DIVISION 2:

ACTIVITIES QUANTITY DURATION


STAKING

GRADING

EXCAVATION AND TRENCHING

SOIL POISONING
BACK FILLING
FILLING

COMPACTION

DIVISION 3
ACTIVITIES QUANTITY DURATION

FABRICATION OF BARS
INSTALLATION OF REBARS (FOOTING)
INSTALLATION OF REBARS (COLUMN)
INSTALLATION OF REBARS (SLAB)
INSTALLATION OF REBARS (BEAMS)
PLACING OF CONCRETE FOR FOOTING
INSTALLATION OF CONCRETE FORMS
STRIPPING OF FORMS
SURFACE FINISHING
CURING

DIVISION 4:
ACTIVITIES
QUANTITY DURATION

LAYOUTING
ERECTION
MORTAR MIXING
REINFORCING
GROUT PLACEMENT
SURFACE FINISHING
EXISTING SITE CONDITIONS
RESOURCES
DURATION
MANPOWER MATERIALS TOOLS EQUIPMENT
Stakes, Hammer, Marking Tools, Steel Square,
Try-square, Hand Saw, Chalk Line, Water Hose
Level, Plumb Bob, PPE, Circular Saw

Shovel, Wheelbarrow, Hard-metal Rake, 4-


foot level, Tape Measure, Sprinkler
Spade, Shovel, Hoe, Trowel, Rake, Pick Axe, Hydraulic Excavator, Tr
Mattock Trucks
Termiticide PPE, Sprayer, Tank, Shovel
Coarse-grained Soil
Crushed Stone, Power Roller
Sand, Gravel or
Earth
Power Roller, Ram
Vibrating Plate Compactor
CONCRETING
RESOURCES
DURATION
MANPOWER MATERIALS TOOLS EQUIPMENT

MASONRY
RESOURCES
DURATION
MANPOWER MATERIALS TOOLS EQUIPMENT
EQUIPMENT

Hydraulic Excavator, Tractor,


Trucks

Power Roller

Power Roller, Rammers,


Vibrating Plate Compactors

EQUIPMENT

EQUIPMENT