Professional Documents
Culture Documents
TADM70 Question
TADM70 Question
com/tadm70-exam-questions/
2) In the SAP versions 4.X which file is used to restart the export?
-) file TOC;
3) Which must be the release of R3load for the request of the migration key, in a system 4.6x ?
The release of the R3load must be the same of the SAP kernel released for the release 4.6x
6) For verify if the existing objects in the *.STR files are on DB which control must to be do?
8) files TSK:
-) are introduced on version 6.10
-) they has R3load execution parameters
-) Allow the restart management for export import
10) In which situation must be “CALLED” an OS/DB migration consultant?
When we are doing an Heterogeneous System Copy, in every kind of system (development, test and
production).
11) If we change an entry in task file from ‘ok’ to ‘err’ what must happen at restart the import with
R3load?
socket , continue_on_error ..
15) Which program produces the EXT files on 6.X migrations ?
18) If own system crash for “POWER FAILURE” in a 4.X migration which action can be do?
Delete TOC, DUMP and LOG files from the package that was interrupted at crash time
20) From which program has been created the R3LOAD TSK files ?
From R3LOAD
a) install directory
b) data
c) DB
d) DB/DBS
e) Dump directory
24) if a customer have an CUSTOM tablespace with the correct TABART, but after reorganization
activities the tablespace can be placed on standard tablespace without modify the TABART.
Indicate if the follow sentences are true or false:
A) The export R3LOAD is interrupted because doesn’t found the correct tablespace.
B) R3SIZECHK can be able to calculate the dimension without any problem
Comments
Guest |
| 26 Jun 2010 8:14 pm
1) Which of the following statements is true? Regarding incremental migration
2) In the SAP versions 4.X which file is used to restart the export?
-) file TOC;
3) Which must be the release of R3load for the request of the migration key, in a system 4.6x ?
The release of the R3load must be the same of the SAP kernel released for the release 4.6x
6) For verify if the existing objects in the *.STR files are on DB which control must to be do?
8) files TSK:
11) If we change an entry in task file from ‘ok’ to ‘err’ what must happen at restart the import with R3load?
When the merge of task file finish, the import process start automatically
The option merge_bck change the status of the entries xeq to err in task files
18) If own system crash for “POWER FAILURE” in a 4.X migration which action can be do?
Delete TOC, DUMP and LOG files from the package that was interrupted at crash time
20) From which program has been created the R3LOAD TSK files ?
From R3LOAD
24) if a customer have an CUSTOM tablespace with the correct TABART, but after reorganization activities the
tablespace can be placed on standard tablespace without modify the TABART. Indicate if the follow sentences are
true or false:
A) The export R3LOAD is interrupted because doesn’t found the correct tablespace.
B) R3SIZECHK can be able to calculate the dimension without any problem
a) In the dump file can be found the information for the follow file dump for be imported
b) Is created by R3LOAD