 2 A 2 .….. get L2 , B2
q na
w1 = R1 / L1 (kN/m’) w2 = R2 / L2 (kN/m’)
P1 P2
Statical
System
3
24/06/1436
3) Design of Strap beam
Mu
dC Choose bstrap = bcol + 10cm
fcu * bstrap
where Mu = 1.5 1 5 Mmax
get dstrap & t = d + 5cm
Mu
A s top
j * fy * d
take √ Φ √ mm
Md or Me *1.5
As bottom
j * fy *d
Check shear
1.5Qsh
fsh qcu where Qsh = max. of Q
bstrap * d
In case fsh > qcu … use stirrups & bent bars
7
Strap RFT Details
4
24/06/1436
4) Design of Footings
For Col. 1
C1 = (B1 – bstrap) / 2
For Col. 2
C2 = (L2– a2)/2 or = (B1–bstrap)/2