LIQUID

ID Length Bypass Total Volume Pig Velocity Duration Flow rate

m m % m3 m/min minutes hours l/min m3/hr bbl/d

0.2027 2,500 5 84.78 5 500.00 8.33 169.55 10.17 1,535.73

0.2027 6,000 5 203.46 6 1,000.00 16.67 203.46 12.21 1,842.88

0.2027 33,000 5 1,119.04 10 3,300.00 55.00 339.10 20.35 3,071.47

0.2027 800 0 25.84 8 100.00 1.67 258.36 15.50 2,340.17

0.1464 5,000 0 84.15 9 555.56 9.26 151.48 9.09 1,372.03

0.3365 20,000 100 3,559.57 16.66 1,200.48 20.01 2,965.13 177.91 26,856.92

0.1016 2,000 0 16.22 5 400.00 6.67 40.55 2.43 367.31

0.3032 2,000 0 144.46 5 400.00 6.67 361.15 21.67 3,271.19

0.3238 3 0 0.21 5 0.50 0.01 411.90 24.71 3,730.80

0.2984 3,000 0 209.89 5 600.00 10.00 349.81 20.99 3,168.44

0.3254 55 0 4.58 3 18.33 0.31 249.62 14.98 2,260.93

0.9969 3,400 0 2,655.10 6.5 523.08 8.72 5,075.93 304.56 45,975.79


0.4379 14,000 0 2,109.71 16 875.00 14.58 2,411.09 144.67 21,838.71

0.3873 92,000 0 10,845.19 17 5,411.76 90.20 2,004.00 120.24 18,151.45

0.5970 400 0 112.01 5 80.00 1.33 1,400.18 84.01 12,682.25

1.0480 850 0 733.51 6 141.67 2.36 5,177.72 310.66 46,897.71

0.0762 5,000 0 22.81 7 714.29 11.90 31.94 1.92 289.26


GAS
Operating
ID Length Safety margin Total Volume
pressure
m m % m3 bar

0.2027 2,500 20 1,937.74 20

Example N2 Volume estimation:

The 10" STD pipeline (ID = 254.4mm) has a total distance of 10km,

The water volume requirement to fill throughout the length was 100m 3

The pressure requires behind the pig was 10 bar

Therefore, the N2 volume requires can be estimated at 100m3x10bar = 1000m3

12"x12.7mm

14"x9.53mm

40"x9.53mm
18"

16"

12" STD

42"

3"
OIL
Pig's Speed Flowrate Pipe ID
m/hour m/min m/s BBL/Day inch

1,136.352 18.939 0.316 22,222.00 16

Pig's Speed Flowrate Pipe ID

m/hour m/min m/s m3/Day inch

609.524 10.159 0.169 19,200.00 50

Run Time Length Pig speed

Hours km m/s

6.944 50.00 2
GAS
Production (Q) Pig's velocity Pipe ID
m3/day scfm m/s m

37.72 1,538 1.00 0.762


Operationg Pressure
Bar

0.5 30"
Mimimum Require
Design
Thickness ASME B31.3 Pipe OD S (Temp) E
Pressure
Liquid
mm inch psig inch psi

9.523 0.375 941 12.75 16000 1

7.488 0.295 941 6.625 16000 1

7.822 0.308 700 8.625 16500 1

4.878 0.192 725 10.75 20000 1

Mimimum Require Design


Pipe OD SMYS (psi) E
Thickness ASME B31.8 GAS Pressure
mm inch psig inch psi

201.260 7.924 1415 14 42000 1

Mimimum Require
Design
Thickness ASME B31.4 Pipe OD SMYS (psi) E
Pressure
Liquid
mm inch psig inch psi

9.068 0.357 290 52 65000 1


Corrosion
Y
Allowance

inch

0 0

0 0.1

0 0.125

0.4 0

Corrosion Design Temperature


Mill Tolerance
Allowance Factor Design Factor
inch Class? inch

0.0625 0.3 0.1 0

Corrosion Design
Mill Tolerance
Allowance Factor
inch Class? inch

0.125 0.5 0
Minimum
Maximum Allowable Corrosion Inspection
thickness Pipe OD
Working Pressure (MAWP) rate Inteval
found
bar psi inch inch inch/year year

40.733 590.625 0.25 16 0 0


Corrosion
S (Temp) Ej
Allowance

psi inch

18900 1 0
ASME B31.G Original L (mm) OD (mm) t (mm) SMYS (MPa) Depth (mm) f_S f_T

BYGP SP-NP 20" 20.90 508.00 11.20 448.06 3.36 0.72 1.00

API 5L X65 30%

Parameter for calculating ERF

OD (inch) 20.00 508 mm

SMYS (psi) 65,000.00 448.1594 MPa


MAOP (Mpa) 2*(t*f_S*f_T/D) P z = L^2/Dt M (2/3) d/t (2/3)*(d/t)

9.75 14.22 14.22 0.08 1.03 0.67 0.30 0.20

Psafe / MAOP 1.59

Pfail / MAOP 2.21

Sflow
flow stress
SF estimated failure stress level

PF estimated failure pressure

PS
safe operating preessure

SF
safety factor
1-(2/3)*(d/t) 1-(2/3)*(d/t)/M [] P_safe ERF Log Distance Sflow

0.80 0.81 0.99271263 15.5333572 0.63 sample 492.86


SF PF PS SF ERF

489.27 21.57 15.53 1.39 0.63


ASME B31.G Modified L (mm) OD (mm) t (mm) SMYS (MPa) Depth (mm) f_S f_T

BYGP SP-NP 20" 20.00 609.60 6.35 290.00 3.36 0.72 1.00
30%
MAOP (MPa) 2*(t*f_S*f_T/D) P z = L^2/Dt M d/t 0.85(d/t) 1-0.85(d/t) 1-0.85(d/t)/M

4.34 4.35 4.35 0.10 1.03 0.53 0.45 0.55 0.56

Psafe / MAOP 1.08


Pfail / MAOP 1.49
[] P_safe ERF Log Distance Sflow SF PF PS

0.9753579612 4.6670878445 0.93 sample 319.00 311.14 6.48 4.67

Mpa
psi
SF ERF Hoop Stress (MPa) SMYS 72% SMYS (MPa) psi

1.39 0.93 6.0416666667 72% 4.35 630.9153

1
145.038
ASME B31.G Modified L (mm) OD (mm) t (mm) SMYS (MPa) Depth (mm) f_S f_T

BYGP SP-NP 20" 20.90 508.00 11.20 448.06 3.36 0.72 1.00
30%
MAOP (MPa) 2*(t*f_S*f_T/D) P z = L^2/Dt M d/t 0.85(d/t) 1-0.85(d/t) 1-0.85(d/t)/M

9.75 14.22 14.22 0.08 1.02 0.30 0.26 0.75 0.75

Psafe / MAOP 1.59


Failure Pressure Ratio (FPR) Pfail / MAOP 2.21
[] P_safe ERF Log Distance Sflow SF PF PS

0.9921076087 15.5238903104 0.63 sample 492.86 488.97 21.56 15.52

Mpa
psi
SF ERF Hoop Stress (MPa) SMYS 50% SMYS (MPa) psi

1.39 0.63 19.7568 50% 9.8784 1432.743379

1
145.038
UTMC
Tool Resolution
Amount of Switching
Tool Velocity Pipe OD
Axial Circum. Transducer rate

mm mm m/s unit Hz mm

18.77 9.58 1.22 200.00 13,000.00 609.60

22.15 9.58 1.44 200.00 13,000.00 609.60


Tool size

inch

24.00

24.00
Mimimum Require
Design
Thickness ASME B31.3 Pipe OD S (Temp) E
Pressure
Liquid
mm inch psig inch psi

5.825 0.229 580 16 20000 1

Mimimum Require Design


Pipe OD SMYS (psi) E
Thickness ASME B31.8 GAS Pressure
mm inch psig inch psi

13.902 0.547 720 24 65300 1


9.267 0.365 1415 20 65000 1
Corrosion
Y Mill Tolerance
Allowance
inch inch

0.4 0 0

Corrosion Design Temperature


Mill Tolerance
Allowance Factor Design Factor
inch Class? inch

0.0625 0.3 1 0.08


0.0625 0.72 1 0
Mimimum Thickness of Operating ID of the
S (Temp) Ej
Blanks ASME B31.3 Pressure Gasket
mm inch psig inch psi

22.511 0.886 725 10.75 20000 1

33.505 1.319 725 16 20000 1


Corrosion
Allowance
inch

0
10"

0
16"
PTTEP S1 - UT In-Line Inspection of Oil & Gas Flowlines

Design
Flow Direction
Items Services Equipment Number Pressure Original Last
Installed Inspection
Begin End psig

1 Crude TRT-CA 6"x5.1Km (6.35mm_thk) TRT-C LKU-B 1,740 June 05 14 Jun 05

2 Crude NMM-FA 6"x1.8Km (7.92mm_thk) NMM-F LKU-B 1,740 June 05 14 Mar 19

3 Crude NMM-AB 6"x8.5Km (6.35mm_thk) NMM-A LKU-A 1,740 1987 21 Mar 19

4 GasLift TRT-CGA 3"x4.5Km (5.49mm_thk) NMM-AGA TRT-C 2,600 1989 04 Sep 18

5 GasLift NMM-AGA 3"x4.66Km (7.62mm_thk) Road 2 NMM-A 2,000 1987 08 Jan 19

6 Crude NMM-FC 10"x1.187Km (12.7mm_thk) NMM-F LKU-B 1,740 2001 08 Mar 19

7 Crude TRT-CC 10"x 2.0Km (15.87mm_thk) TRT-Cext LKU-B 2,000 2014 27 Jul 19

8 Water TRT-CGA 6"x2.0Km (14.27mm_thk) LKU-B TRT-D 2,000 2013 04 Sep 18


Gas Flowlines

Total Pig Flow


ID L Duration
Volume Velocity rate

m m m3 m/min hours m3/hr


0.156 5,100 97.0 30 2.83 34.2

0.152 1,800 32.9 30 1.00 32.9

0.156 8,500 161.7 30 4.72 34.2

0.078 4,500 21.5 30 2.50 8.6

0.074 4,660 19.9 30 2.59 7.7

0.248 1,187 57.2 30 0.66 86.7

0.241 2,000 91.5 30 1.11 82.3

0.140 2,000 30.7 30 1.11 27.6


UT PIGGING HSD 24"x1.8Km - Thicknes

ID
Items Pigging Sequence
m
1 Cleaning pig 0.5909

2 Cleaning pig 0.5909

3 Gauge pig 0.5909

4 UT Pig 0.5909

UT PIGGING CRUDE 22"x1.8Km - Thickne

ID
Items Pigging Sequence
m
1 Cleaning pig 0.5399

2 Cleaning pig 0.5399

3 Gauge pig 0.5399

4 UT Pig 0.5399

Option 1: Caliper and MFL + Mapping of 14"x292Km & 12"x75Km N

ID
Section Pigging Sequence

m
12" x 75 km (Kamphaengphet/Phichit) 12" Caliper & MFL Batching 0.3047

14" x 292 km (Bang Pa-in/Kamphaengphet) 14" Caliper & MFL Batching 0.3365

Total

Option 2: Caliper and MFL + Mapping of 14"x292Km & 12"x75Km N

ID
Section Pigging Sequence

Caliper: 14" x 292 Km (Bang Pa-in/Kamphaengphet) 12" Caliper run 0.3047

12" x 75 Km (Kamphaengphet/Phichit) 14" Caliper run 0.3365

Wait for 1.5 months to release the storage tanks capaci

MFL: 14" x 292 Km (Bang Pa-in/Kamphaengphet) 12" MFL run 0.3047

and 12" x 75 Km (Kamphaengphet/Phichit) 14" MFL run 0.3365


Total
D 24"x1.8Km - Thickness 9.53mm

Pig
L Bypass Total Volume Duration Flow rate
Velocity
m % m3 m/min minutes hours l/min m3/hr
1,800 0 494 60 30 0.50 16,463 988

1,800 0 494 60 30 0.50 16,463 988

1,800 0 494 30 60 1.00 8,231 494

1,800 0 494 4 450 7.50 1,098 66

DE 22"x1.8Km - Thickness 9.53mm

Pig
L Bypass Total Volume Duration Flow rate
Velocity
m % m3 m/min minutes hours l/min m3/hr
1,800 0 412 60 30 0.50 13,744 825

1,800 0 412 60 30 0.50 13,744 825

1,800 0 412 30 60 1.00 6,872 412

1,800 0 412 4 450 7.50 916 55

ping of 14"x292Km & 12"x75Km New Multiphase Pipeline

Acummulative
Length Bypass Volume at Receiving Pig Velocity Duration Flow rate
end
m % m3 m/min minutes hours l/min m3/hr
75,000 0 5,472 30 2,500 41.67 2,189 131

292,000 0 25,985 30.0 9,733 162.22 2,670 160

25,985 162.22

ping of 14"x292Km & 12"x75Km New Multiphase Pipeline

Acummulative
Length Bypass Volume at Receiving Pig Velocity Duration Flow rate
end
m % m3 m/min minutes hours l/min m3/hr

75,000 0 5,472 30.0 2,500 41.67 2,189 131

292,000 0 25,985 30.0 9,733 162.22 2,670 160

release the storage tanks capacity at Phichit

75,000 0 5,472 30.0 2,500 41.67 2,189 131

292,000 0 25,985 30.0 9,733 162.22 2,670 160


51,970 324.44
Calculation Pig Runtime using Panhandle B Eqn (No liquids in
P1 d S.G L Tavg

Pressure at
wellhead ID of Pipe Specific gravity of Length of line Temp of gas
(Absolute) m gas m K
(Kpa)

0.150 0.59 7,400 313.15


6101.3

Launcher

Your input data:


P1 (barg) 60 Wellhead Pressure
P2 (barg) 0 Open to atmosphere (Atm Flare)
Pipe Dia (mm) 150 Given
Length of line 7400 Given
S.G 0.59 Given
z (comressibility) 0.9 Approximate for 95% C1 and some other gas at 60 barg & 25C
Temp © 25 Given
STP
ST (K) 288.15
SP (Kpa) 101.325

Results:
Qsc 1,563,941 sm3/d 55230.06 MMscfd
18.10 sm3/sec 38.3542070201 cfm

Convert to actual flow


P1 (kpa) V1 (m3) TI (K) Z1 P2 (Kpa)
101.325 18.1 288.15 1 6101.3
Qac 0.29 am3/sec
C.S area of pipe 0.02 m2
Velocity 17 m/s
Pig Run Time 445 seconds
7.4 minutes

Reference:
Campbell gas conditioning & processing VOL1
Panhandle B equation for gas transmission lines
ing Panhandle B Eqn (No liquids in line)
Zavg E K P2

Pipeline efficiency Outlet pressure


Compressibility of gas (usually 0.88 TO 0.94). (Absolute)
0.92 as per Campbell (kpa)

0.9 0.92 12,640,000


101.33

Reciever

me other gas at 60 barg & 25C

Qac (am3/sec) T2 (K) Z2


0.29 313.15 0.9
KNOC - UT PIGGING Condensate 6"x2.7Km - Thickness 10.97mm

Total Pig
ID L Bypass Duration
Items Pigging Sequence Volume Velocity

m m % m3 m/min minutes

1 Cleaning pig 0.1463 2,700 0 45 8.00 338

2 Cleaning pig 0.1463 2,700 0 45 8.00 338

3 Gauge pig 0.1463 2,700 0 45 8.00 338

0.1463 2,700 0 45 8.00 338

4 UT Pig 0.1463 2,700 0 45 4.00 675

0.1463 2,700 0 45 2.00 1,350


x2.7Km - Thickness 10.97mm

Acummulative
Duration Flow rate Resolution (mm)
Volume

hours l/min m3/hr bbl/d m3 Axial

5.63 135 8.07 1,219 8.07

5.63 135 8.07 1,219 16.14

5.63 135 8.07 1,219 24.22

5.63 135 8.07 1,219 38.10

11.25 67 4.04 609 32.29 19.00

22.50 34 2.02 305 9.50


Resolution (mm)

Circum

1.60

1.60

1.60
36" CRUDE LINE FOR PTT KHOABOYA

Pipe Size OD (mm) Thk. (mm)


36" STD. 914.40 9.53

Min. Guiding OD 886.39 mm.


Min. Sealing OD 1,029.64 mm.
ID (mm) % Sealing
895.34 15.00
Integrity Management Plan for BYGP NP-SP 20" Pipeline - Pipeline Data

Segment Data Type

Pipe attributes Pipe grade


Size
Wall thickness
Corrosion Allowance
Seam type

Design/ Construction Operating pressure


SMYS
Construction Code
Coating type
Coating condition
Pipe install date
Hydrostatic test

Operational Compressor discharge temperature


Pipe wall temperature
Flow rate
Repair methodes
Leak/ rupture history
Pressure cycling
CP effectiveness
SCC indications

Integrity Management Plan for BYGP NP-SP 20" Pipeline - Integritry

Threat Criteria/Risk Assessment

Performed In-Line Inspection (HR-MFL +


Caliper), and NDE (Automated corrosion
External Corrosion
mapping and Coating thickness
measurement)

Performed In-Line Inspection (HR-MFL +


Caliper), and NDE (Automated corrosion
Intermal Corrosion
mapping and Coating thickness
measurement)

SCC No history of SCC issues


Seamless pipe, joint factor =1.0, no
Manufacturing
hydrostatic test

Construction/fabrication No construction issues

Equipment No equipment issues

Third-party damage No third-party damage issues

Incorrect operations No operations issues

No weather-related or outside-force
Weather and outside force
issues

ASME B31.G Modified L (mm)

BYGP SP-NP 20" 20.90

Require Thickness (inch) Design Pressure (psi)

0.302 1,415.00

0.12 Min_Structural thickness from API 574

0.14 Min_Alert thickness from API 574

Corrosion rate (inch/year) Initial thickness (inch)

0.009 0.439

Remaining Lift (Year) Required thickness (inch)

19.833 0.120
17.712 0.140
SP 20" Pipeline - Pipeline Data

Example

API 5L GR - X65
20 in. (508 mm)
0.439 in. (11.2 mm)
0.0625 in. (1.6 mm)
Seamless weld (SMLS)

1415 psi (9.75 MPa) @150'F


65000 psi (448 MPa)
ASME B31.8
Three layers polyethylene coating
Good
2005
None

TBA
TBA
TBA
TBA
None
TBA
Good
None

ent Plan for BYGP NP-SP 20" Pipeline - Integritry Assessment Plan

Interval
Integrity Assessment Mitigation
(Year)

Conduct hydrostatic test, perform In-Line


Replace/repair locations where CFP
Inspection (ILI), and perform direct 15
below 1.65 times the MAOP
assessment

Conduct hydrostatic test, perform In-Line


Replace/repair locations where CFP
Inspection (ILI), and perform direct 15
below 1.65 times the MAOP
assessment

If any SCC to be found, the pipe shall


be replaced at test faulure locations (If
the failure caused by SCC, the
Conduct hydrostatic test 3-5
inspection interval shall be within 3
years, and if the test is successful, the
interval shall be within 5 years).
Conduct hydrostatic test N/A N/A

None required N/A N/A

None required N/A N/A

None required N/A N/A

None required N/A N/A

None required N/A N/A

OD (mm) t (mm) SMYS (MPa)

508.00 11.20 448.06

OD (inch) Design Factor E

20.00 0.72 1.00

Actual thickness (inch) Year Installation Year inspection

0.307 2005 2019

Actual thickness (inch) Corrosion rate (inch/year)

0.307 0.009
Min_Structural thickness from API 574
0.307 0.009
Min_Alert thickness from API 574
Depth (mm) f_S f_T MAOP (MPa)2*(St*f_S*f_T/D) P z = L^2/Dt M d/t 0.85(d/t)

3.36 0.72 1.00 9.75 14.22 14.22 0.08 1.02 0.30 0.26
30%

S (psi) T ('F) CA (inch)

65,000.00 1.00 0.0625

Psafe / MAOP

Psafe / MAOP

Pfail / MAOP

uctural thickness from API 574


rt thickness from API 574
1-0.85(d/t) 1-0.85(d/t)/M [] P_safe ERF Log Distance Sflow SF PF PS

0.75 0.75 0.9921076087 15.52389031 0.63 sample 492.86 488.97 21.56 15.52
###

1.59

#DIV/0!

2.21
FPR (Failure Pressure Ratio)

Mpa

psi
SF ERF Po So Hoop Stress (MPa) SMYS 50% SMYS (MPa)

1.39 0.63 9.75 221.11607 19.7568 50% 9.8784

Sf >= SF x So ACCEPTED

Pf >= SF x Po ACCEPTED

9.75

1414.121