Professional Documents
Culture Documents
Tasks To Be Completed by Week: Winter Term - Week 7 Joe
Tasks To Be Completed by Week: Winter Term - Week 7 Joe
Tasks To Be Completed by Week: Winter Term - Week 7 Joe
Joe
- Close all open git issues
- Open new tickets for current tasks
Adit
Aslan
- Familiarity
- [Log-in] Add drop down on phone number input for the country code.
- [Dashboard-Review] - Numbers, if a whole number, add a '.0' after it.
Mike
Hriday
- Continue Working on the Requirements Revision to keep up with any issues
- Finalize the architecture diagrams to put in the design document in a meeting with
Michael
- Writing rationales for technologies used
Eli
- Flesh out Technologies Used section of Design Doc
- Update Definitions section
Pasha
Adit
- Restructure the app and use Redux
- Get login, logout, forget the password, finalized
- Be able to push and pull pictures from S3
Aslan
- [Log-in] Add drop down on phone number input for the country code.
- [Log-in] Add drop down on gender choices(male, female , other).
- [Auth - Sign In] - Add sign in with Facebook
Mike
- Continue working on the general architecture diagram
- Continue working on context diagram
- Finish “Design Goals” section in design document
- Finish “requirements” slide for team presentation
Hriday
- Work on sequence diagram about registering a new user within VyB
Eli
- System Overview for design doc
- Alternative Designs slide for presentation dry-run
- Technical Challenges slide for presentation dry-run
Pasha
- Redux research
- Setup android emulator
- Finish the “Security and Testing” slides
Adit
- Update queries to subscriptions in GraphQL
- Get map working and plot business data from databases
- Implement search in the dashboard for users and businesses
- Finalize followers and following buttons to show the relation between users.
Aslan
- Submitting new rating, revert back to home screen (#106)
- New User Profile Page
- Presentation Prep
Mike
- Continue working on the general architecture diagram
- Finish “Design Goals” section in the design document
- Add updated graph into design document
Hriday
- Completion of the sequence diagram for design document
- Rationale for technologies used
Eli
- Fix up slides/ slide notes for presentation responsibilities
- System Overview section - design document
- https://drive.google.com/open?id=1WLmJSz6OYuDhTqHolJ6kM3awInTpirybx3_C31aPE
bw BUG FIX LOG
Pasha