ADHUNIK POWER & NATURAL RESOURCES LIMITED

2x270 MW, PADAMPUR


MECHANICAL MAINTENANCE DEPARTMENT
Doc. No.: APNRL/IMS/F/Q/MM/009
BREAKDOWN ANALYSIS REPORTS
EQUIPMENTS NAME: CW PUMP-2A EQUIPMENTS CODE: CWCWPMME03 DATE 01/08/2019

EQUIPMENT BREAK DOWN REPORT


Breakdown report No APNRL/IMS/F/Q/MM/009
Date & Time of Event 01/08/2019 , 09:04HRS
Exact Location CW Pump House
Brief Description of Equipment/Department. CW Pump-2A
Immediate Action Taken Pump was change over and PTW applied
Resulting damages (If any) NO
Root Cause Analysis (Why Why):
During dismantling of pump no any major damage were found. Pump was assembled and
trial taken found ok. vibration was normal.

Correction/Corrective Action
Sl.no. Correction Corrective Action
Pump and motor were decoupled and
1. No major defects were found. All
motor removed from position & place
01 mechanical parts were found healthy
outside.
condition.
Pump was dismantled parts by parts
02 2. Cora coating were carried out like ball
like bearing housing, discharge head,
assembly, and column pipe
shaft, muff coupling, column pipe
3. Pump was assembled in reverse process.
impeller and bell mouth.
Preventive Action
Sl.no. Action
01 At the time of preventive maintenance checked coupling, coupling bush base bolt and all
related mechanical parts.
02

Spares Consumption: 2 No’s line shaft sleeve and gland packing

Reporting of Break down Event

Reported by Name of the person with designation Department – M.M.D


 Case investigated by depts. 1. Mr. S.K.Sahoo (Sr. Manager)
 Signature:-
Name & designation:- N S P Rao (Head-MMD)
For APNRL Safety Dept. Use
Further investigation required
Name & Signature

Approved By: Issued By: Date::