Professional Documents
Culture Documents
FESR - Field Engineer Service Report v-2
FESR - Field Engineer Service Report v-2
FESR - Field Engineer Service Report v-2
3/F01
Field Engineer Service Report Rev No:00
Customer: Ticket #
Description of Compliant:
n) Is IDU stacked with other devices? If Yes, Kindly inform to customer to rectify.
o) Is IDU installed in Air condition or cool environment?
p) Is IDU installed in proper rack space / dust free environment?
q) Detailed problem summary, what went wrong.
Site Conditions:
Indoor Equipment Outdoor Equipment
Is the equipment connected on the UPS? Y/ N Earth - Neutral voltage V
Condition of the earth pit
Is the equipment kept in a clean and air-conditioned room? Y/ N
Cable Length
Customer Comments:
FE Sign:
Customer Sign & Stamp:
FE Name: