III Year

You might also like

Download as pdf
Download as pdf
You are on page 1of 26
BUILDING CONSTRUCTION IV ‘AR 604 lecture : 2 Year : Practical : 2 Par: 1 course objec: Imprt iowedpe tothe tents about porta ames, shal eos and domes replace and chimneys: wastena Umber canst; sound and tema ‘auton; presenton of ire eflecte in bling measure o poten baling ‘ermgonents and fies, varous buldap server elements and bout cours Beta: 1. Portal Frames, Shel Roos and Domes: Introduction to portal ames an ther advantages pes of portal Fames Ineduction te shell and vaut rooting stems, tr cnsacion and uses. traduction to domes ad tcnatictn, Taher) Fireplaces and Chineys Irvoducion te teplaees and chimneys, terminalis, their design parameters constuction deta and prtances Teh) “Tradtanal Timber Constivton Inraduction tothe atonal ber casrution of Nepal, easing varus elements sah 36 pst, dao, windows and rol, and the ‘ype Prevention and rcecton rom decay. Tehows) Sounds Theat insation requirements and techni adres the same ith varourcansrcon methodsand mater ally. eho) Irrodution to fre preventian and protection eniqes wih respect to tera, design and onstruction Fe load, fre euape and evocation reqarement. tehure) 6 Preventive and Remedy Measuresin Budings Freventon metares and remedy of bling elements 2 appleaons from roting, earocon sfbowcenc, and rung Sua Ang prevention dve to formation of effrecenee, lechirg and rane (hows) BuiingSence lements vdaton to various server eles in Bulag andthe tech rameter. The wes and nto lens Ets and ltrs te: teeer supply and tame fcc! upaly and sbi, heath ‘ertston andar condone, (chou) vdaten to sitanate cnerucion and planing techies through [Beenhars concept cor fee const, eco end concepts and Setting concn 80g a and amar navesing. (4 NOS) Practical Assignments Sno | nts | Hours | sheets | oiebution ttatets 3 apa pa s a oe a ets pata a The ensracton of ulinge: 8 Bary, Volumes 1S Constrcton Technology chide, Volumes -4 Balding Consracion Osta Paces Orawne Han Bane Buldng Constr, Sans Kom BuldngConsrucion and Matera, archaran Singh SuldingConsvucin, Ranga BuldngConsracion Pc Vrenese valaton Scheme: ‘The questions wil covert copter slabs. The evaluation seheme wl tes ineated nthe table bow enews | ms [at as set “tet st ‘Thee nay be mia deviation ink tion BUILDING SERVICES| e607 Lecture : 2 Year: Practical : 2 Par: course Objective: Te prove fundamental knowledge of water suply and santary sence Fling vote wate colleen) wth parieuar reference to Sulding and ‘ance design ecg and eran Water suppy System (thou EE Invoduction 12. Objective OF Water upp 13. Water Sippy And Pubic Heath 12 troduction to Water Sure (hous) 2.3, Water Ol, Type OF Sources, Seroe Water Sources Ries Fond, tase 22, Ground Water Sources (Wel, Tube Wal Artesian, Sorin, Stone Stowe) 23, Ram Wate Harvesting, FogCollecton& conservation pod 2. Water Supply System (Distibution System And House Water Plumbing) (shou) ofeeniee ee 3.3, Apurerances water meters ete vahes, be sale, tll aie rohan safer ive aeese aie, daha, rey, ‘eck ron cot, Bonds to, bow lon, os, eda age, Shower, storage rank overflow, washout) 5.4, Headiosson pe ad ings leakage heck of essen 3.5. Het ad cold water suply in bul, cena esting ste, {instantaneous} henge yer, 0 ee) 5.6, Montenaneof bud plumbing | Estimation Method OF Water Quanty (hou) 4.4 Popa forecasting water requirement fr varios urs 42. Winer demand, varaton on demand, prot demand, fore sifecingon dean, ssa reonome factor on derand 4.3, Water sup fr pate ad pulplaes 44, ster tore, casieton, see determination of tank cesar assessment Of Water Qusity (shows) SL Impure, types and the lle, domestic puraton proces, water quality standard WHO) whlesare water patastewatet, 2, Water exten nteducion aly ned of entrant creeing sedsvertatn ieaten dle, seation sling, isealaneus proces) sanitary system (hous) 62 eduction 52. Obpetve ot santaton 13. Sanitation entonment and publcheata Intoductan to Sewage Collection and Teatment (hous) 75. Seuage depo rom tlsed a3 or OUR UENE 712. sepietank, soak pt, desipn and eonston 273. ealecvon ad polo dry refiners and saee 23 stn, WP rn, Pk 175 teoSantaton conn! of euse of wastewater, constructed wend ow. 16, anwate diosa rom eta court yard oot ranage, an wate pp lotion open andse dan and dpe (aleaation of inate rane roreracl and out), surface water drag, oud ‘ainage damage ye pes, Appliances Figs and Appurtenance (hous) BE Son spalancey wate water aplancr, 1295, soe work pe rater ope cut manhole ratings, wath tn, ktehensink, Bs ‘8b, fing extern water cst rina, commode, tap, bends ‘ert ple, nets, catch is, clean cu, manholes, op manos, Fusing dee, grease and ol aps Introduction To Rural Sanitation (hours) 81. Povslonef safe and potable water sources 82, Calcton and daposl of ry fae, ight ol an supe 93 fonation Introduction to So Waste Managerant (2hous) D1 soud wastecalectn, dpe system, refase clecton chute, 203. SWS Pines valuation Scheme: Practical (Oring) (20hous) “The qos wil coer al chaps in lab. The vation sco wl 1 Ste Plan:showingmanhole se tank sak, mater reservoir tes in the table Blow 2 Det lan lay out dare of water spay tem and aout of — sewerage syste chapters | Hours =a 2. Roar Pan: ken aa showing append ppurtences feet pe 4 House plumbing yout sytem POs: 4 5 Meetancous Dea sec tank, sak it, water reserva, overhead aes [7 = system, ferent appliances, ting and sppurtenaee, ran water 3a [6 a Calecions rom aferent types ulin, sl eating Teta | 30 a 1 Schematic dasa after ste vs: pan! complete or undeceing Rome tei dort mi doit onsracton project an wate clecion syste stale bald, 7 Sold waste Coleen Canaine Lay Ox Map, Chte From High se ulane Practical Assignments “Sto [ Unis | hocaf shew Marks Drbaon erences Lie, GS. snd Gee, 15, Water Suply And santury Engineering. ‘Dhonpatail Sos Faber, NeSeak Deh 210006, no 2. Panchen, AC, Water Suopy And Saar Intalio, New Age Internation Plies United, Ad i 2 Bary The cnn Of Bulg (oe 5} Bang Sees BUILDING SERVICES It e604 lecture : 2 Year : Practical : 2 Par: 1 course Objective: ‘On comolton af his couse the tudents wil be eto: understand he base ‘ance of lecel system and desig he luminaton, power cul sfey {nd prtecton ape Zandadrequrement 1. Baie Concept of eee System ane ts Terminology (shou) Reaance (Onm'sLawand Kehoe we (Open and short Cres Single and Thee Pras a. Crews erie ower ana Eneay General Desert of etre! Dtribution Sytem, Pals | MO, SOB ete 2 Ati ging System (hours) 2 Inrodcton 2.2, Terms Used Liting Sate 23. USurottlamnaton 24. Typesof amos and Uating Furs 25. Types lipngsciemes 26. Lenting System Consideration for ferent Occupsnces 27. Design oftihting seems. 25, MethadsofUptingclelsin 228. Facony Lighting Stet Ughting& lod Lighting Satery 2nd Protection inlet System (hous) Bi iwedction 3.2 Operation and Conswucon of Fes, MCB 2 CCB 2.3 ating for Ect Eqiprent a Apes 3.5 lnveductiono Lightening Astor 4 Bectral station (6 ours) 25 Inodatin 42. Types of Wing Syste 163, General Rules for Wing System and Code of Practice 14, Determination of Lghtsubercat, power sue & Total Load 146. lec nsalton fr lc Menting System, A-contring Systems escaltors nd pumps et. Pract {teers Marks 25) 1 roducton to wring secesore such as antes, oer, drbton| board et, protectin dence uch ef, MCB, MECB te thir ensue, function ad agplzaton 2 reparingelecrcaltay-cut and deta fer carmel Complecor Doariment Bulg 3. Conducting Market Stuy and Collin, nlermativebrchures and Speciieatenonvarcus predict vale about leer ano, aplances nd equipment 4 hopeton of sbove sues in preparing sgn nd detain the esgn nen crent tee oerenes: 1 hd Jain” ABCof eee rgrerng”OhanpatlPbishing Company New Deh 2.18. Gupte “ec! italsion Estimating and Cantng" SK Kari 2. Gl. Wadhwa "Generate, Oerbtion n Ustion of ee nergy, New Ae neratonal(P Uinted, nds 44 Bhaaneen AO, Nema Kura, ashes PMents and ays "Malang, Rowe: ster Fotetion nd Sitges” Tata McGaw ducati Lites, New Deh valaton Scheme: The aestioe wl cover a the chapesin sibs, The eatin scheme wil ‘Siumcd ih eae crete ue 7 pee ot Tepes ‘tae [0 "Thee ay be ior deviation ina tration DESIGN STUDIO V Practical 22 Year : Par: 1 course Objective: "+ To deve at aretecaral program fr the projet ny cee suds a tate aferne, “+ To ersith reston between funcoalreqrements wth the fem Fanaion svotralequremens of butdg + Understand nfunce ote, ciate ad secmalgy on bldg ds, Taare [omeesed roe | Content Mae urs Ditabon Tra Hows Mais way TaiesTo" | Maser Pan Pats fale, Consrction Details. Commercial complex) | Ferspecbve Drawing fre sung Housing | Mode formatter: garments Gras | Tone Frobien~ Denar | Conan! ofanyof stove fcities | Drowingsin o (Projet it proud) | Free Hand Setches uation Schedule for Project work Wee | Stage Tian | Remaeie ‘| iterre& Gama | a0 ast 5 | Fale c ie Toa Fa 2 Neuter Areca] Oesien Data lecture: 4 ‘CONTEMPORARY ARCHITECTURE ‘AR 602 Year: Par: course Objective: An nredctry survey ofthe hstery er Architecture ad Urtaism in the ‘nen of rapidy changing Tehnoepes and Socal reurstanees of he 0ye3 To have 2 Knowedge of the Htoy of Modern Archtecure and understanding the form. paosoae, Sci, eel and ecoreme tacaraund ofthe Ingartant eters recon in glbal content ‘To compare the dite stage of Development of Aehtectre on Related Plsoing by Indi! reves of 390 0" Contry. To understand Buldngs [Structure as exoresion of formal Wecloga a terms new materia andtedvoeey Ta show terest nthe Cte and eoloecs! meaning of Bubdnes/ Srctres courte Beta vodatery Leaking of carterpeary Mentecre aNe the ints andisinfoecrspeling cecal seoftie word (hour Romanism in Arcutecure and xpresionsminAentecre_[¢hous) Sive- wale Groupes Mies VandeRohe and Hanes Meyer (Shows) Development American Achecure CHCAGD of Netecte —_|¢ hours) Cassa Rational in France -ART-NOVEAL ae Dewloprent ft rat Movement infnglae (eho) Futur of Germany/ aly nd DE STUL and Amsterdam SCHOOL [hours assanConstactisen Rhea) Modernpos oder Areitecre leh) 9 fechitectre in the elecvonic media, emersng cones Ftc Dectctre “hows} Sirinbe srewectre Dynamic aeitecre present revution a scence & tecnolegy, emerging eanceat of hhanan hobtat if posible charge and ature pessbly a 20. dea, theories of Achitecire andthe Ctl Aap! of Concept aed Procicerof ares reetsof madernperodane tier works (8 sr) Water crop Frankia wight” Mes Vander oe le Comer Pro ohreon leuie than oar dato KeoTaree Tadeo Ano Grates cores Foner vetary James String ‘el Graves Poon stad Nema Foster chard Rogers Renzo Pano 11 Ciel Appl of Concets and acc of Contemsorar Sree of Nepal ander wore (hows) Recommended Methods foriteral Evaluation: 1. Statens shoud repre iste note Soaks ont least thew ofthe ‘Slovo with anaipseal ates 2 Students Should prepare = trough arcs iusrated report on a east twostrucr of doce, (ema references ‘Aristo of editectre: Sanit eter /Avstry of ehitetre Seng and Rik: Koto Fneyened of Worl ventctre; Sern Hest tory of Wehteaure’ Couch Dora OnlrdDesenary of Arete ames Steven Cut “Theblinay of iretecur fhe 208 Cerny Yonemarereseatzcha, alegre Germany + Inemet Sud elution Scheme: ‘The questions wil cover a he chapters slabs. Te evaluationseheme wi ars copter | Hour | pA m [Rl ase | | a6 7a9 [216 0 [6 | a6 ‘COMPUTER-AIDED DESIGN &DRAFTING ‘AR 603 Practical : 4 Year Par: course Objective: Te understand the fundamental concept of Computer Aled Oesian/Drafing To enaie to prepare Two Dmensonal and Thee Dimensional arctecurl raving and medeig them vough Computer-Aided Desi/Deatng 1 ntoduton to CADD (2hous) Overview, Required equipment, Options equipment, The Autocho sraing Cesting te faving pls and coordinate system, WC, US, Coordinate Stem leon, drawing unite and sang owing ents nd 2 UeityConmandsane Servis (ahours) Help, save Svea Se Savetine, Status Menus | Entty Draw Commands and Drawing Aids (hours) B1Orawng simple and Contino ies Lin, Plyines,Recele, Poleons constuction Lines Roy 4.2. Cares and poi Objet “Cds, Aes, ese and eptal ars Dans, ois 33, Dawing As metric, Shan, Grd, Ortho, Objet Snap, Polar “Tracing, Objet ap Tracking, Dyna Input plane, US 44 tate nqiy Commands (shou) 4.2 apingand Rovngove, Cop, Rerae, Sale Mier, Seth ray 42. Changer ate and CaneractensCnpop, Break Tron Extend Filet hamer,Ofet Legte, tech, Sa, tenaten 4.3, Poblines eatngPeds Expl 5. Work with Tet (hours) resting moi Tex, Sting Tet Pepe Crest Mune Tes, hing Tests Spel Tet MopertessARRTEXT, TEXT OTE a Display Controls (2hous) Zoom Pon Monging mie wewpons, Redo, Regen, Rages ney ropes (hous) Byers Clers, Unerpe,Lnewepr scale socks, tributes apd Exteral References (hous) Cetin and nsring lock Sock and el ating Dimersioning and Hatching (shows) 92 Asccatvedmensoning Dimension types ord te comsonen, 1922, Haan at pater ing Hate pate, Dean he Bounty, ating tye Hate cater algrent Workngin Mode space and Paper Space (hous) Pong / Pring (hous) Changing Per andLnetype arametrs,Chinging ask it specestions Seung Pot speclcations Readhngthe plot, Mien rier Peng {pes of 30 Modes and Thee-Dimensiona Coordinate System (thous) ALL Tivee Dimensional modes Wierame Model Suace Model, na Soleo! 322. Using phe and ule 4323 Thvee Dimensional Coornate Sytem Rectangular, nk Sener 1324, Wrtng wth Users Coordinate ates 125. Worn wth ewpors Thee dimensional Sods (ous) {11 Thee Dimensional Sold Moding Bo, Cone Cinder Sphere, wedse 1112 Costing Deu Tree Dimensional slid Creating fred Soli, resin revied sie 113. boolen operon in eoldresting compos Svovat erect, alin, ing and Moding Thve-dimensiona sais (hove {141 Eating Tee Omensena Sos Rotate, Mlror34, 3a, Alin 10 1112 Advanced Ming Toon Solis Filet, chamfer, Sle, Secon 15. thre-diensiona sutaces (hours) 151 Tee Omosiona Sufce Moding 2s, ce 352. Cen derived Tree Dimensional srfacshued surface, tbusted ‘surface, 3 polyon mes, evowedsurace 153 Oreming Three Dimensional surace rmitves Creating redeined 30 ‘arfce meshes 16. Working with Advanced Tiree Dimensional Viewing (shou) 3D OVbt, Usre projection option n sD orb. shadngin 3dr Ang visual isin 3D ort Reset ondpesetingh 3D ort, ing Dynamic 1 George Omura AutoCAD 2000 8 Puss 2 Sham Tite, AutAD 208 fr Englnes &Desnes Dreameec Pres 3._ Software manslsareto be mnaunerd depending on stricter 6, Coannaueh ple, valuation Scheme foreach stage: ‘The olowing euluaton seme sal be followed fr cominacus assesment Tae Fos | Marsan Tnodineniomlaawng [36 Three dneioneawns [7030 Feng pring «fe WORKING DRAWING ‘AR 605, Practical : 4 Year: pan: course Objective: Expeted raring objectives by stadens ater comletionof this cour ae 35 falows Tv ARee the completion of ts couse the dens wl beable make emolte et of working awn. + "Thestudents wl make oe complete set of manual workg rowingsof2 3 soreresidentia bug of apprx10005qplih are of ther own design completed n previous deogn Sto cases ‘Te droning i 2 sie, tbe prepress flows: "eat Wom foundon Tot epi ridge Showingal neesary elements ‘SN Topi ‘Sheet [Wes [Mars “ARGTECTURAL DRAWINGS | pxasstsate 2000100) o fale 51 | tocton map sean with sating out of bling an nasrucure serves nes 2 | oor Pane (ete) 122 | boserantor ceter/ Greund Fst Second foo: ans. 122 | noot/ Terrace plan wih aca back 7 | aOR a ESTONSTCae Tae jasoaz030 2 | rey aca side Kevations WYSIENW or ratation we) 12 | tenga Cress Seton tu staese 23 | blow ue deta of extra ternal wl | RENGHOUNDATON PLAN z eye sictiowscle 1303200) cx | Tench pin, Seting out €2 | seundaton footing Pan ca | Tesch section showing timberng of ‘vences (enteral internal al) cea | reundatonFotng ection 5 _| lowup deta necessary | SRCASE ale 120. SORES za, e 2 | sectional Eletio wihelemens anal balusters sep & ese sols ramp et fam 7) opens eae 01m a) a ee (Worn! & Verte and own dels £2 | Msinboor-sewton, scons, nd Siawsp stale £3, | mera) Door - flestion sections and owe deta Wide Ventas 20 130) 4 | Bevan setons, and blowup deals Sowing neha shading dees Arch a hight ets ‘reparation a Dorwdows hed fa fa Fem oc TCRERELT sa, ended Celing Fae Cee an & Sections and fang dtals oot th Fit Sl or Dore) anand sections Ridges, Eves, rey Hips, coving fasting stating wth OPC te detais inating sound ad erm esto materia. 22] WALIASONRES & COLUTANE evatons & sectone showing bods Mcelaneous detainees, esl, lth, window amb coves, cones cxnamentalltane/conerete werkt ha tayoutPian, esaions & Section: 2 1 ‘STRUCTURAL DRAWINGS Foundation ae 1208 130) Footing Detal-Pan and Sections Pah Band, Te Beams Bar bending stele ‘Solum, Beam & Sah (sale50:20.:401 BP Wpial sab Sections 4 | niscelancos deta asstaresse, ao, el tel ore, ue & pers Tinea ACOA Tepe “Te Problem 2165.68 ae fo 4 The professional practce of achtecura working [6a A and 8 } by Waka, 2 Bung wing wih an erga approach to ald endronmet (By MG. ouh em ial tps 3. Constucton technology Wo 223 & 4 by R.Chadley 4 Constrcton eine vol by 1. Grundy 5. Arcee date by emstNevte. DESIGN STUDIO VI AR 651 Practical 22 Year : Pare =i ‘couse Objective: + Tote abet exabh appropiate structural aye aranmontl como indocen, ‘+ Anal ste station and to establish appropiate and ute, Zoi ae Incrperation of ndsapedcutéoor spaces. ‘+ Understanding atevtecral character of pubic buldng, wsibity & Trease | Saeed Pape Conte? Was Moats suison Distaton 174 Hows [data Balding | Master Fa, Pn, Weeks) | Buiing with rae soan | Section fleeations, | 240 fracture Sore tsi7— | Construction Det tation tnerorbeawine| Fallston | Pespectve Drawings Taz [Tina len ~Deugna? | concep} anyofabovefaciier | Drawingrin o [Project provided) | Fre Hand etches valuation Sched for each ere Weenie [See Tse co a [uteatre a Cae Sades | 42] veo preseratin ates oles study 4 | Concern a = sates 5 | Fauld | ausve aad Tora Ea References LL Tene vere Standard 2 Nault etter] sgn Oat [ESTIMATING AND COSTING cE 659 Lecture : 2 Year: Tutorial: 2 Par: Course Objective: “Toappreciae the need for ertmaing and carting. to understand, saci the rnetnodsofdong sth approximate and deta exits, fear he Procedure orate anahss and method of valtion, course Tope: Introduction (hou) 412. UnisofMeatremort an Payments er Vareus hems of Busing 1221 Works nd Motrin 1.3, purpose of tinting 14. Requrement ofesimatrg 45, Methods ot Mesturement of Bud Wore Lb SubHesdofVrousters of Butdg Wore LT. Vaows Method of aking ost Guanes 4B. Abracing lof anaes “Types of Etimates (hous) 2 Sippementary Este 25. Anal Repa nd Maintenance Estmate 26. Gtenson and nprovere Estimate 27. Complete Esinate 28. Spit pofthe Cor oF Bane Works Ansty of ater (hous) 2 Invoduction 3.2. Purpse of Rat Anais 33. Reqarememtatrate nas 215. Procedure fate Anal for Buldng Works 351. Water Sup andSantary Wer. | Valuation (6 ours) 42. Purpose Vtstion 123, Princes of Valation 14, Tem UsedinVauison 185, Vvlour Method of string the Vl of roperty ‘46. Methodef austen Report Wing 5. Detalg tstimate (8 our) Satine fora Sng Room Bulg S52. estimate for Two Reem Burg 3. tmateof arth Workin Read Canseucon by Tree Methods 6 computer Aplation (hous) 62 stmmes er One Room Boidng 62 Valuation of Property 63. fate Anais “ato: 1 poprsimateecinate a budding project 2 Dated estimates oe storied redental bling 2 Valaion of property Reference Books: 1 Guilesimating, Quantity Surveyingand Vaationby AK Uphaps,Kation Pubtsing Hue, Lona. 2. Estimating and Costing by Chater valaton Scheme The question wl cover a the chepersin the Slabs. Te ewtalon scheme willbe ae tdestedin the able Boom, Dapied [Tous [esoarsaton™ Tea [33 = Tora 30 URBAN AND SETTLEMENT PLANNING ‘AR 652 lecture: 4 Year st Par: Course Objectives The couse irs ot faring the students wh the sol ecnomi and ‘organizational perspectives at national regional and local evel a5 2 conten whion sree produc hey 10 be paced, Ts wil abo prove the necessary baciground for making formed eoces fr further studs a ‘ead speslzed dines Special releence willbe made athe pclers ‘turbans Nepal Specialy sins to sudy tout varus caneeptf planing and ge exposed ‘wrth varus asec planing pocess course Tops: 1. Introduction (hou) TE" Definton and coca of Pans, elements of human settee rele oman and voce 1.2, the grown and des of human setlemeats,samning objec, berate 13. Planning as nterdseptnary sje 14. Hitoeal and vadtona setemens, Uan and al hares of Setement suite setUerets exes om Nepal 1.5. Cone of bn pl rl sete slanaing 2. Urbon/y Plening 21. Puinningeorcepts (0mous) 222 Marsoley ofthe ety and zocaeconarc/pales! and technalopeal processes ney woweh 2.2 mrodution to theoeial mal planing ‘trButlon to panning tap Si Pate Se Cheneer Felevnce toon Faring contest 2.2, Development Pans (hours) 2224. valour types of plane Navona! plan-eion! pan: macer an Stuctre’ plavzona) development anor] ewopment plan th general scope, content, planning procees and lang sles 222 and Phnnng = compreersive land ase plan and its faneone 223, Subsion andzoning betas 224, Steps need to devel and seplon 2, Maing Prati a Nep (hous) ito overview on Nepsere Planning Protce both Rural and ‘rsen Flaming Contempo) panning praciee ~ comprehensive planning, partcpstoy pling tastes Panne lsttutons and Hamingssues url Planing (3 our) 232 concepof aval planning 52 Rural planing. developmen panne. aereaches 10 rr ‘deveopment nepeted ral development, wrbanzaten and furl developmen ral serace centers 3.12. Nepal's experience rua development growth axes ond RD 13 Urbanzaton in Neo and dntages Uo fl devecament (Uesen fra vetions) ‘seni Features of Urban/Rural Panning (20 ows) 42 Denegrepy/epustion sce popultion compestion, saci, 42, Employment base ander base fem of ersayment 423, Utttes and services water suppiidrmae,sewerage/ntation, secre, taneportaton per and paterne bon and Rural Panning (sous) SS ssa features of urbana anne for ata colecton- Survey (aming tecique, types of suey, Sates! anayss —mein/mosefmedum, standard deviation, corrections epesion vane Popstion projection, pout rae calstion, demand forecasts and lessen of errynecaneay case stuey (ou) (he Stuy of Panning related potter andi eoliton, References The rsan Pattern Pinspls end Practice Town and Country Pann Lew ese Fathando Valey Ps Development Pan 1966 Wall. Pan: Sci Science Reserch ond Thess Wing, Buddha Passer, Paik 5. Dagar os Susainabe Urban Develepent 5 DckarihaGurung:Dimensons ef Devlopment Ealuton Scere: ‘The questions wl cove a he chapters slabs. Te evaluation seheme wi Tae centers | Hows | puarbitiont a6 10 ste. 10. ‘STRUCTURES I ce657 lecture : 3 Year st Tutorial: 2 Par: course Objective: Te understand the baie deslgn procedures and cleations for simple rac components in Tiber Stee! and Concrete 1. Intradution to Foundation Engineering (hous) TE Nomencstre offerte 112. ase phyil properties oscil 13. Invotuctionto sl expleratin methods 1.4. Use typeand tentative propotonine of resining wale 15, Feating and Foundations yes 116. Guidlines for depthofoundatondanensoning of fotng based on {en auc of fe beating apacy ofall 1.7 Invotction raft wth basement, pe oundatins. Properties of Sructural Maer (hous) 222" Svucura timber: types and mechanical properties 22 Masonry: types brasblon sone wih deren: ypesot moray 23. Scr tel mechani proper, sresestainenve ct mid 2A Review cf concite and enforced concrete ropes Timber strutares (hous) 32” esin of inber wth various component, thelr stucural finns 5.2 Typeset beams columns and foundations, inudng ats nd 33, “Typerel Umber rool ruses wth ins and conection 35. Desi f imple tinber wuss, inber ears and timber ens. 4 Masonry stroctures (3 our) a a2 “Sractrl properties of ratory component: Inpane and to plane sehr of masonry wal ‘Sendener ai of maeeny wal 4° Oesienprincpes ofasomy stuctres 485 signer smote masonry wal ls, and foundations 5. Structural tel (20 hows) 52 Stand and buy seton of tetas 52. Rastedand welded comectons srpleconectons, ad seca 54 Members betel coneession te sets an eum ts. 5S Beams sel beams andoultup sears 6 Induction tose trusses and nds uldngs. ST fasesandfoonngs types, design abs ard gusseted bases 6 Stuturl Coneete (25 hous) 2 Propemssofcoerete ad infor see 52 _Designapprosehes 163 Um ate Dean of rentoredconrete section for Sending and shes 64 ond erenth and deveapmentensth 165. SerwerbltyLime Sates of defection ndcracing 166 OesigneF RC. beams, one-way abs Land beam, twowey sts

You might also like