PLANT TRIP

(BLACKOUT)

PEMBAGIAN TUGAS
(SPV SHIFT)

KOORDINASI
NORMALISASI DOKUMENTASII
(SPV SHIFT/
(OPERATOR) (OPERATOR)
OPERATOR)
Laporkan kejadian dan
estimasi waktu
CATAT DAN komunikasi normalisasi
DOKUMENTASIKAN
CHECK / ACTION / DETAIL GANGGUAN
MANAGEMENT
PASTIKAN EKSEKUSI

CB 52-R & CB
52-G OPEN
NO
DEG AUTO NO RUNNING BLACKOUT
BACKUP? MANUAL 2 UNIT? PLN
DEG AUTO
BACKUP OPEN DRAIN
YES CONDENSER
BEBAN YES
MSV & MCV
ESSENTIAL
CLOSED
TERBACKUP A
VNT TBN RESET
CLOSE MOV AFTER
VACUUM BREAKER koordinasi
DAN SIPHO N SCRUBBER
BREA KER OPEN

VACUUM UP
EOP AUTO
START OPEN BYPASS DRAIN
SCRUBBER

TURNI NG GEAR NO ATS ON


JOP AUTO START TURNING GEAR ENGAGE
AUTOSTART SAAT 0
SAA T 200 RPM
RPM AUTOSTART? MANUAL
PERSIAPAN
BACKFEEDING
KONDISI SUMUR YES
DAN SEPARATOR
AMA N
SINKRON
KECEPATAN
TURBIN 5 RPM BACKFEEDING
ROCK MUFFLER DISETUJUI?
NORMAL

PO ND AM AN LOAD UP
PROSES BACKFEEDING
DAN DE-ENERGIZE 6.3
KV

A SELESAI
TURBIN TRIP

PEMBAGIAN TUGAS
(SPV SHIFT)

KOORDINASI
NORMALISASI DOKUMENTASII
(SPV SHIFT/
(OPERATOR) (OPERATOR)
OPERATOR)

Laporkan kejadian dan


estimasi waktu
CATAT DAN komunikasi normalisasi
DOKUMENTASIKAN
CHECK / ACTION / DETAIL GANGGUAN
MANAGEMENT
PASTIKAN EKSEKUSI

GCB 52-G RESET LOCKOUT


PLN
OPEN RELAY DI GTPR

CB EKSITASI 41
OPEN SINKRON
RESET TURBIN TRIP

MSV & MCV


CLOSED
PINDAHKAN
SELECTOR PADA
PANEL ASY KE POSISI LOAD UP
ATS
LUBE OIL SYSTEM
NORMAL

COOLING & VACUUM ATS ON


SYSTEM SELESAI
NORMAL

AIR BREATHING VALVE


OPEN

NO
TURNING GEAR
JOP TURNING GEAR
AUTOSTART ENGAGE MANUAL
AUTO START AUTOSTART?
@0 RPM
@200 RPM

YES

KECEPATAN
TURBIN 5 RPM
A

TEGANGAN STANDBY
DI INCOMING MV 6.3
KV

RESET SEMUA CB
SEBELUM MV DE-
ENERGIZE

SEMUA CB SUDA H
DIRESET?

PASTIKAN SEMUA CB
BEBAN NON-
ESSENTIAL OPEN

RUNNING MOP (B)


NON ESSENTIAL

LEPAS BEBAN
ESSENTIAL

OPEN CB 52DG-3

CLOSE CB 52LB-3