VOLUME URUGAN GI 150kV BAYAN

REKAPITULASI VOLUME URUGAN

No Potongan Volume Sat

1 VOLUME LAYER 1 A 1,110.30 m3

2 VOLUME LAYER 1 B 830.20 m3

3 VOLUME LAYER 2 A 1,782.31 m3

4 VOLUME LAYER 2 B 731.19 m3

5 VOLUME LAYER 3 A 1,884.62 m3

6 VOLUME LAYER 3 B 628.88 m3

7 VOLUME LAYER 4 A 1,256.41 m3

8 VOLUME LAYER 4 B 419.26 m3

9 VOLUME LAYER 5 A 2,411.73 m3

10 VOLUME LAYER 6 A 2,894.08 m3

11 VOLUME STRIPING 1,858.00 m3


Total volume URUGAN 15,807.01 m3
VOLUME LAYER 6a GI 150kV BAYAN
Layer 6a
Potongan A
Titik Acuan Elevasi 43 Level 0
elevasi Layer 6 42.450 42.450 42.450 42.450 42.450 42.450 42.450
elevasi Layer 5 42.150 42.150 42.150 42.150 42.150 42.150 42.150
jarak m 1 10 15 15 15 21
jarak komulatif m 0 1 11 26 41 56 77
beda tinggi m 0.30 0.30 0.30 0.30 0.30 0.30
Luasan m2 0.150 3.000 4.500 4.500 4.500 6.300 22.950

Layer 6a
Potongan B
Titik Acuan Elevasi 43 Level 0
elevasi Layer 6 42.450 42.450 42.450 42.450 42.450 42.450 42.450
elevasi Layer 5 42.150 42.150 42.150 42.150 42.150 42.150 42.150
jarak m 1.6 10 15 15 15 21
jarak komulatif m 0 1.6 11.6 26.6 41.6 56.6 77.6
beda tinggi m 0.30 0.30 0.30 0.30 0.30
Luasan m2 0.000 1.500 4.500 4.500 4.500 6.300 21.300

Layer 6a
Potongan C
Titik Acuan Elevasi 43 Level 0
elevasi Layer 6 42.450 42.450 42.450 42.450 42.450 42.450
elevasi Layer 5 42.150 42.150 42.150 42.150 42.150 42.150
jarak m 2 10 15 15 15 21
jarak komulatif m 0 2 12 27 42 57 78
beda tinggi m 0.30 0.30 0.30 0.30 0.00
Luasan m2 0.000 1.500 4.500 4.500 4.500 3.150 18.150

Layer 6a
Potongan D
Titik Acuan Elevasi 43 Level 0
elevasi Layer 6 42.450 42.450 42.450 42.450 42.450 42.450
elevasi Layer 5 42.150 42.150 42.150 42.150 42.150 42.150
jarak m 2.3 10 15 15 15 21
jarak komulatif m 0 2.3 12.3 27.3 42.3 57.3 78.3
beda tinggi m 0.30 0.30 0.30 0.30 0.30 0.30 0.00
Luasan m2 0.690 3.000 4.500 4.500 4.500 3.150 20.340
VOLUME LAYER 6a GI 150kV BAYAN

Layer 6a
Potongan E
Titik Acuan Elevasi 43 Level 0
elevasi Layer 6 42.450 42.450 42.450 42.450 42.450 42.450
elevasi Layer 5 42.150 42.150 42.150 42.150 42.150 42.150
jarak m 2.6 10 15 15 15 21
jarak komulatif m 0 2.6 12.6 27.6 42.6 57.6 78.6
beda tinggi m 0.30 0.30 0.30 0.30 0.30 0.00
Luasan m2 0.390 3.000 4.500 4.500 4.500 3.150 20.040

Layer 6a
Potongan F
Titik Acuan Elevasi 43 Level 0
elevasi Layer 6 42.450 42.450 42.450 42.450 42.450 42.450
elevasi Layer 5 42.150 42.150 42.150 42.150 42.150 42.150
jarak m 3 10 15 15 15 21
jarak komulatif m 0 3 13 28 43 58 79
beda tinggi m 0.30 0.30 0.30 0.30 0.30 0.30 0.00
Luasan m2 0.900 3.000 4.500 4.500 4.500 3.150 20.550

Layer 6a
Potongan G
Titik Acuan Elevasi 43 Level 0
elevasi Layer 6 42.450 42.450 42.450 42.450 42.450 42.450
elevasi Layer 5 42.150 42.150 42.150 42.150 42.150 42.150
jarak m 3.5 10 15 15 15 21
jarak komulatif m 0 3.5 13.5 28.5 43.5 58.5 79.5
beda tinggi m 0.30 0.30 0.30 0.30 0.30 0.30 0.00
Luasan m2 1.050 3.000 4.500 4.500 4.500 3.150 20.700

Layer 6a
Potongan H
Titik Acuan Elevasi 43 Level 0
elevasi Layer 6 42.450 42.450 42.450 42.450 42.450 42.450
elevasi Layer 5 42.150 42.150 42.150 42.150 42.150 42.150
jarak m 3.8 10 15 15 15 21
jarak komulatif m 0 3.8 13.8 28.8 43.8 58.8 79.8
beda tinggi m 0.30 0.30 0.30 0.30 0.30 0.30 0.00
Luasan m2 1.140 3.000 4.500 4.500 4.500 3.150 20.790
VOLUME LAYER 6a GI 150kV BAYAN

Layer 6a
Potongan I
Titik Acuan Elevasi 43 Level 0
elevasi Layer 6 42.450 42.450 42.450 42.450 42.450 42.450
elevasi Layer 5 42.150 42.150 42.150 42.150 42.150 42.150
jarak m 4.1 10 15 15 15 21
jarak komulatif m 0 4.1 14.1 29.1 44.1 59.1 80.1
beda tinggi m 0.30 0.30 0.30 0.30 0.30 0.30 0.00
Luasan m2 1.230 3.000 4.500 4.500 4.500 3.150 20.880

Layer 6a
Potongan J
Titik Acuan Elevasi 43 Level 0
elevasi Layer 6 42.450 42.450 42.450 42.450 42.450 42.450
elevasi Layer 5 42.150 42.150 42.150 42.150 42.150 42.150
jarak m 4.5 10 15 15 15 21
jarak komulatif m 0 4.5 14.5 29.5 44.5 59.5 80.5
beda tinggi m 0.30 0.30 0.30 0.30 0.30 0.30 0.00
Luasan m2 1.350 3.000 4.500 4.500 4.500 3.150 21.000
REKAPITULASI VOLUME LAYER 6a GI 150kV BAYAN

No Potongan Luasan Interval Volume Sat

1 Potongan A 22.950
13.45 297.58 m3
2 Potongan B 21.300
15 295.88 m3
3 Potongan C 18.150
15 288.68 m3
4 Potongan D 20.340
15 302.85 m3
5 Potongan E 20.040
15 304.43 m3
4 Potongan F 20.550
15 309.38 m3
6 Potongan G 20.700
15 311.18 m3
7 Potongan H 20.790
15 312.53 m3
8 Potongan I 20.880
15 314.10 m3
9 Potongan J 21.000
15 157.50 m3
10 Potongan K 0.000
2.85 - m3
11 Potongan L 0.000
m3
Total volume Timbunan Layer 6a 151.3 2,894.08 m3

DIPERIKSA DIPERIKSA DIAJUKAN OLEH


PT. PLN ( PERSERO) PT. PLN ( PERSERO ) PT. SEJAHTERA MULIA KENCANA
UPK KITRING NUSRA II JMK UMK II

………………………………………..……. …………………………….…… …………………………….……


Pengawas Pengawas Lapangan Sipil Engineer
Grafik Hasil Pengukuran Elevasi Layer 6

elevasi layer 6 pot A elevasi layer 6 pot B


elevasi Layer 5 elevasi Layer 5
43.000 43.000

42.500 42.500

42.000 42.000

41.500 41.500

41.000 41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Elevasi Layer 6 Pot C Elevasi Layer 6 Pot D


elevasi Layer 5 elevasi Layer 5
43.000 43.000

42.500 42.500

42.000 42.000

41.500
41.500

41.000
41.000

40.500
40.500

40.000
40.000 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
Grafik Hasil Pengukuran Elevasi Layer 6

Elevasi Layer 6 Pot E Elevasi Layer 6 Pot F


Elevasi Setelah Striping Elevasi Setelah Striping
43.000 43.000

42.500 42.500

42.000 42.000

41.500 41.500

41.000 41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Elevasi Layer 6 Pot G Elevasi Layer 6 Pot H


Elevasi Setelah Striping Elevasi Setelah Striping
43.000 43.000

42.500 42.500

42.000 42.000

41.500 41.500

41.000 41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
41.000 41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
Grafik Hasil Pengukuran Elevasi Layer 6

Elevasi Layer 6 Pot I Elevasi Layer 6 Pot J


Elevasi Setelah Striping Elevasi Setelah Striping
43.000 43.000

42.500 42.500

42.000 42.000

41.500 41.500

41.000 41.000

40.500 40.500

40.000
40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Elevasi Layer 6 Pot K Elevasi Layer 6 Pot L


Elevasi Setelah Striping
Elevasi Setelah Striping
43 43

42.5 42.5

42 42

41.5 41.5

41 41

40.5 40.5

40 40
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
41

40.5 40.5

40 40
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
VOLUME LAYER 5a GI 150kV BAYAN
Layer 5a
Potongan A
Titik Acuan Elevasi 43 Level 0
elevasi Layer 5a 42.150 42.150 42.150 42.150 42.150 42.150 42.150
elevasi Layer 4a 41.900 41.900 41.900 41.900 41.900 41.900 41.900
jarak m 1 10 15 15 15 21
jarak komulatif m 0 1 11 26 41 56 77
beda tinggi m 0.25 0.25 0.25 0.25 0.25 0.25
Luasan m2 0.125 2.500 3.750 3.750 3.750 5.250 19.125

Layer 5a
Potongan B
Titik Acuan Elevasi 43 Level 0
elevasi Layer 5a 42.150 42.150 42.150 42.150 42.150 42.150 42.150
elevasi Layer 4a 41.900 41.900 41.900 41.900 41.900 41.900 41.900
jarak m 1.6 10 15 15 15 21
jarak komulatif m 0 1.6 11.6 26.6 41.6 56.6 77.6
beda tinggi m 0.25 0.25 0.25 0.25 0.25
Luasan m2 0.000 1.250 3.750 3.750 3.750 5.250 17.750

Layer 5a
Potongan C
Titik Acuan Elevasi 43 Level 0
elevasi Layer 5a 42.150 42.150 42.150 42.150 42.150 42.150
elevasi Layer 4a 41.900 41.900 41.900 41.900 41.900 41.900
jarak m 2 10 15 15 15 21
jarak komulatif m 0 2 12 27 42 57 78
beda tinggi m 0.25 0.25 0.25 0.25 0.00
Luasan m2 0.000 1.250 3.750 3.750 3.750 2.625 15.125

Layer 5a
Potongan D
Titik Acuan Elevasi 43 Level 0
elevasi Layer 5a 42.150 42.150 42.150 42.150 42.150 42.150
elevasi Layer 4a 41.900 41.900 41.900 41.900 41.900 41.900
jarak m 2.3 10 15 15 15 21
jarak komulatif m 0 2.3 12.3 27.3 42.3 57.3 78.3
beda tinggi m 0.25 0.25 0.25 0.25 0.25 0.25 0.00
Luasan m2 0.575 2.500 3.750 3.750 3.750 2.625 16.950
VOLUME LAYER 5a GI 150kV BAYAN

Layer 5a
Potongan E
Titik Acuan Elevasi 43 Level 0
elevasi Layer 5a 42.150 42.150 42.150 42.150 42.150 42.150
elevasi Layer 4a 41.900 41.900 41.900 41.900 41.900 41.900
jarak m 2.6 10 15 15 15 21
jarak komulatif m 0 2.6 12.6 27.6 42.6 57.6 78.6
beda tinggi m 0.25 0.25 0.25 0.25 0.25 0.00
Luasan m2 0.325 2.500 3.750 3.750 3.750 2.625 16.700

Layer 5a
Potongan F
Titik Acuan Elevasi 43 Level 0
elevasi Layer 5a 42.150 42.150 42.150 42.150 42.150 42.150
elevasi Layer 4a 41.900 41.900 41.900 41.900 41.900 41.900
jarak m 3 10 15 15 15 21
jarak komulatif m 0 3 13 28 43 58 79
beda tinggi m 0.25 0.25 0.25 0.25 0.25 0.25 0.00
Luasan m2 0.750 2.500 3.750 3.750 3.750 2.625 17.125

Layer 5a
Potongan G
Titik Acuan Elevasi 43 Level 0
elevasi Layer 5a 42.150 42.150 42.150 42.150 42.150 42.150
elevasi Layer 4a 41.900 41.900 41.900 41.900 41.900 41.900
jarak m 3.5 10 15 15 15 21
jarak komulatif m 0 3.5 13.5 28.5 43.5 58.5 79.5
beda tinggi m 0.25 0.25 0.25 0.25 0.25 0.25 0.00
Luasan m2 0.875 2.500 3.750 3.750 3.750 2.625 17.250

Layer 5a
Potongan H
Titik Acuan Elevasi 43 Level 0
elevasi Layer 5a 42.150 42.150 42.150 42.150 42.150 42.150
elevasi Layer 4a 41.900 41.900 41.900 41.900 41.900 41.900
jarak m 3.8 10 15 15 15 21
jarak komulatif m 0 3.8 13.8 28.8 43.8 58.8 79.8
beda tinggi m 0.25 0.25 0.25 0.25 0.25 0.25 0.00
Luasan m2 0.950 2.500 3.750 3.750 3.750 2.625 17.325
VOLUME LAYER 5a GI 150kV BAYAN

Layer 5a
Potongan I
Titik Acuan Elevasi 43 Level 0
elevasi Layer 5a 42.150 42.150 42.150 42.150 42.150 42.150
elevasi Layer 4a 41.900 41.900 41.900 41.900 41.900 41.900
jarak m 4.1 10 15 15 15 21
jarak komulatif m 0 4.1 14.1 29.1 44.1 59.1 80.1
beda tinggi m 0.25 0.25 0.25 0.25 0.25 0.25 0.00
Luasan m2 1.025 2.500 3.750 3.750 3.750 2.625 17.400

Layer 5a
Potongan J
Titik Acuan Elevasi 43 Level 0
elevasi Layer 5a 42.150 42.150 42.150 42.150 42.150 42.150
elevasi Layer 4a 41.900 41.900 41.900 41.900 41.900 41.900
jarak m 4.5 10 15 15 15 21
jarak komulatif m 0 4.5 14.5 29.5 44.5 59.5 80.5
beda tinggi m 0.25 0.25 0.25 0.25 0.25 0.25 0.00
Luasan m2 1.125 2.500 3.750 3.750 3.750 2.625 17.500
REKAPITULASI VOLUME LAYER 5a GI 150kV BAYAN

No Potongan Luasan Interval Volume Sat

1 Potongan A 19.125
13.45 247.98 m3
2 Potongan B 17.750
15 246.56 m3
3 Potongan C 15.125
15 240.56 m3
4 Potongan D 16.950
15 252.38 m3
5 Potongan E 16.700
15 253.69 m3
4 Potongan F 17.125
15 257.81 m3
6 Potongan G 17.250
15 259.31 m3
7 Potongan H 17.325
15 260.44 m3
8 Potongan I 17.400
15 261.75 m3
9 Potongan J 17.500
15 131.25 m3
10 Potongan K 0.000
2.85 - m3
11 Potongan L 0.000
m3
Total volume Timbunan Layer 5a 151.3 2,411.73 m3

DIPERIKSA DIPERIKSA DIAJUKAN OLEH


PT. PLN ( PERSERO) PT. PLN ( PERSERO ) PT. SEJAHTERA MULIA KENCANA
UPK KITRING NUSRA II JMK UMK II

………………………………………..……. …………………………….…… …………………………….……


Pengawas Pengawas Lapangan Sipil Engineer
Grafik Hasil Pengukuran Elevasi Layer 4

Elevasi layer 1 Pot A Elevasi layer 1 Pot B


elevasi Layer 4a elevasi Layer 4a
43.000 43.000

42.500 42.500

42.000 42.000

41.500 41.500

41.000 41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Elevasi Layer 1 Pot C Elevasi Layer1 Pot D


elevasi Layer 4a elevasi Layer 4a
43.000 43.000

42.500 42.500

42.000 42.000

41.500
41.500

41.000
41.000

40.500
40.500

40.000
40.000 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
Grafik Hasil Pengukuran Elevasi Layer 4

Elevasi Layer 1 Pot E Elevasi Layer 1 Pot F


Elevasi Setelah Striping Elevasi Setelah Striping
43.000 43.000

42.500 42.500

42.000 42.000

41.500 41.500

41.000 41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Elevasi Layer 1 Pot G Elevasi Layer 1 Pot H


Elevasi Setelah Striping Elevasi Setelah Striping
43.000 43.000

42.500 42.500

42.000 42.000

41.500 41.500

41.000 41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
41.000 41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
Grafik Hasil Pengukuran Elevasi Layer 4

Elevasi Layer 1 Pot I Elevasi Layer 1 Pot J


Elevasi Setelah Striping Elevasi Setelah Striping
43.000 43.000

42.500 42.500

42.000 42.000

41.500 41.500

41.000 41.000

40.500 40.500

40.000
40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Elevasi Layer 1 Pot K


Elevasi Setelah Striping Elevasi Layer 1 Pot L
43 43 Elevasi Setelah Striping

42.5 42.5

42 42

41.5 41.5

41 41

40.5 40.5

40 40
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
41

40.5 40.5

40 40
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
K, L Blm Diurug
VOLUME LAYER 4b GI 150kV BAYAN

Layer 4b 5.7 5.700


Potongan C cek
Titik Acuan Elevasi 43 Level 0 5.7
elevasi Layer 4 41.900 41.900 41.900 41.900 41.900 41.900 41.900
elevasi Layer 3 41.700 41.700 41.700 41.700 41.700 41.700 41.700
jarak m 2 10 15 15 15 21
jarak komulatif m 0 2 12 27 42 57 78
beda tinggi m 0.20
Luasan m2 0.000 0.000 0.000 0.000 0.000 2.100 2.100

Layer 4b 3.6 5.700


Potongan D cek
Titik Acuan Elevasi 43 Level 0 5.7
elevasi Layer 4 41.900 41.900 41.900 41.900 41.900 41.900 41.900
elevasi Layer 3 41.700 41.700 41.700 41.700 41.700 41.700 41.700
jarak m 2.3 10 15 15 15 21
jarak komulatif m 0 2.3 12.3 27.3 42.3 57.3 78.3
beda tinggi m 0.20
Luasan m2 0.000 0.000 0.000 0.000 0.000 2.100 2.100

VOLUME LAYER 4b GI 150kV BAYAN

Layer 4b
Potongan E
Titik Acuan Elevasi 43 Level 0
elevasi Layer 4 41.900 41.900 41.900 41.900 41.900 41.900 41.900
elevasi Layer 3 41.700 41.700 41.700 41.700 41.700 41.700 41.700
jarak m 2.6 10 15 15 15 21
jarak komulatif m 0 2.6 12.6 27.6 42.6 57.6 78.6
beda tinggi m 0.20
Luasan m2 0.000 0.000 0.000 0.000 0.000 2.100 2.100

9.6 11.700
Layer 4b cek
Potongan F 11.7
Titik Acuan Elevasi 43 Level 0
elevasi Layer 4 41.900 41.900 41.900 41.900 41.900 41.900 41.900
elevasi Layer 3 41.700 41.700 41.700 41.700 41.700 41.700 41.700
jarak m 3 10 15 15 15 21
jarak komulatif m 0 3 13 28 43 58 79
beda tinggi m 0.20
Luasan m2 0.000 0.000 0.000 0.000 0.000 2.100 2.100

Layer 4b 9.6 11.700


Potongan G cek
Titik Acuan Elevasi 43 Level 0 11.7
elevasi Layer 4 41.900 41.900 41.900 41.900 41.900 41.900 41.900
elevasi Layer 3 41.700 41.700 41.700 41.700 41.700 41.700 41.700
jarak m 3.5 10 15 15 15 21
jarak komulatif m 0 3.5 13.5 28.5 43.5 58.5 79.5
beda tinggi m 0.20
Luasan m2 0.000 0.000 0.000 0.000 0.000 2.100 2.100

Layer 4b 12.1 14.200


Potongan H cek
Titik Acuan Elevasi 43 Level 0 14.2
elevasi Layer 4 41.900 41.900 41.900 41.900 41.900 41.900 41.900
elevasi Layer 3 41.700 41.700 41.700 41.700 41.700 41.700 41.700
jarak m 3.8 10 15 15 15 21
jarak komulatif m 0 3.8 13.8 28.8 43.8 58.8 79.8
beda tinggi m 0.00 0.00 0.00 0.20
Luasan m2 0.000 0.000 0.000 0.000 0.000 2.100 2.100
VOLUME LAYER 4b GI 150kV BAYAN

Layer 4b
Potongan I
Titik Acuan Elevasi 43 Level 0
elevasi Layer 4 41.900 41.900 41.900 41.900 41.900 41.900 41.900
elevasi Layer 3 41.700 41.700 41.700 41.700 41.700 41.700 41.700
jarak m 4.1 10 15 15 15 21
jarak komulatif m 0 4.1 14.1 29.1 44.1 59.1 80.1
beda tinggi m 0.20
Luasan m2 0.000 0.000 0.000 0.000 0.000 2.100 2.100

Layer 4b 9.6 11.700


Potongan J cek
Titik Acuan Elevasi 43 Level 0 11.7
elevasi Layer 4 41.900 41.900 41.900 41.900 41.900 41.900 41.900
elevasi Layer 3 41.700 41.700 41.700 41.700 41.700 41.700 41.700
jarak m 4.5 10 15 15 15 21
jarak komulatif m 0 4.5 14.5 29.5 44.5 59.5 80.5
beda tinggi m 0.20
Luasan m2 0.000 0.000 0.000 0.000 0.000 2.100 2.100

Layer 4b 12.1 14.200


Potongan K cek
Titik Acuan Elevasi 43 Level 0 14.2
elevasi Layer 4 41.900 41.900 41.900 41.900 41.900 41.900 41.900
elevasi Layer 3 41.700 41.700 41.700 41.700 41.700 41.700 41.700
jarak m 4.8 10 15 15 15 21
jarak komulatif m 0 4.8 14.8 29.8 44.8 59.8 80.8
beda tinggi m 0.20 0.20 0.20 0.20 0.20 0.20 0.20
Luasan m2 0.960 2.000 3.000 3.000 3.000 4.200 16.160

Layer 4b
Potongan L
Titik Acuan Elevasi 43 Level 0
elevasi Layer 4 41.900 41.900 41.900 41.900 41.900 41.900 41.900
elevasi Layer 3 41.700 41.700 41.700 41.700 41.700 41.700 41.700
jarak m 4.8 10 15 15 15 21
jarak komulatif m 0 4.8 14.8 29.8 44.8 59.8 80.8
beda tinggi m 0.20 0.20 0.20 0.20 0.20 0.20 0.20
Luasan m2 0.960 2.000 3.000 3.000 3.000 4.200 16.160
REKAPITULASI VOLUME LAYER 4b GI 150kV BAYAN

No Potongan Luasan Interval Volume Sat

1 Potongan A 0.000
13.45 - m3
2 Potongan B 0.000
15 15.75 m3
3 Potongan C 2.100
15 31.50 m3
4 Potongan D 2.100
15 31.50 m3
5 Potongan E 2.100
15 31.50 m3
4 Potongan F 2.100
15 31.50 m3
6 Potongan G 2.100
15 31.50 m3
7 Potongan H 2.100
15 31.50 m3
8 Potongan I 2.100
15 31.50 m3
9 Potongan J 2.100
15 136.95 m3
10 Potongan K 16.160
2.85 46.06 m3
11 Potongan L 16.160
m3
Total volume Timbunan Layer 4b 151.3 419.26 m3

DIPERIKSA DIPERIKSA DIAJUKAN OLEH


PT. PLN ( PERSERO) PT. PLN ( PERSERO ) PT. SEJAHTERA MULIA KENCANA
UPK KITRING NUSRA II JMK UMK II

………………………………………..……. …………………………….…… …………………………….……


Pengawas Pengawas Lapangan Sipil Engineer
Grafik Hasil Pengukuran Elevasi Layer 4b
40
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Elevasi Layer 4 Pot C Elevasi Layer 4 Pot D


elevasi Layer 3 elevasi Layer 3
43.000 43.000

42.500 42.500

42.000 42.000

41.500 41.500

41.000
41.000

40.500
40.500

40.000
40.000 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Grafik Hasil Pengukuran Elevasi Layer 4b

Elevasi Layer 4 Pot E Elevasi Layer 4 Pot F


elevasi layer 3 elevasi layer 3
43.000 43.000

42.500 42.500

42.000 42.000

41.500 41.500

41.000 41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
41.000 41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Elevasi Layer 4 Pot G Elevasi Layer 4 Pot H


elevasi layer 3 elevasi layer 3
43.000 43.000

42.500 42.500

42.000 42.000

41.500 41.500

41.000 41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
Grafik Hasil Pengukuran Elevasi Layer 4b

Elevasi Layer 4 Pot I Elevasi Layer 4 Pot J


elevasi layer 3 elevasi layer 3
43.000 43.000

42.500 42.500

42.000 42.000

41.500 41.500

41.000 41.000

40.500 40.500

40.000
40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Elevasi Layer 4 Pot K Elevasi Layer 4 Pot L


elevasi layer 3 elevasi layer 3
43.000 43.000

42.500 42.500

42.000 42.000

41.500 41.500

41.000 41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
VOLUME LAYER 4a GI 150kV BAYAN
Layer 4
Potongan A
Titik Acuan Elevasi 43 Level 0
elevasi Layer 4 41.900 41.900 41.900 41.900 41.900 41.900 41.900
elevasi Layer 3 41.700 41.700 41.700 41.700 41.700 41.700 41.700
jarak m 1 10 15 15 15 21
jarak komulatif m 0 1 11 26 41 56 77
beda tinggi m 0.20 0.20
Luasan m2 0.000 0.000 0.000 0.000 1.500 4.200 5.700

Layer 4
Potongan B
Titik Acuan Elevasi 43 Level 0
elevasi Layer 3 41.900 41.900 41.900 41.900 41.900 41.900 41.900
elevasi Layer 3 41.700 41.700 41.700 41.700 41.700 41.700 41.700
jarak m 1.6 10 15 15 15 21
jarak komulatif m 0 1.6 11.6 26.6 41.6 56.6 77.6
beda tinggi m 0.20 0.20
Luasan m2 0.000 0.000 0.000 0.000 1.500 4.200 5.700

Layer 4
Potongan C
Titik Acuan Elevasi 43 Level 0
elevasi Layer 4 41.900 41.900 41.900 41.900 41.900 41.900
elevasi Layer 3 41.700 41.700 41.700 41.700 41.700 41.700
jarak m 2 10 15 15 15 21
jarak komulatif m 0 2 12 27 42 57 78
beda tinggi m 0.20
Luasan m2 0.000 0.000 0.000 0.000 1.500 2.100 3.600

Layer 4
Potongan D
Titik Acuan Elevasi 43 Level 0
elevasi Layer 4 41.900 41.900 41.900 41.900 41.900 41.900
elevasi Layer 3 41.700 41.700 41.700 41.700 41.700 41.700
jarak m 2.3 10 15 15 15 21
jarak komulatif m 0 2.3 12.3 27.3 42.3 57.3 78.3
beda tinggi m 0.20 0.20 0.20
Luasan m2 0.000 0.000 1.500 3.000 3.000 2.100 9.600
VOLUME LAYER 4a GI 150kV BAYAN

Layer 4
Potongan E
Titik Acuan Elevasi 43 Level 0
elevasi Layer 4 41.900 41.900 41.900 41.900 41.900 41.900
elevasi Layer 3 41.700 41.700 41.700 41.700 41.700 41.700
jarak m 2.6 10 15 15 15 21
jarak komulatif m 0 2.6 12.6 27.6 42.6 57.6 78.6
beda tinggi m 0.20 0.20 0.20
Luasan m2 0.000 0.000 1.500 3.000 3.000 2.100 9.600

Layer 4
Potongan F
Titik Acuan Elevasi 43 Level 0
elevasi Layer 4 41.900 41.900 41.900 41.900 41.900 41.900
elevasi Layer 3 41.700 41.700 41.700 41.700 41.700 41.700
jarak m 3 10 15 15 15 21
jarak komulatif m 0 3 13 28 43 58 79
beda tinggi m 0.20 0.20 0.20
Luasan m2 0.000 0.000 1.500 3.000 3.000 2.100 9.600

Layer 4
Potongan G
Titik Acuan Elevasi 43 Level 0
elevasi Layer 4 41.900 41.900 41.900 41.900 41.900 41.900
elevasi Layer 3 41.700 41.700 41.700 41.700 41.700 41.700
jarak m 3.5 10 15 15 15 21
jarak komulatif m 0 3.5 13.5 28.5 43.5 58.5 79.5
beda tinggi m 0.20 0.20 0.20 0.20
Luasan m2 0.000 1.000 3.000 3.000 3.000 2.100 12.100

Layer 4
Potongan H
Titik Acuan Elevasi 43 Level 0
elevasi Layer 4 41.900 41.900 41.900 41.900 41.900 41.900
elevasi Layer 3 41.700 41.700 41.700 41.700 41.700 41.700
jarak m 3.8 10 15 15 15 21
jarak komulatif m 0 3.8 13.8 28.8 43.8 58.8 79.8
beda tinggi m 0.20 0.20 0.20
Luasan m2 0.000 0.000 1.500 3.000 3.000 2.100 9.600
VOLUME LAYER 4a GI 150kV BAYAN

Layer 4
Potongan I
Titik Acuan Elevasi 43 Level 0
elevasi Layer 4 41.900 41.900 41.900 41.900 41.900 41.900
elevasi Layer 3 41.700 41.700 41.700 41.700 41.700 41.700
jarak m 4.1 10 15 15 15 21
jarak komulatif m 0 4.1 14.1 29.1 44.1 59.1 80.1
beda tinggi m 0.20 0.20 0.20
Luasan m2 0.000 0.000 1.500 3.000 3.000 2.100 9.600

Layer 4
Potongan J
Titik Acuan Elevasi 43 Level 0
elevasi Layer 4 41.900 41.900 41.900 41.900 41.900 41.900
elevasi Layer 3 41.700 41.700 41.700 41.700 41.700 41.700
jarak m 4.5 10 15 15 15 21
jarak komulatif m 0 4.5 14.5 29.5 44.5 59.5 80.5
beda tinggi m 0.20 0.20 0.20 0.20
Luasan m2 0.000 1.000 3.000 3.000 3.000 2.100 12.100
REKAPITULASI VOLUME LAYER 4a GI 150kV BAYAN

No Potongan Luasan Interval Volume Sat

1 Potongan A 5.700
13.45 76.66 m3
2 Potongan B 5.700
15 69.75 m3
3 Potongan C 3.600
15 99.00 m3
4 Potongan D 9.600
15 144.00 m3
5 Potongan E 9.600
15 144.00 m3
4 Potongan F 9.600
15 162.75 m3
6 Potongan G 12.100
15 162.75 m3
7 Potongan H 9.600
15 144.00 m3
8 Potongan I 9.600
15 162.75 m3
9 Potongan J 12.100
15 90.75 m3
10 Potongan K 0.000
2.85 - m3
11 Potongan L 0.000
m3
Total volume Timbunan Layer 4a 151.3 1,256.41 m3

DIPERIKSA DIPERIKSA DIAJUKAN OLEH


PT. PLN ( PERSERO) PT. PLN ( PERSERO ) PT. SEJAHTERA MULIA KENCANA
UPK KITRING NUSRA II JMK UMK II

………………………………………..……. …………………………….…… …………………………….……


Pengawas Pengawas Lapangan Sipil Engineer
Grafik Hasil Pengukuran Elevasi Layer 3a

Elevasi layer 1 Pot A Elevasi layer 1 Pot B


elevasi Layer 3 elevasi Layer 3
43.000 43.000

42.500 42.500

42.000 42.000

41.500 41.500

41.000 41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Elevasi Layer 1 Pot C Elevasi Layer1 Pot D


elevasi Layer 3 elevasi Layer 3
43.000 43.000

42.500 42.500

42.000 42.000

41.500
41.500

41.000
41.000

40.500
40.500

40.000
40.000 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
Grafik Hasil Pengukuran Elevasi Layer 3a

Elevasi Layer 1 Pot E Elevasi Layer 1 Pot F


Elevasi Setelah Striping Elevasi Setelah Striping
43.000 43.000

42.500 42.500

42.000 42.000

41.500 41.500

41.000 41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Elevasi Layer 1 Pot G Elevasi Layer 1 Pot H


Elevasi Setelah Striping Elevasi Setelah Striping
43.000 43.000

42.500 42.500

42.000 42.000

41.500 41.500

41.000 41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
41.000 41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
Grafik Hasil Pengukuran Elevasi Layer 3a

Elevasi Layer 1 Pot I Elevasi Layer 1 Pot J


Elevasi Setelah Striping Elevasi Setelah Striping
43.000 43.000

42.500 42.500

42.000 42.000

41.500 41.500

41.000 41.000

40.500 40.500

40.000
40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Elevasi Layer 1 Pot K


Elevasi Setelah Striping Elevasi Layer 1 Pot L
43 43 Elevasi Setelah Striping

42.5 42.5

42 42

41.5 41.5

41 41

40.5 40.5

40 40
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
41

40.5 40.5

40 40
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
K, L Blm Diurug
VOLUME LAYER 3b GI 150kV BAYAN
Layer 3b
Potongan C
Titik Acuan Elevasi 43 Level 0
elevasi Layer 3b 41.700 41.700 41.700 41.700 41.700 41.700 41.700
elevasi Layer 2 a 41.400 41.400 41.400 41.400 41.400 41.400 41.400
jarak m 2 10 15 15 15 21
jarak komulatif m 0 2 12 27 42 57 78
beda tinggi m 0.30
Luasan m2 0.000 0.000 0.000 0.000 0.000 3.150 3.150

Layer 3b 5.4 8.550


Potongan D cek
Titik Acuan Elevasi 43 Level 0 8.55
elevasi Layer 3b 41.700 41.700 41.700 41.700 41.700 41.700 41.700
elevasi Layer 2 a 41.400 41.400 41.400 41.400 41.400 41.400 41.400
jarak m 2.3 10 15 15 15 21
jarak komulatif m 0 2.3 12.3 27.3 42.3 57.3 78.3
beda tinggi m 0.30
Luasan m2 0.000 0.000 0.000 0.000 0.000 3.150 3.150

14.400 17.550

VOLUME LAYER 3b GI 150kV BAYAN

Layer 3b
Potongan E
Titik Acuan Elevasi 43 Level 0
elevasi Layer 3b 41.700 41.700 41.700 41.700 41.700 41.700 41.700
elevasi Layer 2 a 41.400 41.400 41.400 41.400 41.400 41.400 41.400
jarak m 2.6 10 15 15 15 21
jarak komulatif m 0 2.6 12.6 27.6 42.6 57.6 78.6
beda tinggi m 0.30
Luasan m2 0.000 0.000 0.000 0.000 0.000 3.150 3.150

14.400 17.550
Layer 3b cek
Potongan F 17.55
Titik Acuan Elevasi 43 Level 0
elevasi Layer 3b 41.700 41.700 41.700 41.700 41.700 41.700
elevasi Layer 2 a 41.400 41.400 41.400 41.400 41.400 41.400
jarak m 3 10 15 15 15 21
jarak komulatif m 0 3 13 28 43 58 79
beda tinggi m 0.30
Luasan m2 0.000 0.000 0.000 0.000 0.000 3.150 3.150

Layer 3b 14.400 17.550


Potongan G cek
Titik Acuan Elevasi 43 Level 0 17.55
elevasi Layer 3b 41.700 41.700 41.700 41.700 41.700 41.700 41.700
elevasi Layer 2 a 41.400 41.400 41.400 41.400 41.400 41.400 41.400
jarak m 3.5 10 15 15 15 21
jarak komulatif m 0 3.5 13.5 28.5 43.5 58.5 79.5
beda tinggi m 0.30
Luasan m2 0.000 0.000 0.000 0.000 0.000 3.150 3.150

Layer 3b 18.15 21.300


Potongan H cek
Titik Acuan Elevasi 43 Level 0 21.300
elevasi Layer 3b 41.700 41.700 41.700 41.700 41.700 41.700 41.700
elevasi Layer 2 a 41.400 41.400 41.400 41.400 41.400 41.400 41.400
jarak m 3.8 10 15 15 15 21
jarak komulatif m 0 3.8 13.8 28.8 43.8 58.8 79.8
beda tinggi m 0.30
Luasan m2 0.000 0.000 0.000 0.000 0.000 3.150 3.150

14.4 17.550
cek
17.55
VOLUME LAYER 3b GI 150kV BAYAN

Layer 3b
Potongan I
Titik Acuan Elevasi 43 Level 0
elevasi Layer 3b 41.700 41.700 41.700 41.700 41.700 41.700 41.700
elevasi Layer 2 a 41.400 41.400 41.400 41.400 41.400 41.400 41.400
jarak m 4.1 10 15 15 15 21
jarak komulatif m 0 4.1 14.1 29.1 44.1 59.1 80.1
beda tinggi m 0.30
Luasan m2 0.000 0.000 0.000 0.000 0.000 3.150 3.150

Layer 3b 14.4 17.550


Potongan J cek
Titik Acuan Elevasi 43 Level 0 17.55
elevasi Layer 3b 41.700 41.700 41.700 41.700 41.700 41.700 41.700
elevasi Layer 2 a 41.400 41.400 41.400 41.400 41.400 41.400 41.400
jarak m 4.5 10 15 15 15 21
jarak komulatif m 0 4.5 14.5 29.5 44.5 59.5 80.5
beda tinggi m 0.30
Luasan m2 0.000 0.000 0.000 0.000 0.000 3.150 3.150

Layer 3b 18.15 21.300


Potongan K cek
Titik Acuan Elevasi 43 Level 0 21.3
elevasi Layer 3b 41.700 41.700 41.700 41.700 41.700 41.700 41.700
elevasi Layer 2 a 41.400 41.400 41.400 41.400 41.400 41.400 41.400
jarak m 4.8 10 15 15 15 21
jarak komulatif m 0 4.8 14.8 29.8 44.8 59.8 80.8
beda tinggi m 0.30 0.30 0.30 0.30 0.30 0.30 0.30
Luasan m2 1.440 3.000 4.500 4.500 4.500 6.300 24.240

Layer 3b
Potongan L
Titik Acuan Elevasi 43 Level 0
elevasi Layer 3b 41.700 41.700 41.700 41.700 41.700 41.700 41.700
elevasi Layer 2 a 41.400 41.400 41.400 41.400 41.400 41.400 41.400
jarak m 4.8 10 15 15 15 21
jarak komulatif m 0 4.8 14.8 29.8 44.8 59.8 80.8
beda tinggi m 0.30 0.30 0.30 0.30 0.30 0.30 0.30
Luasan m2 1.440 3.000 4.500 4.500 4.500 6.300 24.240
REKAPITULASI VOLUME LAYER 3b GI 150kV BAYAN

No Potongan Luasan Interval Volume Sat

1 Potongan A 0.000
13.45 - m3
2 Potongan B 0.000
15 23.63 m3
3 Potongan C 3.150
15 47.25 m3
4 Potongan D 3.150
15 47.25 m3
5 Potongan E 3.150
15 47.25 m3
4 Potongan F 3.150
15 47.25 m3
6 Potongan G 3.150
15 47.25 m3
7 Potongan H 3.150
15 47.25 m3
8 Potongan I 3.150
15 47.25 m3
9 Potongan J 3.150
15 205.43 m3
10 Potongan K 24.240
2.85 69.08 m3
11 Potongan L 24.240
m3
Total volume Timbunan Layer 3b 151.3 628.88 m3

DIPERIKSA DIPERIKSA DIAJUKAN OLEH


PT. PLN ( PERSERO) PT. PLN ( PERSERO ) PT. SEJAHTERA MULIA KENCANA
UPK KITRING NUSRA II JMK UMK II

………………………………………..……. …………………………….…… …………………………….……


Pengawas Pengawas Lapangan Sipil Engineer
Grafik Hasil Pengukuran Elevasi Layer 3
0
4 0 5 1 0 1 5 0
2 E v
e
l5
2 s
a l
i0
3 e
y
a 1
r3 P
5 t
o4 B
0 5
4 0
5 5 6 0 6 5 0
7 5
7 8 0 8 5

Elevasi Layer 1 Pot C Elevasi Layer1 Pot D


elevasi Layer 2 a elevasi Layer 2 a
43.000 43.000

42.500 42.500

42.000 42.000

41.500 41.500

41.000
41.000

40.500
40.500

40.000
40.000 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Grafik Hasil Pengukuran Elevasi Layer 3

Elevasi Layer 1 Pot E Elevasi Layer 1 Pot F


Elevasi Setelah Striping Elevasi Setelah Striping
43.000 43.000

42.500 42.500

42.000 42.000

41.500 41.500

41.000 41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
41.000 41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Elevasi Layer 1 Pot G Elevasi Layer 1 Pot H


Elevasi Setelah Striping Elevasi Setelah Striping
43.000 43.000

42.500 42.500

42.000 42.000

41.500 41.500

41.000 41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
Grafik Hasil Pengukuran Elevasi Layer 3

Elevasi Layer 1 Pot I Elevasi Layer 1 Pot J


Elevasi Setelah Striping Elevasi Setelah Striping
43.000 43.000

42.500 42.500

42.000 42.000

41.500 41.500

41.000 41.000

40.500 40.500

40.000
40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Elevasi Layer 1 Pot K


Elevasi Setelah Striping Elevasi Layer 1 Pot L
43.000 43.000 Elevasi Setelah Striping

42.500 42.500

42.000 42.000

41.500 41.500

41.000 41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
K, L Blm Diurug
VOLUME LAYER 3a GI 150kV BAYAN
Layer 3
Potongan A
Titik Acuan Elevasi 43 Level 0
elevasi Layer 3 41.700 41.700 41.700 41.700 41.700 41.700 41.700
elevasi Layer 2 a 41.400 41.400 41.400 41.400 41.400 41.400 41.400
jarak m 1 10 15 15 15 21
jarak komulatif m 0 1 11 26 41 56 77
beda tinggi m 0.30 0.30
Luasan m2 0.000 0.000 0.000 0.000 2.250 6.300 8.550

Layer 3
Potongan B
Titik Acuan Elevasi 43 Level 0
elevasi Layer 3 41.700 41.700 41.700 41.700 41.700 41.700 41.700
elevasi Layer 2 a 41.400 41.400 41.400 41.400 41.400 41.400 41.400
jarak m 1.6 10 15 15 15 21
jarak komulatif m 0 1.6 11.6 26.6 41.6 56.6 77.6
beda tinggi m 0.30 0.30
Luasan m2 0.000 0.000 0.000 0.000 2.250 6.300 8.550

Layer 3
Potongan C
Titik Acuan Elevasi 43 Level 0
elevasi Layer 3 41.700 41.700 41.700 41.700 41.700 41.700
elevasi Layer 2 a 41.400 41.400 41.400 41.400 41.400 41.400
jarak m 2 10 15 15 15 21
jarak komulatif m 0 2 12 27 42 57 78
beda tinggi m 0.30
Luasan m2 0.000 0.000 0.000 0.000 2.250 3.150 5.400

Layer 3
Potongan D
Titik Acuan Elevasi 43 Level 0
elevasi Layer 3 41.700 41.700 41.700 41.700 41.700 41.700
elevasi Layer 2 a 41.400 41.400 41.400 41.400 41.400 41.400
jarak m 2.3 10 15 15 15 21
jarak komulatif m 0 2.3 12.3 27.3 42.3 57.3 78.3
beda tinggi m 0.30 0.30 0.30
Luasan m2 0.000 0.000 2.250 4.500 4.500 3.150 14.400
VOLUME LAYER 3a GI 150kV BAYAN

Layer 3
Potongan E
Titik Acuan Elevasi 43 Level 0
elevasi Layer 3 41.700 41.700 41.700 41.700 41.700 41.700
elevasi Layer 2 a 41.400 41.400 41.400 41.400 41.400 41.400
jarak m 2.6 10 15 15 15 21
jarak komulatif m 0 2.6 12.6 27.6 42.6 57.6 78.6
beda tinggi m 0.30 0.30 0.30
Luasan m2 0.000 0.000 2.250 4.500 4.500 3.150 14.400

Layer 3
Potongan F
Titik Acuan Elevasi 43 Level 0
elevasi Layer 3 41.700 41.700 41.700 41.700 41.700 41.700
elevasi Layer 2 a 41.400 41.400 41.400 41.400 41.400 41.400
jarak m 3 10 15 15 15 21
jarak komulatif m 0 3 13 28 43 58 79
beda tinggi m 0.30 0.30 0.30
Luasan m2 0.000 0.000 2.250 4.500 4.500 3.150 14.400

Layer 3
Potongan G
Titik Acuan Elevasi 43 Level 0
elevasi Layer 3 41.700 41.700 41.700 41.700 41.700 41.700
elevasi Layer 2 a 41.400 41.400 41.400 41.400 41.400 41.400
jarak m 3.5 10 15 15 15 21
jarak komulatif m 0 3.5 13.5 28.5 43.5 58.5 79.5
beda tinggi m 0.30 0.30 0.30 0.30
Luasan m2 0.000 1.500 4.500 4.500 4.500 3.150 18.150

Layer 3
Potongan H
Titik Acuan Elevasi 43 Level 0
elevasi Layer 3 41.700 41.700 41.700 41.700 41.700 41.700
elevasi Layer 2 a 41.400 41.400 41.400 41.400 41.400 41.400
jarak m 3.8 10 15 15 15 21
jarak komulatif m 0 3.8 13.8 28.8 43.8 58.8 79.8
beda tinggi m 0.30 0.30 0.30
Luasan m2 0.000 0.000 2.250 4.500 4.500 3.150 14.400
VOLUME LAYER 3a GI 150kV BAYAN

Layer 3
Potongan I
Titik Acuan Elevasi 43 Level 0
elevasi Layer 3 41.700 41.700 41.700 41.700 41.700 41.700
elevasi Layer 2 a 41.400 41.400 41.400 41.400 41.400 41.400
jarak m 4.1 10 15 15 15 21
jarak komulatif m 0 4.1 14.1 29.1 44.1 59.1 80.1
beda tinggi m 0.30 0.30 0.30
Luasan m2 0.000 0.000 2.250 4.500 4.500 3.150 14.400

Layer 3
Potongan J
Titik Acuan Elevasi 43 Level 0
elevasi Layer 3 41.700 41.700 41.700 41.700 41.700 41.700
elevasi Layer 2 a 41.400 41.400 41.400 41.400 41.400 41.400
jarak m 4.5 10 15 15 15 21
jarak komulatif m 0 4.5 14.5 29.5 44.5 59.5 80.5
beda tinggi m 0.30 0.30 0.30 0.30
Luasan m2 0.000 1.500 4.500 4.500 4.500 3.150 18.150
REKAPITULASI VOLUME LAYER 3a GI 150kV BAYAN

No Potongan Luasan Interval Volume Sat

1 Potongan A 8.550
13.45 115.00 m3
2 Potongan B 8.550
15 104.63 m3
3 Potongan C 5.400
15 148.50 m3
4 Potongan D 14.400
15 216.00 m3
5 Potongan E 14.400
15 216.00 m3
4 Potongan F 14.400
15 244.13 m3
6 Potongan G 18.150
15 244.13 m3
7 Potongan H 14.400
15 216.00 m3
8 Potongan I 14.400
15 244.13 m3
9 Potongan J 18.150
15 136.13 m3
10 Potongan K 0.000
2.85 - m3
11 Potongan L 0.000
m3
Total volume Timbunan Layer 3a 151.3 1,884.62 m3

DIPERIKSA DIPERIKSA DIAJUKAN OLEH


PT. PLN ( PERSERO) PT. PLN ( PERSERO ) PT. SEJAHTERA MULIA KENCANA
UPK KITRING NUSRA II JMK UMK II

………………………………………..……. …………………………….…… …………………………….……


Pengawas Pengawas Lapangan Sipil Engineer
Grafik Hasil Pengukuran Elevasi Layer 3a

Elevasi layer 1 Pot A Elevasi layer 1 Pot B


elevasi Layer 2 a elevasi Layer 2 a
43.000 43.000

42.500 42.500

42.000 42.000

41.500 41.500

41.000 41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Elevasi Layer 1 Pot C Elevasi Layer1 Pot D


elevasi Layer 2 a elevasi Layer 2 a
43.000 43.000

42.500 42.500

42.000 42.000

41.500
41.500

41.000
41.000

40.500
40.500

40.000
40.000 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
Grafik Hasil Pengukuran Elevasi Layer 3a

Elevasi Layer 1 Pot E Elevasi Layer 1 Pot F


Elevasi Setelah Striping Elevasi Setelah Striping
43.000 43.000

42.500 42.500

42.000 42.000

41.500 41.500

41.000 41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Elevasi Layer 1 Pot G Elevasi Layer 1 Pot H


Elevasi Setelah Striping Elevasi Setelah Striping
43.000 43.000

42.500 42.500

42.000 42.000

41.500 41.500

41.000 41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
41.000 41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
Grafik Hasil Pengukuran Elevasi Layer 3a

Elevasi Layer 1 Pot I Elevasi Layer 1 Pot J


Elevasi Setelah Striping Elevasi Setelah Striping
43.000 43.000

42.500 42.500

42.000 42.000

41.500 41.500

41.000 41.000

40.500 40.500

40.000
40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Elevasi Layer 1 Pot K


Elevasi Setelah Striping Elevasi Layer 1 Pot L
43 43 Elevasi Setelah Striping

42.5 42.5

42 42

41.5 41.5

41 41

40.5 40.5

40 40
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
41

40.5 40.5

40 40
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
K, L Blm Diurug
VOLUME LAYER 2b GI 150kV BAYAN
Layer 2b
Potongan A
Titik Acuan Elevasi 43 Level 0
elevasi Layer 2b 41.400 41.400 41.400 41.400 41.400 41.400 41.400
elevasi Layer 1a 41.100 41.100 41.100 41.100 41.100 41.100 41.100
jarak m 1 10 15 15 15 21
jarak komulatif m 0 1 11 26 41 56 77
beda tinggi m 0.30 0.30
Luasan m2 0.000 0.000 0.000 0.000 2.250 6.300 8.550

Layer 2b 0 8.550
Potongan B Cek
Titik Acuan Elevasi 43 Level 0 6.553
elevasi Layer 2b 41.400 41.400 41.400 41.400 41.400 41.400 41.400
elevasi Layer 1a 41.100 41.100 41.100 41.100 41.100 41.100 41.100
jarak m 1.6 10 15 15 15 21
jarak komulatif m 0 1.6 11.6 26.6 41.6 56.6 77.6
beda tinggi m 0.30
Luasan m2 0.000 0.000 0.000 0.000 0.000 3.150 3.150

Layer 2b 5.4 8.550


Potongan C Cek
Titik Acuan Elevasi 43 Level 0 8.55
elevasi Layer 2b 41.400 41.400 41.400 41.400 41.400 41.400 41.400
elevasi Layer 1a 41.100 41.100 41.100 41.100 41.100 41.100 41.100
jarak m 2 10 15 15 15 21
jarak komulatif m 0 2 12 27 42 57 78
beda tinggi m 0.30
Luasan m2 0.000 0.000 0.000 0.000 0.000 3.150 3.150

Layer 2b 5.4 8.550


Potongan D Cek
Titik Acuan Elevasi 43 Level 0 8.55
elevasi Layer 2b 41.400 41.400 41.400 41.400 41.400 41.400 41.400
elevasi Layer 1a 41.100 41.100 41.100 41.100 41.100 41.100 41.100
jarak m 2.3 10 15 15 15 21
jarak komulatif m 0 2.3 12.3 27.3 42.3 57.3 78.3
beda tinggi m 0.30
Luasan m2 0.000 0.000 0.000 0.000 0.000 3.150 3.150

14.400 17.550
Cek
17.550
VOLUME LAYER 2b GI 150kV BAYAN

Layer 2b
Potongan E
Titik Acuan Elevasi 43 Level 0
elevasi Layer 2b 41.400 41.400 41.400 41.400 41.400 41.400 41.400
elevasi Layer 1a 41.100 41.100 41.100 41.100 41.100 41.100 41.100
jarak m 2.6 10 15 15 15 21
jarak komulatif m 0 2.6 12.6 27.6 42.6 57.6 78.6
beda tinggi m 0.30
Luasan m2 0.000 0.000 0.000 0.000 0.000 3.150 3.150

14.400 17.550
Layer 2b Cek
Potongan F 17.55
Titik Acuan Elevasi 43 Level 0
elevasi Layer 2b 41.400 41.400 41.400 41.400 41.400 41.400 41.400
elevasi Layer 1a 41.100 41.100 41.100 41.100 41.100 41.100
jarak m 3 10 15 15 15 21
jarak komulatif m 0 3 13 28 43 58 79
beda tinggi m 0.30
Luasan m2 0.000 0.000 0.000 0.000 0.000 3.150 3.150

Layer 2b 14.400 17.550


Potongan G Cek
Titik Acuan Elevasi 43 Level 0 17.55
elevasi Layer 2b 41.400 41.400 41.400 41.400 41.400 41.400 41.400
elevasi Layer 1a 41.100 41.100 41.100 41.100 41.100 41.100 41.100
jarak m 3.5 10 15 15 15 21
jarak komulatif m 0 3.5 13.5 28.5 43.5 58.5 79.5
beda tinggi m 0.30
Luasan m2 0.000 0.000 0.000 0.000 0.000 3.150 3.150

Layer 2b 18.15 21.300


Potongan H Cek
Titik Acuan Elevasi 43 Level 0 21.3
elevasi Layer 2b 41.400 41.400 41.400 41.400 41.400 41.400 41.400
elevasi Layer 1a 41.100 41.100 41.100 41.100 41.100 41.100 41.100
jarak m 3.8 10 15 15 15 21
jarak komulatif m 0 3.8 13.8 28.8 43.8 58.8 79.8
beda tinggi m 0.30
Luasan m2 0.000 0.000 0.000 0.000 0.000 3.150 3.150

14.4 17.550
Cek
17.55
VOLUME LAYER 2b GI 150kV BAYAN

Layer 2b
Potongan I
Titik Acuan Elevasi 43 Level 0
elevasi Layer 2b 41.400 41.400 41.400 41.400 41.400 41.400 41.400
elevasi Layer 1a 41.100 41.100 41.100 41.100 41.100 41.100 41.100
jarak m 4.1 10 15 15 15 21
jarak komulatif m 0 4.1 14.1 29.1 44.1 59.1 80.1
beda tinggi m 0.30
Luasan m2 0.000 0.000 0.000 0.000 0.000 3.150 3.150

Layer 2b 14.4 17.550


Potongan J Cek
Titik Acuan Elevasi 43 Level 0 17.55
elevasi Layer 2b 41.400 41.400 41.400 41.400 41.400 41.400 41.400
elevasi Layer 1a 41.100 41.100 41.100 41.100 41.100 41.100 41.100
jarak m 4.5 10 15 15 15 21
jarak komulatif m 0 4.5 14.5 29.5 44.5 59.5 80.5
beda tinggi m 0.30
Luasan m2 0.000 0.000 0.000 0.000 0.000 3.150 3.150

Layer 2b 18.15 21.300


Potongan K Cek
Titik Acuan Elevasi 43 Level 0 21.3
elevasi Layer 2b 41.400 41.400 41.400 41.400 41.400 41.400 41.400
elevasi Layer 1a 41.100 41.100 41.100 41.100 41.100 41.100 41.100
jarak m 4.8 10 15 15 15 21
jarak komulatif m 0 4.8 14.8 29.8 44.8 59.8 80.8
beda tinggi m 0.30 0.30 0.30 0.30 0.30 0.30 0.30
Luasan m2 1.440 3.000 4.500 4.500 4.500 6.300 24.240

Layer 2b 0 24.240
Potongan L Cek
Titik Acuan Elevasi 43 Level 0 0
elevasi Layer 2b 41.400 41.400 41.400 41.400 41.400 41.400 41.400
elevasi Layer 1a 41.100 41.100 41.100 41.100 41.100 41.100 41.100
jarak m 4.8 10 15 15 15 21
jarak komulatif m 0 4.8 14.8 29.8 44.8 59.8 80.8
beda tinggi m 0.30 0.30 0.30 0.30 0.30 0.30 0.30
Luasan m2 1.440 3.000 4.500 4.500 4.500 6.300 24.240

0 24.240
Cek
0
REKAPITULASI VOLUME LAYER 2b GI 150kV BAYAN

No Potongan Luasan Interval Volume Sat

1 Potongan A 8.550
13.45 78.68 m3
2 Potongan B 3.150
15 47.25 m3
3 Potongan C 3.150
15 47.25 m3
4 Potongan D 3.150
15 47.25 m3
5 Potongan E 3.150
15 47.25 m3
4 Potongan F 3.150
15 47.25 m3
6 Potongan G 3.150
15 47.25 m3
7 Potongan H 3.150
15 47.25 m3
8 Potongan I 3.150
15 47.25 m3
9 Potongan J 3.150
15 205.42 m3
10 Potongan K 24.240
2.85 69.08 m3
11 Potongan L 24.240
m3
Total volume Timbunan Layer 2b 151.3 731.19 m3

DIPERIKSA DIPERIKSA DIAJUKAN OLEH


PT. PLN ( PERSERO) PT. PLN ( PERSERO ) PT. SEJAHTERA MULIA KENCANA
UPK KITRING NUSRA II JMK UMK II

………………………………………..……. …………………………….…… …………………………….……


Pengawas Pengawas Lapangan Sipil Engineer
Grafik Hasil Pengukuran Elevasi Layer 2

Elevasi layer 1 Pot A Elevasi layer 1 Pot B


elevasi Layer 1a elevasi Layer 1a
43.000 43.000

42.500 42.500

42.000 42.000

41.500 41.500

41.000 41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Elevasi Layer 1 Pot C Elevasi Layer1 Pot D


elevasi Layer 1a elevasi Layer 1a
43.000 43.000

42.500 42.500

42.000 42.000

41.500
41.500

41.000
41.000

40.500
40.500

40.000
40.000 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
Grafik Hasil Pengukuran Elevasi Layer 2

Elevasi Layer 1 Pot E Elevasi Layer 1 Pot F


Elevasi Setelah Striping Elevasi Setelah Striping
43.000 43.000

42.500 42.500

42.000 42.000

41.500 41.500

41.000 41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Elevasi Layer 1 Pot G Elevasi Layer 1 Pot H


Elevasi Setelah Striping Elevasi Setelah Striping
43.000 43.000

42.500 42.500

42.000 42.000

41.500 41.500

41.000 41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
41.000 41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
Grafik Hasil Pengukuran Elevasi Layer 2

Elevasi Layer 1 Pot I Elevasi Layer 1 Pot J


Elevasi Setelah Striping Elevasi Setelah Striping
43.000 43.000

42.500 42.500

42.000 42.000

41.500 41.500

41.000 41.000

40.500 40.500

40.000
40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Elevasi Layer 1 Pot K


Elevasi Setelah Striping Elevasi Layer 1 Pot L
43.000 43.000 Elevasi Setelah Striping

42.500 42.500

42.000 42.000

41.500 41.500

41.000 41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
A, K, L Blm Diurug
VOLUME LAYER 2a GI 150kV BAYAN
Layer 2a
Potongan A
Titik Acuan Elevasi 43 Level 0
elevasi Layer 2a 41.400 41.400 41.400 41.400 41.400 41.400
elevasi Layer 1a 41.100 41.100 41.100 41.100 41.100 41.100
jarak m 1 10 15 15 15 21
jarak komulatif m 0 1 11 26 41 56 77
beda tinggi m
Luasan m2 0.000 0.000 0.000 0.000 0.000 0.000 0.000

Layer 2a
Potongan B
Titik Acuan Elevasi 43 Level 0
elevasi Layer 2a 41.400 41.400 41.400 41.400 41.400 41.400
elevasi Layer 1a 41.100 41.100 41.100 41.100 41.100 41.100
jarak m 1.6 10 15 15 15 21
jarak komulatif m 0 1.6 11.6 26.6 41.6 56.6 77.6
beda tinggi m 0.30
Luasan m2 0.000 0.000 0.000 0.000 2.250 3.150 5.400

Layer 2a
Potongan C
Titik Acuan Elevasi 43 Level 0
elevasi Layer 2a 41.400 41.400 41.400 41.400 41.400 41.400
elevasi Layer 1a 41.100 41.100 41.100 41.100 41.100 41.100
jarak m 2 10 15 15 15 21
jarak komulatif m 0 2 12 27 42 57 78
beda tinggi m 0.30
Luasan m2 0.000 0.000 0.000 0.000 2.250 3.150 5.400

Layer 2a
Potongan D
Titik Acuan Elevasi 43 Level 0
elevasi Layer 2a 41.400 41.400 41.400 41.400 41.400 41.400
elevasi Layer 1a 41.100 41.100 41.100 41.100 41.100 41.100
jarak m 2.3 10 15 15 15 21
jarak komulatif m 0 2.3 12.3 27.3 42.3 57.3 78.3
beda tinggi m 0.30 0.30 0.30
Luasan m2 0.000 0.000 2.250 4.500 4.500 3.150 14.400
VOLUME LAYER 2a GI 150kV BAYAN

Layer 2a
Potongan E
Titik Acuan Elevasi 43 Level 0
elevasi Layer 2a 41.400 41.400 41.400 41.400 41.400 41.400
elevasi Layer 1a 41.100 41.100 41.100 41.100 41.100 41.100
jarak m 2.6 10 15 15 15 21
jarak komulatif m 0 2.6 12.6 27.6 42.6 57.6 78.6
beda tinggi m 0.30 0.30 0.30
Luasan m2 0.000 0.000 2.250 4.500 4.500 3.150 14.400

Layer 2a
Potongan F
Titik Acuan Elevasi 43 Level 0
elevasi Layer 2a 41.400 41.400 41.400 41.400 41.400 41.400
elevasi Layer 1a 41.100 41.100 41.100 41.100 41.100 41.100
jarak m 3 10 15 15 15 21
jarak komulatif m 0 3 13 28 43 58 79
beda tinggi m 0.30 0.30 0.30
Luasan m2 0.000 0.000 2.250 4.500 4.500 3.150 14.400

Layer 2a
Potongan G
Titik Acuan Elevasi 43 Level 0
elevasi Layer 2a 41.400 41.400 41.400 41.400 41.400 41.400
elevasi Layer 1a 41.100 41.100 41.100 41.100 41.100 41.100
jarak m 3.5 10 15 15 15 21
jarak komulatif m 0 3.5 13.5 28.5 43.5 58.5 79.5
beda tinggi m 0.30 0.30 0.30 0.30
Luasan m2 0.000 1.500 4.500 4.500 4.500 3.150 18.150

Layer 2a
Potongan H
Titik Acuan Elevasi 43 Level 0
elevasi Layer 2a 41.400 41.400 41.400 41.400 41.400 41.400
elevasi Layer 1a 41.100 41.100 41.100 41.100 41.100 41.100
jarak m 3.8 10 15 15 15 21
jarak komulatif m 0 3.8 13.8 28.8 43.8 58.8 79.8
beda tinggi m 0.30 0.30 0.30
Luasan m2 0.000 0.000 2.250 4.500 4.500 3.150 14.400
VOLUME LAYER 2a GI 150kV BAYAN

Layer 2a
Potongan I
Titik Acuan Elevasi 43 Level 0
elevasi Layer 2a 41.400 41.400 41.400 41.400 41.400 41.400
elevasi Layer 1a 41.100 41.100 41.100 41.100 41.100 41.100
jarak m 4.1 10 15 15 15 21
jarak komulatif m 0 4.1 14.1 29.1 44.1 59.1 80.1
beda tinggi m 0.30 0.30 0.30
Luasan m2 0.000 0.000 2.250 4.500 4.500 3.150 14.400

Layer 2a
Potongan J
Titik Acuan Elevasi 43 Level 0
elevasi Layer 2a 41.400 41.400 41.400 41.400 41.400 41.400
elevasi Layer 1a 41.100 41.100 41.100 41.100 41.100 41.100
jarak m 4.5 10 15 15 15 21
jarak komulatif m 0 4.5 14.5 29.5 44.5 59.5 80.5
beda tinggi m 0.30 0.30 0.30 0.30
Luasan m2 0.000 1.500 4.500 4.500 4.500 3.150 18.150
REKAPITULASI VOLUME LAYER 2a GI 150kV BAYAN

No Potongan Luasan Interval Volume Sat

1 Potongan A 0.000
13.45 36.31 m3
2 Potongan B 5.400
15 81.00 m3
3 Potongan C 5.400
15 148.50 m3
4 Potongan D 14.400
15 216.00 m3
5 Potongan E 14.400
15 216.00 m3
4 Potongan F 14.400
15 244.12 m3
6 Potongan G 18.150
15 244.12 m3
7 Potongan H 14.400
15 216.00 m3
8 Potongan I 14.400
15 244.12 m3
9 Potongan J 18.150
15 136.12 m3
10 Potongan K 0.000
2.85 - m3
11 Potongan L 0.000
m3
Total volume Timbunan Layer 2 a 151.3 1,782.31 m3

DIPERIKSA DIPERIKSA DIAJUKAN OLEH


PT. PLN ( PERSERO) PT. PLN ( PERSERO ) PT. SEJAHTERA MULIA KENCANA
UPK KITRING NUSRA II JMK UMK II

………………………………………..……. …………………………….…… …………………………….……


Pengawas Pengawas Lapangan Sipil Engineer
Grafik Hasil Pengukuran Elevasi Layer 2a

Elevasi layer 1 Pot A Elevasi layer 1 Pot B


elevasi Layer 1a elevasi Layer 1a
43.000 43.000

42.500 42.500

42.000 42.000

41.500 41.500

41.000 41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Elevasi Layer 1 Pot C Elevasi Layer1 Pot D


elevasi Layer 1a elevasi Layer 1a
43.000 43.000

42.500 42.500

42.000 42.000

41.500
41.500

41.000
41.000

40.500
40.500

40.000
40.000 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
Grafik Hasil Pengukuran Elevasi Layer 2a

Elevasi Layer 1 Pot E Elevasi Layer 1 Pot F


Elevasi Setelah Striping Elevasi Setelah Striping
43.000 43.000

42.500 42.500

42.000 42.000

41.500 41.500

41.000 41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Elevasi Layer 1 Pot G Elevasi Layer 1 Pot H


Elevasi Setelah Striping Elevasi Setelah Striping
43.000 43.000

42.500 42.500

42.000 42.000

41.500 41.500

41.000 41.000

40.500 40.500

40.000 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
Grafik Hasil Pengukuran Elevasi Layer 2a

Elevasi Layer 1 Pot I Elevasi Layer 1 Pot J


Elevasi Setelah Striping Elevasi Setelah Striping
43.000 43.000

42.500 42.500

42.000 42.000

41.500 41.500

41.000 41.000

40.500 40.500

40.000
40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Elevasi Layer 1 Pot K


Elevasi Setelah Striping Elevasi Layer 1 Pot L
43 43 Elevasi Setelah Striping

42.5 42.5

42 42

41.5 41.5

41 41

40.5 40.5

40 40
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
A, K, L Blm Diurug
VOLUME LAYER 1b GI 150kV BAYAN
Layer 1b
Potongan A
Titik Acuan Elevasi 43 Level 0
elevasi Layer 1b 41.100 41.100 41.100 41.100 41.100 41.100 41.100
elevasi setelah stripping
jarak m 1 10 15 15 15 21
jarak komulatif m 0 1 11 26 41 56 77
beda tinggi m
Luasan m2 0.000 0.000 0.000 0.000 0.000 0.000 0.000

Layer 1b 0 0.000
Potongan B Cek
Titik Acuan Elevasi 43 Level 0 0
elevasi Layer 1b 41.100 41.100 41.100 41.100 41.100 41.100 41.100
elevasi setelah stripping 40.905
jarak m 1.6 10 15 15 15 21
jarak komulatif m 0 1.6 11.6 26.6 41.6 56.6 77.6
beda tinggi m 0.20
Luasan m2 0.000 0.000 0.000 0.000 0.000 2.048 2.048

Layer 1b 0 2.048
Potongan C Cek
Titik Acuan Elevasi 43 Level 0 2.048
elevasi Layer 1b 41.100 41.100 41.100 41.100 41.100 41.100 41.100
elevasi setelah stripping 41.015
jarak m 2 10 15 15 15 21
jarak komulatif m 0 2 12 27 42 57 78
beda tinggi m 0.09
Luasan m2 0.000 0.000 0.000 0.000 0.000 0.893 0.893

Layer 1b 0.036 0.929


Potongan D Cek
Titik Acuan Elevasi 43 Level 0 0.929
elevasi Layer 1b 41.100 41.100 41.100 41.100 41.100 41.100 41.100
elevasi setelah stripping 40.865
jarak m 2.3 10 15 15 15 21
jarak komulatif m 0 2.3 12.3 27.3 42.3 57.3 78.3
beda tinggi m 0.24
Luasan m2 0.000 0.000 0.000 0.000 0.000 2.468 2.468

4.221 6.689
Cek
6.689
VOLUME LAYER 1b GI 150kV BAYAN

Layer 1b
Potongan E
Titik Acuan Elevasi 43 Level 0
elevasi Layer 1b 41.100 41.100 41.100 41.100 41.100 41.100 41.100
elevasi setelah stripping 40.815
jarak m 2.6 10 15 15 15 21
jarak komulatif m 0 2.6 12.6 27.6 42.6 57.6 78.6
beda tinggi m 0.29
Luasan m2 0.000 0.000 0.000 0.000 0.000 2.993 2.993

7.815 10.808
Layer 1b Cek
Potongan F 10.808
Titik Acuan Elevasi 43 Level 0
elevasi Layer 1b 41.100 41.100 41.100 41.100 41.100 41.100 41.100
elevasi setelah stripping 40.640
jarak m 3 10 15 15 15 21
jarak komulatif m 0 3 13 28 43 58 79
beda tinggi m 0.46
Luasan m2 0.000 0.000 0.000 0.000 0.000 4.830 4.830

Layer 1b 5.130 9.960


Potongan G Cek
Titik Acuan Elevasi 43 Level 0 9.960
elevasi Layer 1b 41.100 41.100 41.100 41.100 41.100 41.100 41.100
elevasi setelah stripping 40.612
jarak m 3.5 10 15 15 15 21
jarak komulatif m 0 3.5 13.5 28.5 43.5 58.5 79.5
beda tinggi m 0.49
Luasan m2 0.000 0.000 0.000 0.000 0.000 5.124 5.124

Layer 1b 13.335 18.459


Potongan H Cek
Titik Acuan Elevasi 43 Level 0 18.459
elevasi Layer 1b 41.100 41.100 41.100 41.100 41.100 41.100 41.100
elevasi setelah stripping 40.412
jarak m 3.8 10 15 15 15 21
jarak komulatif m 0 3.8 13.8 28.8 43.8 58.8 79.8
beda tinggi m 0.69
Luasan m2 0.000 0.000 0.000 0.000 0.000 7.224 7.224

8.697 15.921
Cek
15.921
VOLUME LAYER 1b GI 150kV BAYAN

Layer 1b
Potongan I
Titik Acuan Elevasi 43 Level 0
elevasi Layer 1b 41.100 41.100 41.100 41.100 41.100 41.100 41.100
elevasi setelah stripping 40.442
jarak m 4.1 10 15 15 15 21
jarak komulatif m 0 4.1 14.1 29.1 44.1 59.1 80.1
beda tinggi m 0.66
Luasan m2 0.000 0.000 0.000 0.000 0.000 6.909 6.909

Layer 1b 10.584 17.493


Potongan J Cek
Titik Acuan Elevasi 43 Level 0 17.493
elevasi Layer 1b 41.100 41.100 41.100 41.100 41.100 41.100 41.100
elevasi setelah stripping 40.455
jarak m 4.5 10 15 15 15 21
jarak komulatif m 0 4.5 14.5 29.5 44.5 59.5 80.5
beda tinggi m 0.65
Luasan m2 0.000 0.000 0.000 0.000 0.000 6.773 6.773

Layer 1b 13.86 20.633


Potongan K Cek
Titik Acuan Elevasi 43 Level 0 20.633
elevasi Layer 1b 41.100 41.100 41.100 41.100 41.100 41.100 41.100
elevasi setelah stripping 40.835 40.745 40.651 40.521
jarak m 4.8 10 15 15 15 21
jarak komulatif m 0 4.8 14.8 29.8 44.8 59.8 80.8
beda tinggi m 0.27 0.36 0.45 0.58
Luasan m2 0.000 0.000 1.988 4.650 6.030 10.794 23.462

Layer 1b 17.382 40.844


Potongan L Cek
Titik Acuan Elevasi 43 Level 0 23.4615
elevasi Layer 1b 41.100 41.100 41.100 41.100 41.100 41.100 41.100
elevasi setelah stripping 41.095 40.835 40.765 40.640 40.510
jarak m 4.8 10 15 15 15 21
jarak komulatif m 0 4.8 14.8 29.8 44.8 59.8 80.8
beda tinggi m 0.01 0.27 0.34 0.46 0.59
Luasan m2 0.012 0.025 1.988 4.500 5.963 11.025 23.512

0 23.512
Cek
REKAPITULASI VOLUME LAYER 1b GI 150kV BAYAN

No Potongan Luasan Interval Volume Sat

1 Potongan A 0.000
13.45 13.77 m3
2 Potongan B 2.048
15 22.05 m3
3 Potongan C 0.893
15 25.20 m3
4 Potongan D 2.468
15 40.95 m3
5 Potongan E 2.993
15 58.67 m3
4 Potongan F 4.830
15 74.66 m3
6 Potongan G 5.124
15 92.61 m3
7 Potongan H 7.224
15 106.00 m3
8 Potongan I 6.909
15 102.61 m3
9 Potongan J 6.773
15 226.76 m3
10 Potongan K 23.462
2.85 66.94 m3
11 Potongan L 23.512
m3
Total volume Timbunan Layer 1b 151.3 830.20 m3

DIPERIKSA DIPERIKSA DIAJUKAN OLEH


PT. PLN ( PERSERO) PT. PLN ( PERSERO ) PT. SEJAHTERA MULIA KENCANA
UPK KITRING NUSRA II JMK UMK II
………………………………………..……. …………………………….…… …………………………….……
Pengawas Pengawas Lapangan Sipil Engineer
Grafik Hasil Pengukuran Elevasi Layer 1b

Elevasi layer 1 Pot A Elevasi layer 1 Pot B


elevasi setelah stripping elevasi setelah stripping
43 43

42.5 42.5

42 42

41.5 41.5

41 41

40.5 40.5

40 40
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Elevasi Layer 1 Pot C Elevasi Layer1 Pot D


elevasi setelah stripping elevasi setelah stripping
43 43

42.5 42.5

42 42

41.5
41.5

41
41

40.5
40.5

40
40 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
Grafik Hasil Pengukuran Elevasi Layer 1b

Elevasi Layer 1 Pot E Elevasi Layer 1 Pot F


Elevasi Setelah Striping Elevasi Setelah Striping
43 43.000

42.5 42.500

42 42.000

41.5 41.500

41 41.000

40.5 40.500

40 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Elevasi Layer 1 Pot G Elevasi Layer 1 Pot H


Elevasi Setelah Striping Elevasi Setelah Striping
43 43

42.5 42.5

42 42

41.5 41.5

41 41

40.5 40.5

40 40
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
Grafik Hasil Pengukuran Elevasi Layer 1b

Elevasi Layer 1 Pot I Elevasi Layer 1 Pot J


Elevasi Setelah Striping Elevasi Setelah Striping
43 43

42.5 42.5

42 42

41.5 41.5

41 41

40.5 40.5

40
40
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Elevasi Layer 1 Pot K


Elevasi Layer 1 Pot L
Elevasi Setelah Striping
43 Elevasi Setelah Striping
43

42.5 42.5

42 42

41.5 41.5

41 41

40.5 40.5

40 40
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
41

40.5 40.5

40 40
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
A, K, L Blm Diurug
VOLUME LAYER 1a GI 150kV BAYAN
Layer 1
Potongan A
Titik Acuan Elevasi 43 Level 0
elevasi Layer 1 41.100 41.100 41.100 41.100 41.100 41.100
elevasi setelah stripping
jarak m 1 10 15 15 15 21
jarak komulatif m 0 1 11 26 41 56 77
beda tinggi m
Luasan m2 0.000 0.000 0.000 0.000 0.000 0.000 0.000

Layer 1
Potongan B
Titik Acuan Elevasi 43 Level 0
elevasi Layer 1 41.100 41.100 41.100 41.100 41.100 41.100
elevasi setelah stripping
jarak m 1.6 10 15 15 15 21
jarak komulatif m 0 1.6 11.6 26.6 41.6 56.6 77.6
beda tinggi m
Luasan m2 0.000 0.000 0.000 0.000 0.000 0.000 0.000

Layer 1
Potongan C
Titik Acuan Elevasi 43 Level 0
elevasi Layer 1 41.100 41.100 41.100 41.100 41.100 41.100
elevasi setelah stripping 41.098
jarak m 2 10 15 15 15 21
jarak komulatif m 0 2 12 27 42 57 78
beda tinggi m 0.002
Luasan m2 0.000 0.000 0.000 0.000 0.015 0.021 0.036

Layer 1
Potongan D
Titik Acuan Elevasi 43 Level 0
elevasi Layer 1 41.100 41.100 41.100 41.100 41.100 41.100
elevasi setelah stripping 40.995 40.953
jarak m 2.3 10 15 15 15 21
jarak komulatif m 0 2.3 12.3 27.3 42.3 57.3 78.3
beda tinggi m 0.11 0.15
Luasan m2 0.000 0.000 0.000 0.788 1.890 1.543 4.221
VOLUME LAYER 1a GI 150kV BAYAN

Layer 1
Potongan E
Titik Acuan Elevasi 43 Level 0
elevasi Layer 1 41.100 41.100 41.100 41.100 41.100 41.100
elevasi setelah stripping 40.885 40.845
jarak m 2.6 10 15 15 15 21
jarak komulatif m 0 2.6 12.6 27.6 42.6 57.6 78.6
beda tinggi m 0.22 0.26
Luasan m2 0.000 0.000 0.000 1.613 3.525 2.678 7.815

Layer 1
Potongan F
Titik Acuan Elevasi 43 Level 0
elevasi Layer 1 41.100 41.100 41.100 41.100 41.100 41.100
elevasi setelah stripping 42.155 40.815
jarak m 3 10 15 15 15 21
jarak komulatif m 0 3 13 28 43 58 79
beda tinggi m 0.29
Luasan m2 0.000 0.000 0.000 0.000 2.138 2.993 5.130

Layer 1
Potongan G
Titik Acuan Elevasi 43 Level 0
elevasi Layer 1 41.100 41.100 41.100 41.100 41.100 41.100
elevasi setelah stripping 40.799 40.610
jarak m 3.5 10 15 15 15 21
jarak komulatif m 0 3.5 13.5 28.5 43.5 58.5 79.5
beda tinggi m 0.30 0.49
Luasan m2 0.000 0.000 0.000 2.258 5.933 5.145 13.335

Layer 1
Potongan H
Titik Acuan Elevasi 43 Level 0
elevasi Layer 1 41.100 41.100 41.100 41.100 41.100 41.100
elevasi setelah stripping 41.011 40.691
jarak m 3.8 10 15 15 15 21
jarak komulatif m 0 3.8 13.8 28.8 43.8 58.8 79.8
beda tinggi m 0.09 0.41
Luasan m2 0.000 0.000 0.000 0.667 3.735 4.294 8.697
VOLUME LAYER 1a GI 150kV BAYAN

Layer 1
Potongan I
Titik Acuan Elevasi 43 Level 0
elevasi Layer 1 41.100 41.100 41.100 41.100 41.100 41.100
elevasi setelah stripping 40.512
jarak m 4.1 10 15 15 15 21
jarak komulatif m 0 4.1 14.1 29.1 44.1 59.1
beda tinggi m 0.59
Luasan m2 0.000 0.000 0.000 0.000 4.410 6.174 10.584

Layer 1
Potongan J
Titik Acuan Elevasi 43 Level 0
elevasi Layer 1 41.100 41.100 41.100 41.100 41.100 41.100
elevasi setelah stripping 40.955 40.795 40.705
jarak m 4.5 10 15 15 15 21
jarak komulatif m 0 4.5 14.5 29.5 44.5 59.5 80.5
beda tinggi m 0.15 0.31 0.40
Luasan m2 0.000 0.000 1.088 3.375 5.250 4.148 13.860

Layer 1
Potongan K
Titik Acuan Elevasi 43 Level 0
elevasi Layer 1 41.100 41.100 41.100 41.100 41.100 41.100
elevasi setelah stripping 40.835 40.745 40.651 40.521
jarak m 4.8 10 15 15 15 21
jarak komulatif m 0 4.8 14.8 29.8 44.8 59.8 80.8
beda tinggi m 0.27 0.36 0.45
Luasan m2 0.000 0.000 1.988 4.650 6.030 4.714 17.382

Layer 1
Potongan L
Titik Acuan Elevasi 43 Level 0
elevasi Layer 1
elevasi setelah stripping
jarak m 4.8 10 15 15 15 21
jarak komulatif m 0 4.8 14.8 29.8 44.8 59.8 80.8
beda tinggi m
Luasan m2 0.000 0.000 0.000 0.000 0.000 0.000 0.000
REKAPITULASI VOLUME LAYER 1a GI 150kV BAYAN

No Potongan Luasan Interval Volume Sat

1 Potongan A 0.000
13.45 - m3
2 Potongan B 0.000
15 0.27 m3
3 Potongan C 0.036
15 31.93 m3
4 Potongan D 4.221
15 90.27 m3
5 Potongan E 7.815
15 97.09 m3
4 Potongan F 5.130
15 138.49 m3
6 Potongan G 13.335
15 165.24 m3
7 Potongan H 8.697
15 144.61 m3
8 Potongan I 10.584
15 183.33 m3
9 Potongan J 13.860
15 234.32 m3
10 Potongan K 17.382
2.85 24.77 m3
11 Potongan L 0.000
m3
Total volume Timbunan Layer 1a 151.3 1,110.30 m3

DIPERIKSA DIPERIKSA DIAJUKAN OLEH


PT. PLN ( PERSERO) PT. PLN ( PERSERO ) PT. SEJAHTERA MULIA KENCANA
UPK KITRING NUSRA II JMK UMK II
………………………………………..……. …………………………….…… …………………………….……
Pengawas Pengawas Lapangan Sipil Engineer
Grafik Hasil Pengukuran Elevasi Layer 1a

Elevasi layer 1 Pot A Elevasi layer 1 Pot B


elevasi setelah stripping elevasi setelah stripping
43 43

42.5 42.5

42 42

41.5 41.5

41 41

40.5 40.5

40 40
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Elevasi Layer 1 Pot C Elevasi Layer1 Pot D


elevasi setelah stripping elevasi setelah stripping
43 43

42.5 42.5

42 42

41.5
41.5

41
41

40.5
40.5

40
40 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
Grafik Hasil Pengukuran Elevasi Layer 1a

Elevasi Layer 1 Pot E Elevasi Layer 1 Pot F


Elevasi Setelah Striping Elevasi Setelah Striping
43 43.000

42.5 42.500

42 42.000

41.5 41.500

41 41.000

40.5 40.500

40 40.000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Elevasi Layer 1 Pot G Elevasi Layer 1 Pot H


Elevasi Setelah Striping Elevasi Setelah Striping
43 43

42.5 42.5

42 42

41.5 41.5

41 41

40.5 40.5

40 40
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
41 41

40.5 40.5

40 40
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
Grafik Hasil Pengukuran Elevasi Layer 1a

Elevasi Layer 1 Pot I Elevasi Layer 1 Pot J


Elevasi Setelah Striping Elevasi Setelah Striping
43 43

42.5 42.5

42 42

41.5 41.5

41 41

40.5 40.5

40
40
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Elevasi Layer 1 Pot K


Elevasi Layer 1 Pot L
Elevasi Setelah Striping
43.000 Elevasi Setelah Striping
43

42.500 42.5

42.000 42

41.500 41.5

41.000 41

40.500 40.5

40.000 40
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
41

40.500 40.5

40.000 40
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

A, K, L Blm Diurug

You might also like