Resort Case Study
Resort Case Study
RESTAURANT
SITE INFORMATION
COMPLETED : 2006
LODGING
PROJECT COST : Rs 6,00,00,000
SUMP
22%
BIO-‐GAS
BIOGAS PLANT KEB
SOLAR COOKER
INLET
GROUND LVL
OUTLET
WHEN THE ENERGY SYSTEMS USED BY THE RESORT FAIL WATER
MANAGEMENT
OR MALFUNCTION, THE BACKUP GENERATOR PROVIDES
WASTE
POWER FOR THE RESORT’S FUNCTIONING. HOWEVER,
MANAGEMENT
THIS IS LARGELY REDUNDANT, AS THE RESORT RELIES
BORE
WELL
RAIN
WATER
PRIMARILY ON SOLAR POWER WHICH, ON STORAGE, IS
RELIABLE ENOUGH TO POWER THE RESORT FOR NIGHT
TIME AND ON CLOUDY DAYS.
SUMP
RECHARGE
WELL
GARDENING
GREY
WATER
BLACK
WATER
SOLID
WASTE
• SOLAR COOKER USED FOR THE RESIDENT KITCHEN,
• SOLAR PANELS PROVIDE 6.4KW OF POWER,
• THE WINDMILL PROVIDES 3.3KW OF POWER,
• OVERHEAD TANK CAPACITY - 84,000L, OVER
HEAD
• NO ENERGY CONSUMED IN PUMPING TO ROOMS, TANK
DUMPED
• NO AIR CONDITIONING USED IN THE RESORT.
GARDENING
LEACH
PIT
OUTSIDE
THE
SITE
DISTRIBUTION