Table 3.1.

d The average daily rainfall

Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember
Tahun
I II I II I II I II I II I II I II I II I II I II I II I
1997 4.74 4.30 3.76 3.63 2.56 3.67 0.62 0.43 0.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 2.48 2.30 2.35 4.18 3.56
1998 5.38 4.44 4.66 4.20 3.63 3.98 2.00 2.56 0.70 0.10 0.10 0.00 0.00 0.00 0.00 0.00 0.00 3.35 2.58 3.00 2.56 2.45 3.80
1999 5.38 4.33 4.60 4.15 3.22 3.98 0.95 0.54 0.70 0.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.30 2.56 2.60 2.43 4.34 3.65
2000 3.10 3.98 3.45 3.20 2.20 3.20 0.34 0.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 2.00 1.67 2.00 3.50 3.20
2001 3.28 4.00 3.50 3.30 2.25 3.33 0.37 0.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 2.50 1.70 2.10 3.80 3.30
2002 4.37 4.10 3.60 3.42 2.39 3.50 0.45 0.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.57 2.40 1.90 2.23 3.95 3.42
2003 4.45 4.15 3.67 3.50 2.50 3.55 0.54 0.35 0.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.65 2.45 2.03 2.30 4.00 3.50
2004 6.50 0.25 6.68 6.35 6.45 6.78 3.57 2.64 1.20 1.52 1.81 1.00 2.00 1.50 0.20 0.70 3.10 6.25 2.34 6.55 4.10 6.60 5.65
2005 5.46 4.30 4.75 5.00 3.67 4.05 2.00 0.75 0.80 0.10 1.20 0.00 0.00 0.00 0.00 0.00 0.00 3.40 2.59 3.86 3.00 4.55 4.00
2006 5.46 4.50 4.75 4.66 3.67 4.05 2.00 0.73 0.80 0.10 1.20 0.00 0.00 0.00 0.00 0.00 0.00 3.40 2.58 3.43 2.56 4.49 3.80
2007 4.10 4.00 3.57 3.30 2.30 3.45 0.40 0.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.45 2.26 1.89 2.10 3.80 3.36
2008 3.76 4.50 4.85 5.00 4.05 4.10 2.00 0.95 0.80 0.10 1.20 0.00 0.00 0.00 0.00 0.00 0.35 3.43 2.59 4.07 3.05 4.60 4.25
2009 5.78 4.57 4.85 5.00 4.11 4.35 2.00 0.95 0.80 0.10 1.40 0.00 0.00 0.00 0.00 0.00 0.35 3.50 2.75 4.30 3.20 5.10 4.30
2010 4.48 4.20 3.76 3.55 2.56 3.65 0.62 0.43 0.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 2.48 2.20 2.30 4.00 3.56
2011 6.34 5.45 5.65 6.21 5.78 5.40 2.55 0.46 1.00 1.30 1.81 0.20 0.20 0.20 0.20 0.10 0.80 3.51 3.09 6.24 3.50 6.54 5.40
2012 4.79 5.30 4.55 3.68 3.10 3.74 0.70 0.50 0.60 0.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.20 2.50 2.50 2.40 4.22 3.56
2013 6.05 4.69 5.15 5.20 4.48 4.87 2.20 2.00 0.00 0.20 1.80 0.10 0.10 0.00 0.00 0.00 0.35 3.50 3.00 4.43 3.34 5.40 4.00
2014 6.20 5.27 5.53 5.63 5.27 5.37 2.45 2.20 0.90 0.20 1.80 0.20 0.10 0.10 0.00 0.00 0.35 3.51 3.06 4.45 3.46 6.30 4.36

Table 3.1.d The average daily rainfall

Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember
Tahun
I II I II I II I II I II I II I II I II I II I II I II I
1997 6.50 5.45 6.68 6.35 6.45 6.78 3.57 2.64 1.20 1.52 1.81 1.00 2.00 1.50 0.20 0.70 3.10 6.25 2.34 6.55 4.10 6.60 5.65
1998 6.34 5.30 5.65 6.21 5.78 5.40 2.55 0.46 1.00 1.30 1.81 0.20 0.20 0.20 0.20 0.10 0.80 3.51 3.09 6.24 3.50 6.54 5.40
1999 6.20 5.27 5.53 5.63 5.27 5.37 2.45 2.20 0.90 0.20 1.80 0.20 0.10 0.10 0.00 0.00 0.35 3.51 3.06 4.45 3.46 6.30 4.36
2000 6.05 4.69 5.15 5.20 4.48 4.87 2.20 2.00 0.00 0.20 1.80 0.10 0.10 0.00 0.00 0.00 0.35 3.50 3.00 4.43 3.34 5.40 4.00
2001 5.78 4.57 4.85 5.00 4.11 4.35 2.00 0.95 0.80 0.10 1.40 0.00 0.00 0.00 0.00 0.00 0.35 3.50 2.75 4.30 3.20 5.10 4.30
2002 5.46 4.50 4.85 5.00 4.05 4.10 2.00 0.95 0.80 0.10 1.20 0.00 0.00 0.00 0.00 0.00 0.35 3.43 2.59 4.07 3.05 4.60 4.25
2003 5.46 4.50 4.75 5.00 3.67 4.05 2.00 0.75 0.80 0.10 1.20 0.00 0.00 0.00 0.00 0.00 0.00 3.40 2.59 3.86 3.00 4.55 4.00
2004 5.38 4.44 4.75 4.66 3.67 4.05 2.00 0.73 0.80 0.10 1.20 0.00 0.00 0.00 0.00 0.00 0.00 3.40 2.58 3.43 2.56 4.49 3.80
2005 5.38 4.33 4.66 4.20 3.63 3.98 2.00 2.56 0.70 0.10 0.10 0.00 0.00 0.00 0.00 0.00 0.00 3.35 2.58 3.00 2.56 2.45 3.80
2006 4.79 4.30 4.60 4.15 3.22 3.98 0.95 0.54 0.70 0.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.30 2.56 2.60 2.43 4.34 3.65
2007 4.74 4.30 4.55 3.68 3.10 3.74 0.70 0.50 0.60 0.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.20 2.50 2.50 2.40 4.22 3.56
2008 4.48 4.20 3.76 3.63 2.56 3.67 0.62 0.43 0.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 2.48 2.30 2.35 4.18 3.56
2009 4.45 4.15 3.76 3.55 2.56 3.65 0.62 0.43 0.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 2.48 2.20 2.30 4.00 3.56
2010 4.37 4.10 3.67 3.50 2.50 3.55 0.54 0.35 0.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.65 2.45 2.03 2.30 4.00 3.50
2011 4.10 4.00 3.60 3.42 2.39 3.50 0.45 0.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.57 2.40 1.90 2.23 3.95 3.42
2012 3.76 4.00 3.57 3.30 2.30 3.45 0.40 0.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.45 2.26 1.89 2.10 3.80 3.36
2013 3.28 3.98 3.50 3.30 2.25 3.33 0.37 0.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 2.50 1.70 2.10 3.80 3.30
2014 3.10 0.25 3.45 3.20 2.20 3.20 0.34 0.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 2.00 1.67 2.00 3.50 3.20

Probabillity : 1 m/(n+1) = 80%


m/(18+1) = 80%
m = 15,2 rounding to above 16

So, use data in 2012


Desember
II Cara Peluang 1 m/(n+1) = 80%
5.10 m/(18+1) = 80%
5.67 m = 15,2 16
5.50
4.00 18
4.34 1
4.72 80
4.80 100
7.89 19
6.20 0.8
5.67 15.2
4.60
6.40
6.55
4.96
7.20
5.30
6.96
6.99

Desember
II
7.89
7.20
6.99
6.96
6.55
6.40
6.20
5.67
5.67
5.50
5.30
5.10
4.96
4.80
4.72
4.60
4.34
4.00
Table 3.1.c Calculation of Eto with penmen modify

V (a)
Months t (°C) R (%) n (hours) p q v w δ/c δ/(δ+c) c/(δ+c) e(s) e(a)
km/day m/s
Januari 25.3 82.0 5.4 86 0.995 5.75 17.54 0.18 -1.8 2.75 0.734 0.266 24.33 19.95
Februari 27.5 87.0 6.5 74 0.856 5.75 17.54 0.18 -1.8 3.15 0.759 0.241 27.58 23.99
Maret 26.6 84.0 5.6 60 0.694 5.75 17.54 0.18 -1.8 2.99 0.749 0.251 26.20 22.01
April 26.4 79.0 7.1 53 0.613 5.75 17.54 0.18 -1.8 2.95 0.747 0.253 25.90 20.46
Mei 27.0 77.0 10.1 49 0.567 5.75 17.54 0.18 -1.8 3.06 0.754 0.246 26.80 20.64
Juni 27.5 75.0 10 47 0.544 5.75 17.54 0.18 -1.8 3.15 0.759 0.241 27.58 20.68
Juli 26.0 72.0 9.8 65 0.752 5.75 17.54 0.18 -1.8 2.88 0.742 0.258 25.32 18.23
Agustus 26.3 75.0 10.6 62 0.718 5.75 17.54 0.18 -1.8 2.93 0.746 0.254 25.76 19.32
September 26.3 76.0 8.6 70 0.810 5.75 17.54 0.18 -1.8 2.93 0.746 0.254 25.76 19.57
Oktober 25.6 78.0 4.5 51 0.590 5.75 17.54 0.18 -1.8 2.81 0.737 0.263 24.75 19.30
November 26.0 75.0 3.4 47 0.544 5.75 17.54 0.18 -1.8 2.88 0.742 0.258 25.32 18.99
Desember 27.0 76.0 3.6 64 0.741 5.75 17.54 0.18 -1.8 3.06 0.754 0.246 26.80 20.37

Rtop R Eto
Months a b
(kg/d) (kg) (mm/d)
Januari 0.250 0.480 905.20 415.52 3.71 Note :
Februari 0.250 0.480 916.40 460.80 4.18 δ / c = V.t(a) + w
Maret 0.250 0.480 892.60 420.46 3.78 δ / (δ+c) = 1 / [(1/(δ/c))+1]
April 0.250 0.480 838.40 448.10 3.87 c / (δ+c) = 1 / [(δ/c)+1]
Mei 0.250 0.480 771.40 508.17 4.13
Juni 0.250 0.480 732.40 481.03 3.95 e(s) = p.e^( t(a) / q )
Juli 0.250 0.480 746.60 484.28 3.85 e(a) = RH.e(s)
Agustus 0.250 0.480 801.20 542.29 4.33
September 0.250 0.480 862.80 510.05 4.34 R = R(top) . [ a + b.(n/Nmax) ]
Oktober 0.250 0.480 898.20 383.32 3.52
November 0.250 0.480 897.00 342.31 3.36
Desember 0.250 0.480 897.60 348.88 3.53
Nmax n/Nmax

12.40 0.435
12.34 0.527
12.16 0.461
11.98 0.593
11.86 0.852
11.80 0.847
11.80 0.831
11.92 0.889
12.10 0.711
12.22 0.368
12.40 0.274
12.46 0.289
Table 3.1.e The average daily rainfall in year X

Total R (mm/d) R R (mm/m)


Months
days 1 months I II (mm/d) I II
January 31 3.76 4.00 3.88 116.56 124.00
February 28 3.57 3.30 3.44 99.96 92.40
March 31 2.30 3.45 2.88 71.30 106.95
April 30 0.40 0.25 0.33 12.00 7.50
May 31 0.00 0.00 0.00 0.00 0.00
June 30 0.00 0.00 0.00 0.00 0.00
July 31 0.00 0.00 0.00 0.00 0.00
August 30 0.00 0.00 0.00 0.00 0.00
September 31 0.00 2.45 1.23 0.00 75.95
October 30 2.26 1.89 2.08 67.80 56.70
November 31 2.10 3.80 2.95 65.10 117.80
December 30 3.36 4.60 3.98 100.80 138.00

AVERAGE
0
year X

R
(mm/m) 75.33333
120.28 84.5
96.18
89.13
9.75
0.00
0.00
0.00
0.00
37.98
62.25
91.45
119.40

52.20
Table 3.1.a Interpolation calculation of Rtop

Calculation value of Rtop


Months Lintang Rtop Lintang Rtop Lintang Rtop
a b c d e f
January 10 936 6 905.2 0 859
February 10 929 6 912.2 0 887
March 10 891 6 892.6 0 895
April 10 818 6 838.4 0 869
May 10 737 6 771.4 0 823
June 10 692 6 732.4 0 793
July 10 709 6 746.6 0 803
August 10 774 6 801.2 0 842
September 10 852 6 862.8 0 879
October 10 907 6 898.2 0 885
November 10 927 6 897.0 0 852
December 10 932 6 897.6 0 846

d=((c-e)/(a-e)x(b-f))+f

0
Table 3.1.b Interpolation calculation of Nmax

Calculation of Nmax
Months Lintang Nmax Lintang Nmax Lintang Nmax
a b c d e f
January 10 12.6 6 12.40 0 12.1
February 10 12.5 6 12.34 0 12.1
March 10 12.2 6 12.16 0 12.1
April 10 11.9 6 11.98 0 12.1
May 10 11.7 6 11.86 0 12.1
June 10 11.6 6 11.80 0 12.1
July 10 11.6 6 11.80 0 12.1
August 10 11.8 6 11.92 0 12.1
September 10 12.1 6 12.10 0 12.1
October 10 12.3 6 12.22 0 12.1
November 10 12.6 6 12.40 0 12.1
December 10 12.7 6 12.46 0 12.1
d=((c-e)/(a-e)x(b-f))+f
Tabel III.6 Schedule for Paddy - Corn - Stringbean

August September October November December January February March April May June July
I II I II I II I II I II I II I II I II I II I II I II I II

1.1 1.1 1.1 1.1 1.1 1.05 0.95 0 0.5 0.59 0.96 1.05 1.02 0.95 0.50 0.75 1.00 1.00 0.82 0.45

Paddy Corn Stringbean


Table 3.2.a Table Calculation effective rainfall for paddy

Total Eto Eto R (mm/hr) R R (mm/bln) R Re


Months % Ratio % Reff
Days 1 month (mm/d) (mm/m) I II (mm/d) I II (mm/m) (mm/d) (mm/m)
August 30 4.343 130.304 0.00 2.45 1.23 0.00 73.50 36.75 100% 100% 1.23 36.75
September 31 3.520 109.123 2.26 1.89 2.08 70.06 58.59 64.33 100% 100% 2.08 64.33
October 30 3.364 100.919 2.10 3.80 2.95 63.00 114.00 88.50 100% 100% 2.95 88.50
November 31 3.535 109.577 3.36 4.60 3.98 104.16 142.60 123.38 100% 100% 3.98 123.38
December 30 3.710 111.302 3.76 4.00 3.88 112.80 120.00 116.40 100% 100% 3.88 116.40
January 31 4.181 129.618 3.57 3.30 3.44 110.67 102.30 106.49 100% 100% 3.44 106.49
February 28 3.775 105.701 2.30 3.45 2.88 64.40 96.60 80.50 100% 100% 2.88 80.50
March 31 3.867 119.862 0.40 0.25 0.33 12.40 7.75 10.08 100% 100% 0.33 10.08
Ʃ Ratio = 800%
Table 3.2.a Table calculation effective rainfall for Corn

Eto Etc Effective Correction


Month kc
(mm/Day) (mm/Month) (mm/Month) Shelter Factor
I Tillage Period
January 3.710 111.302
II 0.50 55.651 100 1.02
I 0.59 69.074
February 4.181 117.074 100 1.02
II 0.96 112.391
I 1.05 122.878
March 3.775 117.027 100 1.02
II 1.02 119.367
I 0.95 110.1957463 100 1.02
April 3.867 115.996
II Harvest Time

Table 3.2.b Table calculation effective rainfall for Stringbean

Eto Etc Effective Corection


Month kc
(mm/Day) (mm/Month) (mm/Month) shelter factor
April II 3.867 115.996 Tillage Period
I 0.5
May 4.131 128.069 100 1.02
II 0.75 96.051
I 1.00 128.069
June 3.949 118.457 100 1.02
II 1.00 118.457
I 0.82 97.134
July 3.852 119.405 100 1.02
II 0.45 53.732
August I Harvest Time
l for Corn

R Re
(mm/Month) (mm/Month) (mm/Day)
Tillage Period
23.009 23.47 0.76
23.467 23.94 0.85
24.675 25.17 0.90
25.190 25.69 0.83 interpolasi tabel
25.564 26.08 0.84
0 0.00
Harvest Time

Etc hitung
or Stringbean

R Re
(mm/Month) (mm/Month) (mm/Day) 57.18
Tillage Period 63.96
0 0.00 86.53
23.236 23.70 0.76 99.65
24.382 24.87 0.83 105.18
25.801 26.32 0.88
26.297 26.82 0.87
25.543 26.05 0.84
Harvest Time

Etc hitung

60.54
77.49
108.69
116.02
104.88
80 89.5 90
70 0.823 0.8705 0.873
78.7 0.82735 0.838832 0.87735
80 0.828 0.8341 0.878

interpolasi tabel

Tabel III.2.c Calculation effective daily rainfall for Palawija (Onion)


Etc tabel Mean R
Months

25 33.630 37.5
25 16 21.523 24 23.009 February I
50 17 22.523 25 23.467 II
75 18 24.214 27 24.675 March I
100 19 25.214 28 25.190 II
125 20 26.904 30 25.564 April I
150 21 27.904 31 II
175 23 29.214 32 May I
200 24 30.214 33
225 25 31.904 35 Tabel III.2.c Calculation effective daily rainfall for Palawija (Onion)
250 25 33.975 38 Months

Etc tabel Mean R May II


June I
25 33.630 37.5 II
25 16 21.523 24 23.236 July I
50 17 22.523 25 24.382 II
75 18 24.214 27 25.801 August I
100 19 25.214 28 26.297 II
125 20 26.904 30 25.543
150 21 27.904 31
175 23 29.214 32
200 24 30.214 33 Etc hitung
225 25 31.904 35
250 25 33.975 38
64.99
60.18
81.42
111.10
117.28

buncis kp Etc Bin


Crops Month Eto (mm/mth) (mm/mth) Effective
(mm/day) 128.0685Land Processing
Corn June I 4.13 118.4566 0.5 59.23 100
II 3.95 0.51 60.41
II 119.405 0.69 82.39 100
July I 3.85 0.90 107.46
II 134.3148 0.95 127.60 100
August I 4.33

the first bawang kp Etc Bin


Crops Month Eto (mm/mth) (mm/mth) Effective
(mm/day) 3150 0 0.00 100
Onion February II 21.000 4025 0 0.00 100
March I 23.000 0.00 0.00
II 4800 0.00 0.00 100
April I 24.000 0.00 0.00
II
rainfall for Palawija (Onion)

Eto kc Etc Bin Correction R

(mm/d) (mm/m) (mm/m) Effective Factor (mm/m) Re


4.18 121.26 Land processing (mm/m) (mm/day)
0.50 60.63 100 1.02 23.519
3.78 117.03 0.51 59.68 23.214 23.99 0.83
100 1.02
0.69 80.75 24.473 23.68 0.76
3.87 116.00 0.90 104.40 25.791 24.96 0.81
100 1.02
0.95 110.20 26.198 26.31 0.88
4.13 128.07 masa panen 26.72 0.89

rainfall for Palawija (Onion)


Eto kc Etc Bin Correction R
(mm/d) (mm/m) (mm/m) Effective Factor (mm/m) Re
4.13 128.07 Land processing (mm/m) (mm/day)
3.95 118.46 0.50 59.23 100 1.02 22.864
0.64 75.81 23.906 23.32 0.78
100 1.02
3.85 119.40 0.89 106.27 25.638 24.38 0.81
0.95 113.43 26.122 26.15 0.84
100 1.02
4.33 134.31 0.88 118.20 25.653 26.64 0.86
masa panen 26.17 0.84

interpolasi tabel
Etc tabel Mean
R
25 33.630 37.5
25 16 #DIV/0! 24 #DIV/0!
50 17 #DIV/0! 25 #DIV/0!
75 18 #DIV/0! 27 #DIV/0!
100 19 #DIV/0! 28 #DIV/0!
125 20 #DIV/0! 30 #DIV/0!
150 21 #DIV/0! 31
175 23 #DIV/0! 32
200 24 #DIV/0! 33
225 25 #DIV/0! 35
250 25 #DIV/0! 38

Factor R Re
Correction (mm/mth) (mm/mth) (mm/day)

1.02 #VALUE! #VALUE! #VALUE!


#VALUE! #VALUE! #VALUE!
1.02 #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
1.02 #VALUE! #VALUE! #VALUE!

Factor R Re
Correction (mm/mth) (mm/mth) (mm/day)
1.02 #VALUE! #VALUE! #VALUE!
1.02 #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
1.02 #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
Tabel III.3 Hitungan Air Sawah (Padi,Padi, Kedelai)

Banyak Paruh Eto Eo P Re


Bulan M K
Hari 1 Bulan bulan (mm/hr) (mm/hr) (mm/hr) (mm/hr)
I
September 31 4.343 4.778 2 6.778 0.840 1.225
II
I
October 30 3.520 3.872 2 5.872 0.705 2.075
II
I
November 31 3.364 3.700 2 5.700 0.707 2.950
II
I
December 31 3.535 3.888 2 5.888 0.730 3.980
II
I
January 28 #REF! #REF! 2 #REF! #REF! #REF!
II
I
Maret 31 #REF! #REF! 2 #REF! #REF! #REF!
II
I
April 30 #REF! #REF! 2 #REF! #REF! #REF!
II
I
Mei 31 #REF! #REF! 2 #REF! #REF! #REF!
II
I 0.000
Juni 30 3.949 1.974 2 3.974 1.192
II 0.757
I 0.855
Juli 31 3.852 1.926 2 3.926 2.434
II 0.899
I 0.829
Agustus 31 4.333 2.166 2 4.166 2.583
II 0.841
I 0.000
September 30 4.343 2.172 2 4.172 2.503
II #REF!

Keterangan : Etc = kc . Eto


Masa Pengolahan Tanah :
NFR = IR - Re
Masa Pertumbuhan Tanaman :
NFR = Etc + P - Re +WLR ( Padi )
NFR = Etc + P - Re ( Palawija )
wah (Padi,Padi, Kedelai)

IR Etc NFR
WLR Kc
(mm/hr) (mm/hr) (mm/hr) (lt/dt.ha)
Pengolahan - -
11.91781 10.693 1.238
Tanah - -
- 1.1 3.872 5.497 0.636
1.7

PADI I
- 1.1 3.872 5.497 0.636
- 1.05 3.532 4.282 0.496
1.7
- 1.05 3.532 4.282 0.496
1.7 - 0.95 3.358 3.078 0.356
Panen - 0 0.000 0.000 0.000
Pengolahan - -
#REF! #REF! #REF!

PALAWIJA (Kedelai)
Tanah - -
- 1.1 #REF! #REF! #REF!
1.7
- 1.1 #REF! #REF! #REF!
- 1.05 #REF! #REF! #REF!
1.7
- 1.05 #REF! #REF! #REF!
1.7 - 0.95 #REF! #REF! #REF!
Panen - 0 #REF! 0.000 0.000
Pengolahan - - 5.704 0.660
5.704422 PALAWIJA (Kedelai)
- 0.50 1.974 3.217 0.372
- 0.75 2.889 4.034 0.467
-
- 1.00 3.852 2.953 0.342
- 1.00 4.333 5.504 0.637
-
- 0.82 3.553 2.712 0.314
- - 0.45 1.955 3.955 0.458
Panen - 0 0.000 #REF! #REF!
Table 3.3 Wetland Water Needs ( Paddy, Corn, Stringbe

Num. Half Eto Eo P Re


Month M K
Day Month (mm/day) (mm/day) (mm/day) (mm/day)
I
September 30 4.778 6.778 0.813 1.23
II 4.34
I
October 31 3.52 3.872 5.872 0.728 2.08
II
I
November 30 3.36 3.700 5.700 0.684 2.95
II
I
December 31 3.53 3.888 5.888 0.730 3.98
II
I
January 30 3.71 4.081 6.081 0.705 3.88
II
I 0
February 29 4.18 2.091 4.091 2.454
II 0.76
2
I 0.85
March 31 3.78 1.888 3.888 2.410
II 0.90
I 0.83
April 30 3.87 1.933 3.933 2.360
II 0.84
I 0.00
May 31 4.13 2.066 4.066 2.521
II 0.00
I 0.76
June 30 3.95 1.974 3.974 2.385
II 0.83
I 0.88
July 31 3.85 1.926 3.926 2.434
II 0.87
I 0.84
August 30 4.33 2.166 4.166 2.500
II 0.00
Needs ( Paddy, Corn, Stringbean)

WLR IR Etc NFR NFR


Kc Obs
(mm/day) (mm/day) (mm/day) (mm/day) (mm/m)
Land
12.17 - - 10.95 1.27
Processing
1.7 1.1 3.872 5.50 0.64
11.35
1.7 1.1 3.872 7.57 0.88

Paddy
1.7 1.1 3.700 4.45 0.52
11.50
1.7 1.1 3.700 7.40 0.86
1.7 1.1 3.888 3.61 0.42
11.36
1.7 1.05 3.711 7.41 0.86
1.7 0.95 3.525 3.34 0.39
12.01
Harvest 0 0.000 0.00 0.00
Land P - - 4.47 0.52
4.47
1.7 0.5 2.091 3.334 0.39
1.7 0.51 1.925 3.070 0.36

Onion
4.27
1.7 0.69 2.605 3.706 0.43
1.7 0.9 3.480 4.651 0.54
4.34
1.7 0.95 3.867 5.025 0.58
Harvest 0 0.000 0.000 0.00
4.42
Land P - - 4.42 0.51
1.7 0.5 2.066 3.30 0.38
4.38
Stringbean

1.7 0.64 2.527 3.70 0.43


1.7 0.89 3.428 4.55 0.53
4.30
1.7 0.95 3.659 4.79 0.55
1.7 0.88 3.813 4.97 0.58
4.54
Harvest 0 0 0.00 0.00

10.95 1.27
Table 3.4.1 Capacity of plan discharge distribution

Wide Area NFR Efisiensi


Channel
( ha ) (lt/dt.ha) %
BA3 90 1.27 80
BR1 95 1.27 80
BS1 110 1.27 80
BS2 95 1.27 80
BR2 110 1.27 80
BR3 90 1.27 80
BS3 95 1.27 80
BK2 110 1.27 80
BK3 115 1.27 80
BK4 90 1.27 80

Table 3.4.2 Capacity of plan discharge primary channel

Nama NFR Efisiensi Q


Saluran (lt/s.ha) % (lt/s)
RA1 1.27 95 2471.88
RA2 1.27 95 1376.69
RA3 1.27 95 621.88
RA4 1.27 95 133.37
n discharge distribution

Q Q
(lt/s) (m3/s)
142.53 0.14
150.45 0.15
174.21 0.17
150.45 0.15
174.21 0.17
142.53 0.14
150.45 0.15
174.21 0.17
182.13 0.18
142.53 0.14

primary channel

Q
(m3/s)
2.47
1.38
0.62
0.13
Table 3.5.1 Primary Channel Dimention

Q v Fb A h b P R
Channel n b/h m I
(m³/s) (m/s) (m) (m²) (m) (m) (m) (m)
RA1 2.47 42 2.50 0.582 1.50 0.60 4.244 1.030 2.575 6.289 0.675 1010.778686
RA2 1.38 44 2.00 0.542 1.00 0.50 2.541 0.920 1.841 4.444 0.572 1197.295436
RA3 0.62 46 1.00 0.457 1.00 0.30 1.360 0.825 0.825 3.157 0.431 1360.101798
RA4 0.13 47 1.00 0.294 1.00 0.30 0.453 0.476 0.476 1.822 0.249 1225.250697
STRICLER
Table 3.5.2 Secondary 1 Channel Dimention

Q v Fb A h b P R
Channel n b/h m I
(m³/s) (m/s) (m) (m²) (m) (m) (m) (m)
RR4 0.18 0.0166 1.00 0.311 1.00 0.30 0.586 0.541 0.541 2.073 0.283 0.000143
RR3 0.37 0.0166 1.50 0.385 1.00 0.40 0.960 0.620 0.930 2.683 0.358 0.000160
RR2 0.57 0.0166 2.00 0.464 1.00 0.50 1.227 0.639 1.279 3.088 0.397 0.000203
RR1 0.83 0.0166 2.00 0.505 1.00 0.50 1.635 0.738 1.476 3.565 0.459 0.000199

Table 3.5.4 Distribution Channel Dimention

Q v Fb A h b P R I
Channel n b/h m
(m³/s) (m/s) (m) (m²) (m) (m) (m) (m)
BT1ka 0.14 0.0210 1.00 0.298 1.00 0.30 0.479 0.489 0.489 1.874 0.256 0.000241
BT2ka 0.15 0.0210 1.00 0.300 1.00 0.30 0.501 0.501 0.501 1.917 0.262 0.000238
BW1ka 0.17 0.0210 1.00 0.308 1.00 0.30 0.565 0.532 0.532 2.036 0.278 0.000231
BW2ki 0.15 0.0210 1.00 0.300 1.00 0.30 0.501 0.501 0.501 1.917 0.262 0.000238
BW3ka 0.17 0.0210 1.00 0.308 1.00 0.30 0.565 0.532 0.532 2.036 0.278 0.000231
BW4ka 0.14 0.0210 1.00 0.245 1.00 0.30 0.582 0.539 0.539 2.065 0.282 0.000143
BW5ka 0.15 0.0210 1.00 0.300 1.00 0.30 0.501 0.501 0.501 1.917 0.262 0.000238
BD1ka 0.17 0.0210 1.00 0.308 1.00 0.30 0.565 0.532 0.532 2.036 0.278 0.000231
BD2ki 0.18 0.0210 1.00 0.311 1.00 0.30 0.586 0.541 0.541 2.073 0.283 0.000229
BD3ka 0.14 0.0210 1.00 0.324 1.00 0.30 0.440 0.469 0.469 1.796 0.245 0.000301

Q v Fb A h b P R I
Saluran n b/h m
(m³/dtk) (m/dtk) (m) (m²) (m) (m) (m) (m)
RT3 0.13 0.0210 1.00 0.294 1.00 0.30 0.453 0.476 0.476 1.822 0.249 0.000245
RW6 0.13 0.0210 1.00 0.292 1.00 0.30 0.434 0.466 0.466 1.782 0.243 0.000248
RD4 0.13 0.0210 1.00 0.295 1.00 0.30 0.454 0.476 0.476 1.824 0.249 0.000244

Table 3.5.3 Secondary 2 Channel Dimention

Q v Fb A h b P R
Channel n b/h m I
(m³/s) (m/s) (m) (m²) (m) (m) (m) (m)
RD4 0.13 0.0166 1.00 0.295 1.00 0.30 0.454 0.476 0.476 1.824 0.249 0.000153
RD3 0.31 0.0166 1.00 0.353 1.00 0.40 0.868 0.659 0.659 2.523 0.344 0.000143
RD2 0.54 0.0166 2.00 0.472 1.00 0.40 1.152 0.620 1.239 2.992 0.385 0.000219
RD1 0.80 0.0166 2.00 0.509 1.00 0.00 1.565 0.722 1.445 3.488 0.449 0.000208
Alinement pertama Alinement kedua
data α = 30o
data α = 30
b = 0.824595 m b = 1.445
m = 1.00 m m = 1.00
h = 0.824595 m h = 0.722
RT3 RD1
penyelesaian penyelesaian
B = 2.4737859 m B = 2.889158 m
R = 19.790287 m R = 23.11326 m
TP = 0.6981257 m TP = 0.815348 m
L = 10.36217 m L = 12.10208 m
PT = 5.3027914 m PT = 6.19318 m
data α = 30 o data α = 30
b = 0.47644 m b = 0
m = 1.00 m m = 0.00
h = 0.47644 m h = 0
RD4 RW1
penyelesaian penyelesaian
B = 1.4293 m B = 0.0000 m
R = 11.43457 m R = 0.0000 m
TP = 0.4034 m TP = 0 m
L = 5.987127 m L = 0.0000 m
PT = 3.0639 m PT = 0 m
data α = 30 o data α = 30
b = 1.476475 m b = 1.28
m = 1.00 m m = 1
h = 0.738238 m h = 0.63947
RW4 RW5
penyelesaian penyelesaian
B = 2.9530 m B = 2.557879 m
R = 23.623601 m R = 20.4630 m
TP = 0.8334 m TP = 0.721858 m
L = 12.3693 m L = 10.7144 m
PT = 6.3299 m PT = 5.4831 m
Alinement ketiga Alinement keempat
o
data α = 30 o
data α = 30
m b = 1.239375 m b = 0.658941
m m = 1.00 m m = 1.00
m h = 0.619688 m h = 0.658941
RD2 RD3
penyelesaian penyelesaian
B = 2.47875 m B = 1.976822 m
R = 19.83 m R = 15.81458 m
TP = 0.699527 m TP = 0.557878 m
L = 10.38296 m L = 8.280494 m
PT = 5.313433 m PT = 4.237504 m
o
data α = 30 o data α = 30
m b = 0m b = 1.476475
m m = 1.0000 m m = 1.00
m h = 0m h = 0.738238
RW2 RW3
penyelesaian penyelesaian
B = 0 m B = 2.95295 m
R = 0 m R = 23.6236 m
TP = 0 m TP = 0.83335 m
L = 0 m L = 12.36929 m
PT = 0 m PT = 6.329925 m
o
data α = 30 o data α = 30
m b = 1.278939 m b = 0.929714
m m = 1.00 m m = 1.00
m h = 0.63947 m h = 0.61981
RW6 RW7
penyelesaian penyelesaian
B = 2.557879 m B = 2.169333 m
R = 20.46303 m R = 17.35467 m
TP = 0.721858 m TP = 0.612206 m
L = 10.71442 m L = 9.086882 m
PT = 5.483053 m PT = 4.650169 m
o

m
m
m

m
m
m

o
Sliding Door Plan and Measuring Instrument
Q V Fb h b hlab b Lap h max h min h CR
Bangunan
(m³/dtk) (m/dtk) m m m m m m m m
RT1 2.47 0.582 0.60 1.030 2.575 3.175 1.904 0.832 0.656 0.415
RT2 1.38 0.542 0.50 0.920 1.841 2.341 1.187 0.772 0.609 0.370
RT3 0.62 0.457 0.30 0.825 0.825 1.125 0.598 0.718 0.566 0.332
RT4 0.13 0.294 0.30 0.476 0.476 0.776 0.222 0.497 0.392 0.192
RW1 0.00 0.000 0.00 0.000 0.000 0.000 #DIV/0! #DIV/0! #DIV/0! #DIV/0!
RW2 0.00 0.000 0.00 0.000 0.000 0.000 #DIV/0! #DIV/0! #DIV/0! #DIV/0!
RW3 0.83 0.505 0.50 0.738 1.476 1.976 0.887 0.667 0.526 0.297
RW4 0.57 0.464 0.50 0.639 1.279 1.779 0.706 0.606 0.478 0.257
RW5 0.37 0.385 0.40 0.620 0.930 1.330 0.473 0.593 0.468 0.249
RW6 0.18 0.311 0.30 0.541 0.541 0.841 0.267 0.542 0.427 0.218
RD1 0.80 0.509 0.00 0.722 1.445 1.445 0.876 0.657 0.518 0.291
RD2 0.54 0.472 0.40 0.620 1.239 1.639 0.696 0.593 0.468 0.249
RD3 0.31 0.353 0.40 0.659 0.659 1.059 0.370 0.618 0.487 0.265
RD4 0.13 0.295 0.30 0.476 0.476 0.776 0.223 0.498 0.392 0.192

Table 3.8 Building Plan for Tapping

Q V fb h b h Lap h max h min b Lab h CR


Building
(m³/dtk) (m/dtk) (m) (m) (m) (m) (m) (m) (m) (m)
BT1ka 0.14 0.298 0.30 0.489 0.489 0.789 0.231 0.507 0.400 0.197
BT2ka 0.15 0.300 0.30 0.501 0.501 0.801 0.238 0.515 0.406 0.201
BW1ka 0.17 0.308 0.30 0.532 0.532 0.832 0.260 0.536 0.422 0.214
BW2ka 0.15 0.300 0.30 0.501 0.501 0.801 0.238 0.515 0.406 0.201
BW3ka 0.17 0.308 0.30 0.532 0.532 0.832 0.260 0.536 0.422 0.214
BW4ka 0.14 0.245 0.30 0.539 0.539 0.839 0.210 0.541 0.426 0.217
BW5ka 0.15 0.300 0.30 0.501 0.501 0.801 0.238 0.515 0.406 0.201
BD1ka 0.17 0.308 0.30 0.532 0.532 0.832 0.260 0.536 0.422 0.214
BD2ka 0.18 0.311 0.30 0.541 0.541 0.841 0.267 0.542 0.427 0.218
BD3ka 0.14 0.324 0.30 0.469 0.469 0.769 0.241 0.493 0.388 0.189

Tabel III. Perencanaan Bangunan Bagi Sadap


Q V Fb h b b Lap h Lap
Bangunan μ ƶ
(m³/dtk) (m/dtk) m m m m m
RT1 2.472 0.582 0.60 1.030 2.575 0.680 1.630 0.9 0.1
RT2 1.377 0.542 0.50 0.920 1.841 0.576 1.420 0.9 0.1
RT3 0.622 0.457 0.30 0.825 0.825 0.579 1.125 0.9 0.1
RT4 0.133 0.294 0.30 0.476 0.476 0.299 0.776 0.9 0.1
RW1 0.000 0.000 0.00 0.000 0.000 #DIV/0! 0.000 0.9 0.1
RW2 0.000 0.000 0.00 0.000 0.000 #DIV/0! 0.000 0.9 0.1
RW3 0.826 0.505 0.50 0.738 1.476 0.475 1.238 0.9 0.1
RW4 0.569 0.464 0.50 0.639 1.279 0.408 1.139 0.9 0.1
RW5 0.370 0.385 0.40 0.620 0.930 0.378 1.020 0.9 0.1
RW6 0.182 0.311 0.30 0.541 0.541 0.338 0.841 0.9 0.1
RD1 0.797 0.509 0.00 0.722 1.445 0.471 0.722 0.9 0.1
RD2 0.543 0.472 0.40 0.620 1.239 0.404 1.020 0.9 0.1
RD3 0.307 0.353 0.40 0.659 0.659 0.420 1.059 0.9 0.1
RD4 0.134 0.295 0.30 0.476 0.476 0.300 0.776 0.9 0.1
b'
m
1.904
1.187
0.598
0.222
#DIV/0!
#DIV/0!
0.887
0.706
0.473
0.267
0.876
0.696
0.370
0.223
Table 3.10 Calculation of Culvert

Data Saluran Inlet Outlet Kehilangan Tenaga Akibat Gesekan Keh. Tng Total
Saluran Q V1 b h V2 h1 h0 A b P L hf ∑ hr
Ks R
(m3/dtk) (m/dtk) (m) (m) (m/dtk) (m) (m) (m2 ) (m) (m) (m) (m) (m)
CB1 2.472 0.582396 42.0000 2.575 1.030 1.5 0.049 0.097 1.648 1.600 3.660 10.0 0.450 0.000862 0.147
CB2 0.622 0.457293 44.0000 0.825 0.825 1.5 0.052 0.104 0.415 0.503 2.152 10.0 0.193 0.000158 0.156
CB3 0.370 0.384767 0.0166 0.541 0.541 1.5 0.054 0.107 0.246 0.455 1.538 10.0 0.160 0.000109 0.161
CB4 0.543 0.471719 0.0166 0.000 0.000 1.5 0.052 0.103 0.362 #DIV/0! #DIV/0! 10.0 #DIV/0! #DIV/0! #DIV/0!
CB5 0.307 0.353484 0.0166 0.659 0.659 1.5 0.054 0.108 0.205 0.311 1.628 10.0 0.126 0.000067 0.163
Tabel III. Perencanaan Siphon

Data saluran
Saluran
Q V b h A P R
SB1 0.826 0.505 1.476 0.738 1.635 3.565 0.459

Table 3.11 Calculation of Syphon

Data of channel
Channel Discharge (Q) b h fb H V1 V2
m3/dtk (m) (m) (m) (m) (m/dtk) (m/dtk)
SB1 0.826 1.476 0.738 0.500 1.238 0.505 1.50

Head Loss
Channel
hf1 hf2 hf3 hf4 hf5 hf6 ∑ hf
SB1 166798.19103 0.139 0.00010 0.00650 0.447 0.559 166799.343
hf hi hs hb ho ho' Ʃh
0.2804 0.139016 0.000293 0.001144 0.002275 0.00358 0.4267

n of Syphon

Planning of syphon
α θ
A h R fi
K
° ° (m²) (m) (m)
30 30 0.017 1.635 1.107 0.316 0.111
µ

0.9
Length of Distance High of Countour Elevation of
Channel Point
a x Up Bottom Original Soil
T1 1.40 2.60 155.00 150.00 152.69
T2 1.40 2.70 155.00 150.00 152.59
RT1
T3 1.10 2.60 155.00 150.00 152.12
T4 0.90 2.50 155.00 150.00 151.80
Culvert in 0.70 2.40 155.00 150.00 151.46
Culvert out 0.50 2.40 155.00 150.00 151.04
RT2 T5 0.40 2.30 155.00 150.00 150.87
T6 4.50 4.60 150.00 145.00 149.89
T7 3.90 4.10 150.00 145.00 149.76
BT1ka 4.40 4.80 150.00 145.00 149.58
PRIMER T8 4.40 4.80 150.00 145.00 149.58
T9 4.30 4.90 150.00 145.00 149.39
T10 5.30 6.20 150.00 145.00 149.27
RT3 T11 3.10 3.70 150.00 145.00 149.19
Culvert in 3.50 4.20 150.00 145.00 149.17
Culvert out 3.90 5.00 150.00 145.00 148.90
T12 3.50 4.90 150.00 145.00 148.57
T13 2.00 3.40 150.00 145.00 147.94
BT2ka 1.90 3.60 150.00 145.00 147.64
RT4 T14 1.90 3.60 150.00 145.00 147.64
T15 1.90 4.20 150.00 145.00 147.26
BW1Ka 8.00 8.50 150.00 145.00 149.71
RW1
W1 8.00 8.50 150.00 145.00 149.71
W2 4.00 8.50 150.00 145.00 147.35
W3 2.00 8.50 150.00 145.00 146.18
RW2 W4 0.60 7.20 150.00 145.00 145.42
W5 0.20 4.30 150.00 145.00 145.23
W6 8.20 9.00 145.00 140.00 144.56
BW2Ka 8.50 10.50 145.00 140.00 144.05
Shipon in 8.50 10.50 145.00 140.00 144.05
W7 6.00 8.00 145.00 140.00 143.75
RW3
Shipon out 5.00 11.00 145.00 140.00 142.27
W8 1.00 7.00 145.00 140.00 140.71
W9 0.40 4.50 145.00 140.00 140.44
SEKUNDER 1
BW3Ka 5.00 6.00 140.00 135.00 139.17
RW4
W10 5.00 6.00 140.00 135.00 139.17
BW4Ka 6.00 9.00 140.00 135.00 138.33
W11 6.00 9.00 140.00 135.00 138.33
W12 3.00 10.00 140.00 135.00 136.50
W13 0.10 0.10 135.00 135.00 135.00
RW5
Culvert in 4.00 4.30 135.00 130.00 134.65
RW5
Culvert out 4.00 4.40 135.00 130.00 134.55
W14 7.00 8.50 135.00 130.00 134.12
W15 6.20 10.00 135.00 130.00 133.10
BW5Ka 4.00 8.00 135.00 130.00 132.50
RW6 W16 4.00 8.00 135.00 130.00 132.50
W17 1.50 7.70 135.00 130.00 130.97
D1 1.00 3.60 150.00 145.00 146.39
D2 4.60 4.80 145.00 140.00 144.79
RD1
D3 3.60 4.80 145.00 140.00 143.75
D4 4.00 6.00 145.00 140.00 143.33
BD1Ka 2.50 5.90 145.00 140.00 142.12
D5 2.50 5.90 145.00 140.00 142.12
D6 0.80 2.10 145.00 140.00 141.90
D7 1.70 5.90 145.00 140.00 141.44
Culvert in 6.50 6.50 140.00 135.00 140.00
RD2
Culvert out 6.50 6.70 140.00 135.00 139.85
D8 7.40 7.80 140.00 135.00 139.74
SEKUNDER 2 D9 2.30 3.80 140.00 135.00 138.03
D10 1.40 3.80 140.00 135.00 136.84
D11 4.10 4.50 135.00 130.00 134.56
BD2Ka 3.00 4.50 135.00 130.00 133.33
D12 3.00 4.50 135.00 130.00 133.33
RD3 Culvert in 3.00 4.50 135.00 130.00 133.33
Culvert out 3.00 4.50 135.00 130.00 133.33
D13 2.00 4.50 135.00 130.00 132.22
BD3Ka 0.40 3.00 135.00 130.00 130.67
D14 0.40 3.00 135.00 130.00 130.67
RD4
D15 0.30 3.20 135.00 130.00 130.47
D16 0.30 3.20 135.00 130.00 130.47
Table 3.6 Calculation of Channel Elevation

Data of Channel Elevasi


Channel Point
X I Plan I field Fb h Original Soil Bottom Soil Water Elevation
T1 100 152.69 102332273.67 102332274.70
T2 100 152.59 102332273.57 102332274.60
RT1 ### 0.002231 0.6 1.030
T3 100 152.12 102332273.10 102332274.13
T4 100 151.80 102332272.78 102332273.81
Culvert in 40 151.46 102332272.44 102332273.47
RT2
Culvert out 24.6 151.04 102332272.02 102332273.05
T5 35.4 ### 0.005674 0.5 0.920 150.87 102332271.85 102332272.88
T6 100 149.89 102332270.87 102332271.90
T7 100 149.76 102332270.74 102332271.77
51.29 149.58 102332270.56 102332271.59
PRIMER

BT1Ka
T8 48,71 149.58 143521841.85 143521842.77
T9 100 149.39 143521841.65 143521842.57
T10 100 149.27 185140795.73 185140796.55
RT3 T11 100 ### 0.002979 0.3 0.825 149.19 185140795.64 185140796.47
Culvert in 34.00 149.17 185140795.62 185140796.44
Culvert out 19.00 148.90 185140795.35 185140796.18
T12 47.00 148.57 185140795.02 185140795.85
T13 100 147.94 185140794.39 185140795.22
BT2ka 88.44 147.64 185140794.09 185140794.92
RT4 T14 11.56 ### 0.001885 0.3 0.476 147.64 185140794.09 185140794.92
T15 100 147.26 185140793.71 185140794.54
W1 100 149.71 185140796.16 185140796.98
RW1 0 0 0.0 0.000
BW1Ka 79.63 149.71 185140796.16 185140796.98
W2 20.37 147.35 150219139.21 150219139.69
W3 100 146.18 150219138.04 150219138.51
RW2 W4 100 0 0.00665458 0.0 0.000 145.42 150219137.28 150219137.75
W5 100 145.23 145.23 145.23
W6 100 144.56 144.56 144.56
BW2Ka 38.89 144.05 144.05 144.05
Shipon in 21.09 144.05 144.05 144.05
W7 40.02 143.75 143.75 143.75
RW3 0.0001987 0.012010582 0.5 0.738
Shipon out 4.35 142.27 142.27 142.27
SEKUNDER 1

W8 95.65 140.71 140.71 140.71


W9 100 140.44 140.44 140.44
BW3Ka 16.45 139.17 139.17 139.17
RW4 0.000203 0.000000 0.5 0.639
W10 83.55 139.17 139.17 139.17
BW4Ka 2.00 138.33 138.33 138.33
W11 98 138.33 138.33 138.33
W12 100 136.50 136.50 136.50
RW5 W13 100 0.0001605 0.010539216 0.4 0.620 135.00 135.00 135.00
Culvert in 12.5 134.65 134.65 134.65
Culvert out 23.7 134.55 134.55 134.55
W14 63.8 134.12 134.12 134.12
W15 100 133.10 133.10 133.10
BW5Ka 18.65 132.50 132.52 133.26
RW6 0.0001433 0.00708658 0.30 0.541
W16 81.35 132.50 132.52 133.26
W17 100 130.97 131.00 131.74
D1 100 146.39 146.41 147.15
RD1 D2 100 144.79 144.82 145.55
0.000208 0.007639 0.0 0.722
D3 100 143.75 143.77 144.51
D4 100 143.33 143.36 144.10
BD1Ka 74.12 142.12 142.14 142.88
D5 25.88 142.12 142.14 142.88
D6 100 141.90 141.93 142.57
D7 100 141.44 141.46 142.10
Culvert in 50.6 140.00 140.02 140.66
RD2 23.8 0.000219 0.010804 0.4 0.620 139.85 139.87 140.49
Culvert out
SEKUNDER 2

D8 25.6 139.74 139.76 140.38


D9 100 138.03 138.04 138.66
D10 100 136.84 136.86 137.48
D11 100 134.56 134.57 135.19
BD2Ka 50.77 133.33 133.35 133.97
D12 49.23 133.33 133.35 133.89
RD3 Culvert in 5.96 0.000143 0.005556 0.4 0.659 133.33 133.35 133.89
Culvert out 25.1 133.33 133.35 133.89
D13 68.94 132.22 132.23 132.78
BD3Ka 80.5 130.67 130.68 131.22
D14 19.5 130.67 130.68 131.40
RD4 0.000153 0.000660 0.3 0.476
D15 100 130.47 130.48 131.21
D16 100 130.47 130.48 131.21
h Qr Q' I B K A P R
2.6167 510 578.9189 0.000358 150 42 392.510 155.2335 2.529

= didapat dari soal


= rumus
= variabel trial

Mencari h banjir
1. Masukkan semua data di cell berwarna biru
2. Pilih Goal Seek. Isi "set cell" dengan " Q' ", "to value" isi dengan nilai sama dengan "Qr", "by changing cell"
3. Klik OK, akan didapat nilai h banjir
Icr v
0.000288 1.475

gan "Qr", "by changing cell" dengan "h"


Data-data
Elevasi sungai tertinggi = 155 156.500 =
Elevasi dasar saluran = 155 =
Kedalaman sungai induk = 6 149.00 =
Tambahan elevasi = 1.5
Tinggi Bendung (P) = 7.500

b. Analisa Lebar Bendung Efektif

Mencari He (dengan trial error)


He Beff V Ha Ho Q Qr
1.3631 144.5911 0.3980 0.0081 1.3550 510.0000 510.000

Mencari He
1. Masukkan semua data di cell berwarna biru
2. Pilih Goal Seek. Isi "set cell" dengan " Q ", "to value" isi dengan nilai sama dengan "
3. Klik OK, akan didapat nilai He

Kontrol p + He > h banjir + fb


8.8631 > 4.6408
Butuh Tanggul
H tanggul (jika dibutuhkan)
h tanggul = 4.2223 m

c. Perencanaan Kolam Olak


Elv I 149 = didapat dari soal, asumsi ssendiri
Elv II 156.5 = rumus
Elv III 157.8550 = variabel trial
Elv IV 157.8631
Elv V 150.3631
Elv VI 147.2849

Trial d2 dan d2'


d1 v E Elv VI Fr d2 d2'
0.2478 14.2367 10.5782 147.2849 9.1320 3.0782 3.0781

Mencari He
1. Masukkan semua data di cell berwarna biru
2. Pilih Goal Seek. Isi "set cell" dengan " Error ", "to value" isi dengan nilai "
3. Klik OK, akan didapat nilai d1

n 0.5 (isi sendiri, maksimal 2m)


Tebal lantai belakang 1
Lj 17.8910 dipakai 18.0000 m (Bulatkan ke atas)
d. Perencanaan Mercu Bendung
Data-data Offset & Ujung Bendung
Ho 1.3550 He 1.3631
n 2 (sesuai tipe bendung) 0,282He 0.3844
k 1.85 (sesuai tipe bendung) 0,175He 0.2385
delta y 1.7151 m R1 0.7
P+delta y 9.21512 R2 0.3

Pers. Bendung
y x
1 1.6724
2 2.4325
3 3.0286
4 3.5382 Dibagi per 1m sesuai tinggi bendung
5 3.9918
5.7849 4.3191
7 4.7880
7.500 4.9699
8.000 5.1464
9.2151 5.5551

5.9395
didapat dari soal
rumus
variabel trial

Ketentuan (masukkan manual)


Error n Pilar Kp Ka Cd B Qr L Pilar
0.0000 5 0.01 0.1 1.3 150 510 1

gan nilai sama dengan "Qr", "by changing cell" dengan "He"

ari soal, asumsi ssendiri

Error
0.00

dengan nilai " 0 ", "by changing cell" dengan "d1"


Ujung Bendung = didapat dari soal, asumsi ssendiri
= rumus
= variabel trial
B-Sisa
145
Tabel IV.2 Gaya Kondisi Air Banjir

Horizontal Luas x Tekanan Gaya (KN) Lengan (m)


W1 0,5 x 60,75 x 7,85 105.49 7.44
W2 0,5 x (60,75 + 72,96) x (1,73+1,83) 238.38 3.65
W3 0,5 x (84,24+87,09) x 0,4 34.27 1.67
W4 0,5 x (85,19+78,45) x 0,95 77.70 1.38
W5 -0,5 x (78,45 +76,55) x 1,35 -92.87 1.18
W6 0,5 x (41,89+55,06) x 1,85 89.67 0.93
W7 -0,5 x 54,10 x 4,2 -113.62 2.10
S1 ½ x (1,8-1) x 10 x 12,822 x {(1-sin 30)/(1+sin 30)} 210.90 16.94
ƩH 549.91 Ʃ MH

Vertikal Luas x Tekanan Gaya (KN) Lengan (m)


G1 ((- 0,25 x 0,5 x 3,14 x 1,14^2)+(1 x 1,14)) x 25 -41.25 24.37
G2 - 0,5 x 1,099 x 1 x 25 -13.65 23.43
G3 - 0,5 x 0,709 x 1 x 25 -8.86 22.55
G4 - 0,5 x 0,569 x 1 x 25 -7.11 21.89
G5 - 0,5 x 0,494 x 1 x 25 -6.18 21.35
G6 - 0,5 x 0,437 x 1 x 25 -5.45 20.87
G7 - 0,5 x 0,421 x 1 x 25 -5.26 20.44
G8 - 0,5 x 0,419 x 1 x 25 -5.24 20.02
G9 - 0,5 x 0,344 x 1 x 25 -4.30 19.63
G10 - 0,5 x 0,329 x 1 x 26 -4.11 19.29
G11 - 0,5 x 0,069 x 1 x 27 -0.86 19.05
G12 - 8,213 x 2,239 x 25 -459.72 23.82
G13 - 7,213 x 0,709 x 25 -127.85 22.35
G14 - 6,213 x 0,569 x 25 -88.38 23.95
G15 - 5,213 x 0,494 x 25 -64.38 23.41
G16 - 4,213 x 0,437 x 25 -46.03 22.95
G17 - 3,213 x 0,421 x 25 -33.82 22.52
G18 - 2,213 x 0,419 x 25 -23.18 22.10
G19 - 1,213 x 0,344 x 25 -10.43 21.72
G20 - 0,213 x 0,329 x 25 -1.75 21.38
G21 - 1,83 x 2,01 x 25 -91.96 23.95
G22 - 2,23 x 2,01 x 25 -111.15 21.97
G23 - 3,2 x 2,01 x 25 -160.80 19.99
G24 - 1,83 x 18 x 25 -823.50 10.00
G25 - 4,2 x 1 x 25 -105.00 0.50
W8 0,5 x (85,73+83,83) x 2,01 168.66 23.95
W9 0,5 x (86,70+84,79) x 2,01 170.54 21.97
W10 0,5 x (78,05+76,14) x 2,01 153.44 19.99
W11 0,5 x (58,59+41,53) x 18 909.56 10.00
W12 0,5 x (54,89+53,94) x 1 54.58 0.50
ƩV -793.44 Ʃ MV
Momen (KNm)
784.91
870.09
57.10
107.47
-109.89
83.68
-238.60
3572.40
5127.17

Momen (KNm)
-1005.30
-319.80
-199.89
-155.71
-131.82
-113.76
-107.57
-104.86
-84.40
-79.32
-16.43
-10950.61
-2856.95
-2116.35
-1477.47
-1036.53
-747.35
-503.46
-223.05
-37.46
-2202.35
-2442.01
-3214.38
-8235.00
-52.50
4039.33
3746.65
3067.28
9095.62
27.29
-18438.13
Tabel IV.1 Jalur Rembesan dan Tekanan (Line) pada saat Debit Sungai Normal
No Garis V h 1/3 h Lw ∆h Hxg P
1 0.00 0.00 62.74 62.74
1-2 1.73 - -
2 1.73 4.60 80.08 75.48
2-3 2.73 - -
3 4.47 11.86 107.41 95.56
3-4 - 2.01 0.67
4 5.14 13.63 107.41 93.78
4-5 0.50 - -
5 5.64 14.96 112.41 97.45
5-6 - 2.01 0.67
6 6.31 16.73 112.41 95.68
6-7 1.50 - -
7 7.81 20.71 107.41 86.70
7-8 - 2.01 0.67
8 8.47 22.49 107.41 84.92
8-9 0.87 - -
9 9.34 24.79 98.75 73.96
9-10 - 18.00 6.00
10 15.34 40.71 98.75 58.04
10-11 1.87 - -
11 17.21 45.67 117.41 71.75
11-12 - 1.00 0.33
12 17.54 46.55 117.41 70.86
12-13 5.60 - -
13 23.14 61.41 61.41 0.0000
5.6000 1.87 1.87

SigmaV SigmaH Hw NormalHw Banjir P Hw normaHw Banjir Ho


14.80 25.02058 3.688292 3.768048 6.274 6.274 6.141 1.34

lx lw/cu x ɣw

Masukkan data disini


P 7.85
delta y 1.733677
Ho 1.337974
Lj 18.0
tebal end sill 1
Panjang bend 6.020579

Langkah-langkah :
1 Masukkan data di atas
2 Buka solver, pilih set target cell "selisih normal banjir". Pilih value = 0
3 Pada By changing cell, pilih/drag semua "variabel solver"
4 Jika solver sudah dibuat constraint, maka langsung klik "solve". Jika tidak, maka ikuti langkah selanjutnya
5 Masukkan batasan-batasan (constraint)
a. tekanan P pada titik 13 (normal maupun banjir) harus berada pada nilai 0,000 sampai 0,004
b. cell "panjang bendung solver" harus sama dengan cell "panjang bendung"

Tabel IV.2 Jalur Rembesan dan Tekanan (Line) pada saat Debit Banjir
No Garis V h 1/3 h Lw ∆h Hxg P
1 0.00 0.00 64.08 64.08
1-2 1.73 - -
2 1.73 4.70 81.41 76.71
2-3 2.73 - -
3 4.47 12.11 108.75 96.64
3-4 - 2.01 0.67
4 5.14 13.93 108.75 94.82
4-5 0.50 - -
5 5.64 15.28 113.75 98.47
5-6 - 2.01 0.67
6 6.31 17.09 113.75 96.66
6-7 1.50 - -
7 7.81 21.16 108.75 87.59
7-8 - 2.01 0.67
8 8.47 22.98 108.75 85.77
8-9 0.87 - -
9 9.34 25.32 100.09 74.76
9-10 - 18.00 6.00
10 15.34 41.59 100.09 58.49
10-11 1.87 - -
11 17.21 46.65 118.75 72.10
11-12 - 1.00 0.33
12 17.54 47.56 118.75 71.19
12-13 5.60 - -
13 23.14 62.74 62.74 0.0000
Tabel IV.1 Gaya Kondisi Air Normal
13.47
Horizontal Luas x Tekanan
Variabel W1 0,5 x 62,74 x 6,274
Solver W2 0,5x(62,74+84,24)x(1,59+1,49)
2.01 W3 0,5 x (84,24+89,84) x 1
0.5 W4 0,5 x (73,93+88,45) x 1,5
2.00686 W5 -0,5 x (73,93+64,56) x 0,61
2.00686 W6 0,5 x (45,44 + 56,70) x 1,61
0.866474 W7 -0,5 x 54,69 x 4,2
1.866474 S1 ½ x (1,8-1) x 10 x 11,58 x {(1-sin 30)/(1+sin 30)}
5.6 ƩH

Vertikal Luas x Tekanan


G1 ((- 0,25 x 0,5 x 3,14 x 1^2)+(0,5 x 1 x 2,27)) x 25
Panjang G2 - 0,5 x 1,03 x 1 x 25
Bendung G3 - 0,5 x 0,8 x 1 x 25
Solver G4 - 0,5 x 0,69 x 1 x 25
6.02 G5 - 0,5 x 0,62 x 1 x 25
G6 - 0,5 x 0,56 x 1 x 25
Panjang G7 - 0,5 x 0,52 x 1 x 25
Bendung G8 - 0,5 x 0,49 x 1 x 25
6.02 G9 - 0,5 x 1,39 x 0,61 x 25
G10 - 8,39 x 3,02 x 25
Selisih G11 - 7,39 x 1,03 x 25
Normal G12 - 6,39 x 0,8 x 25
Banjir G13 - 5,39 x 0,69 x 25
0.00 G14 - 4,39 x 0,62 x 25
G15 - 3,39 x 0,56 x 25
G16 - 2,39 x 0,52 x 25
G17 - 1,39 x 0,49 x 25
G18 - 2,41 x 2,61 x 25
G19 - 4,66 x 2,58 x 25
G20 - 6,12 x 3,18 x 25
G21 - 32 x 2,4 x 25
G22 - 6,12 x 2 x 25
W8 0,5 x (108,80+107,15) x 2,61
W9 0,5 x (125,40+123,77) x 2,58
W10 0,5 x (98,49+96,48) x 3,18
W11 0,5 x (126,59+106,38) x 32
W12 0,5 x (74,09+72,83) x 2
ƩV
aka ikuti langkah selanjutnya

00 sampai 0,004

Tabel IV.2 Gaya Kondisi Air Banjir

Horizontal Luas x Tekanan


W1 0,5 x 72,03 x 7,20
W2 0,5 x (72,03 + 111,07) x 4,86
W3 0,5 x (111,07+127,44) x 2,25
W4 0,5 x (125,74+100,35) x 1,46
W5 -0,5 x (100,35 +128,10) x 3,72
W6 0,5 x (107,10+74,60) x 2,72
W7 -0,5 x 73,29 x 6,12
S1 ½ x (1,8-1) x 10 x 18,27 x {(1-sin 30)/(1+sin 30)}
ƩH

Vertikal Luas x Tekanan


G1 ((- 0,25 x 0,5 x 3,14 x 1^2)+(0,5 x 1 x 2,27)) x 25
G2 - 0,5 x 1,03 x 1 x 25
G3 - 0,5 x 0,8 x 1 x 25
G4 - 0,5 x 0,69 x 1 x 25
G5 - 0,5 x 0,62 x 1 x 25
G6 - 0,5 x 0,56 x 1 x 25
G7 - 0,5 x 0,52 x 1 x 25
G8 - 0,5 x 0,49 x 1 x 25
G9 - 0,5 x 1,39 x 0,61 x 25
G10 - 8,39 x 3,02 x 25
G11 - 7,39 x 1,03 x 25
G12 - 6,39 x 0,8 x 25
G13 - 5,39 x 0,69 x 25
G14 - 4,39 x 0,62 x 25
G15 - 3,39 x 0,56 x 25
G16 - 2,39 x 0,52 x 25
G17 - 1,39 x 0,49 x 25
G18 - 2,41 x 2,61 x 25
G19 - 4,66 x 2,58 x 25
G20 - 6,12 x 3,18 x 25
G21 - 32 x 2,4 x 25
G22 - 6,12 x 2 x 25
W8 0,5 x (111,07+109,36) x 2,61
W9 0,5 x (125,44+125,74) x 2,58
W10 0,5 x (100,35+98,26) x 3,18
W11 0,5 x (128,10+107,10) x 32
W12 0,5 x (74,60+73,29) x 2
ƩV
Gaya (KN) Lengan (m) Momen (KNm) sigma m ###
196.81538 9.89 1946.50 y =h 9.151
353.57 4.33 1530.96 x=v -27.145
48.25 1.21 58.39
136.78 0.51 69.76 Stablitias piping (lane)
-69.60 0.24 -16.70 3.688 >
121.12 0.91 110.22 Stablitias guling
-198.41 2.04 -404.76 3.234 <
237.23 17.97 4262.03
825.76 Ʃ MH 7556.39 stabilitas daya dukung
gama 1 190.407
Gaya (KN) Lengan (m) Momen (KNm) gama 2 24.087
-47.75 41.36 -1974.94
-13.00 39.00 -507.00 Tebal lantai olak minimum
-10.25 38.05 -390.01 0.975 >
-8.75 37.28 -326.20
-7.75 36.61 -283.73
-7.00 36.01 -252.07
-6.50 35.47 -230.56
-6.00 34.96 -209.76
-11.00 34.42 -378.62
-634.50 40.86 -25925.67
-190.50 38.83 -7397.12
-129.25 37.91 -4899.87
-93.25 37.16 -3465.17
-67.50 36.51 -2464.43
-47.50 35.92 -1706.20
-31.00 35.38 -1096.78
-16.75 34.88 -584.24
-157.25 41.06 -6456.79
-300.57 38.47 -11562.93
-486.54 35.59 -17315.96
-1920.00 18.00 -34560.00
-306.00 1.00 -306.00
189.99 41.50 7884.46
193.80 38.90 7538.65
172.21 36.12 6220.21
1187.94 23.33 27714.70
71.30 1.33 94.83
-2683.37 Ʃ MV -72841.17
Gaya (KN) Lengan (m) Momen (KNm) sigma m ###
0 10.78 0.00 y =h 8.885
358.98 4.36 1565.13 x=v -27.139
48.78 1.25 60.97
138.18 0.50 69.09
-70.34 0.25 -17.58 stablitias guling
121.87 0.92 112.12
-199.34 2.04 -406.66 -12.511 4.170
237.23 17.97 4262.03
635.36 Ʃ MH 5645.10 stabilitas daya dukung
gama 1 -213.104
Gaya (KN) Lengan (m) Momen (KNm) gama 2 426.195
-47.75 41.36 -1974.94
-13.00 39.00 -507.00 stablitas gelincir
-10.25 38.05 -390.01 1.678 1.25
-8.75 37.28 -326.20
-7.75 36.61 -283.73 stabilitas thp erosi bwh tanah
-7.00 36.01 -252.07 3.688 5
-6.50 35.47 -230.56
-6.00 34.96 -209.76 keamanan thp rekahan
-11.00 34.42 -378.62 -1.000 5
-634.50 40.86 -25925.67
-190.50 38.83 -7397.12
-129.25 37.91 -4899.87
-93.25 37.16 -3465.17
-67.50 36.51 -2464.43
-47.50 35.92 -1706.20
-31.00 35.38 -1096.78
-16.75 34.88 -584.24
-157.25 41.06 -6456.79
-300.57 38.47 -11562.93
-486.54 35.59 -17315.96
-1920.00 18.00 -34560.00
-306.00 1.00 -306.00
192.12 41.50 7972.95
195.79 38.90 7616.35
173.96 36.12 6283.33
1199.28 23.33 27979.17
71.65 1.33 95.29
-2665.82 Ʃ MV -72346.94
tias piping (lane)
3.000 << Nilai ini diambil dari tabel Lane
ablitias guling
4.170

daya dukung
daya dukung pasir kasar 100 - ok

ntai olak minimum


3.411292
ok

daya dukung
daya dukung pasir kasar 100 - ok

thp erosi bwh tanah


OK

n thp rekahan
ok
Tabel IV.2.6 Jalur Rembesan dan Tekanan Air (Lane) Saat Debit Sungai Normal

Titik Garis Panjang Rembesan Lx Hx Px = Hx - Lx


Vertikal Horizontal 1/3 H Lw kN/m kN/m kN/m
1 0.00 0.00 75.00 75.00
1--2 2.72
2 2.72 6.31 102.15 95.84
2--3 1.60 0.53
3 3.25 7.55 102.15 94.60
3--4 4.00
4 7.25 16.85 142.15 125.30
4--5 1.60 0.53
5 7.78 18.09 142.15 124.06
5--6 4.00
6 11.78 27.38 182.15 154.77
6--7 2.74 0.91
7 12.69 29.50 182.15 152.65
7--8 7.50
8 20.19 46.94 107.15 60.22
8--9 18.00 6.00
9 26.19 60.88 107.15 46.27
9--10 1.50
10 27.69 64.37 122.15 57.78
10--11 3.00 1.00
11 28.69 66.69 122.15 55.46
11--12 4.50
12 33.19 77.15 77.15 0.00
Tabel IV.2.8. Jalur Rembesan dan Tekanan Air (Lane) Pada Kondisi Banjir

Titik Garis Panjang Rembesan Lx Hx Px = Hx - Lx


Vertikal Horizontal 1/3 H Lw kN/m kN/m kN/m
1 0.00 0.00 84.03 84.03
1--2 2.72
2 2.72 6.13 111.18 105.06
2--3 1.60 0.53
3 3.25 7.33 111.18 103.85
3--4 4.00
4 7.25 16.36 151.18 134.82
4--5 1.60 0.53
5 7.78 17.56 151.18 133.62
5--6 4.00
6 11.78 26.59 191.18 164.59
6--7 2.74 0.91
7 12.69 28.65 191.18 162.53
7--8 7.50
8 20.19 45.58 116.18 70.61
8--9 18.00 6.00
9 26.19 59.12 116.18 57.06
9--10 1.50
10 27.69 62.51 131.18 68.68
10--11 3.00 1.00
11 28.69 64.76 131.18 66.42
11--12 4.50
12 33.19 74.92 86.18 11.27
e. Stabilitas Bendung

Tabel IV.2.4. Jarak Vertikal


Titik 1--2 3--4 5--6 7--8 9--10 11--12 ∑ LV
Jarak ( m ) 2.72 4.00 4.00 7.50 1.50 4.50 24.22

Tabel IV.2.5. Jarak Horisontal


Titik 2--3 4--5 6--7 8--9 10--11 ∑ LH
Jarak ( m ) 1.60 1.60 2.74 18.00 3.00 26.94

Nilai CL minimum ( Pasir Kasar ) = 5.0


Tinjauan stabilitas saat normal :
∆H = 7.72
CL = 4.3025 > 5.0 ………. tidak aman

Tinjauan stabilitas saat banjir :


∆H = 7.49
CL = 4.4307 > 5.0 ………. tidak aman
10
8
6
4
2
0
0 5
-2
Gambar Grafik -4
Bendung bendung Pondasi -6
x y no x y
-8
0 9.215116 2 0 -1
2.0545 8.215116 3 1.6 -1 0
-1
2.8147 7.215116 4 1.6 -5
3.4107 6.215116 5 3.2 -5
3.9203 5.215116 6 3.2 -9
4.3739 4.215116 7 5.93725 -9
4.7012 3.430232 8 5.93725 -1.5
5.3520 1.715116 9 23.9372 -1.5
5.9372 0 10 23.9372 -3
Lj 5.9372 0.0000 11 26.9372 -3
23.93725 0.0000 12 26.9372 1.5
23.93725 1.5
26.93725 1.5

H V
Hc 0.903 1-2 0 2.715
Ho 1.35502 2-3 1.6 0
3-4 0 4
P 7.5 4-5 1.6 0
Δy 1.715 5-6 0 4
y 1 6-7 2.737 0
Lj 18 7-8 0 7.5
Lbr Bdg 5.937 8-9 18 0
n sil 1.5 9-10 0 1.5
10-11 3 0
Elv III 157.86 11-12 0 4.5
Elv V 150.363
Elv I 149.000 elv.8 & 9 = - 1.5
Elv VI 147.285
10
8
6
4
2
0
0 5 10 15 20 25 30
-2
-4
-6
-8
0
-1
1 2 3
Qr = 510 h = 4.326727 P
So / I = 0.00057 Q = 576.0001 A
K = 42 v = 2.662521 Icr
V = 1.475 A = 216.3364
b/L = 50 Hcr = 2.382751
h = 2.6167
Q = 233
x1 = 7396.700398
x2 = 3381.115055
toleransi = 54.28887378
= 55.2334
= 130.835
= 0.000986
1 2
Q = 576 elv mercu bendung = 174.5
b/L = 50 elevasi dasar sungai = 147.0926
KP = 0.01 tinggi bendung (p) = 27.40741
ka = 0.1
Lpintu = 20
jml pntu = 7
lbr pilar = 0.8 5.6
jarak pilar = 2 14 19.6
B = 44.4

4
elv1 147.0926 d1 v E elv6 d2'
elv2 174.500 0.79095 16.8275 14.4728 163.4138 -13.0174
elv3 177.8038 0.79096 16.8272 14.4722 163.4143 -13.0179
elv4 177.8866 0.79097 16.8271 14.4720 163.4145 -13.0181
elv5 150.3964
Lj 39.3667

5
delta y -16.3217 R1 0.9316811 1.6519167786
P 27.4074 R2 0.5781709 0.6607667114
he 3.3038
titik y x 0.74
1 1 2.5188 1.7788
2 2 3.6636 1.1448
3 3 4.5613 0.8977
4 4 5.3287 0.7674
5 5 6.0119 0.6831
6 6 6.6345 0.6227
7 7 7.2110 0.5765
8 27.4074 15.0804 1.1992
9 11.0857 9.2453
3
m B 44.4 He Beff v Ha Hd Cd
m n 7 3.3040 43.2767 1.2741 0.083 3.2212 1.3
m kp 0.01 3.3039 43.2767 1.2741 0.083 3.2211 1.3
ka 0.1 3.3038 43.2767 1.2740 0.083 3.2211 1.3
he 0 3.3037 43.2768 1.2740 0.083 3.2209 1.3
Beff 44.4 3.3036 43.2768 1.2739 0.083 3.2208 1.3
cd 1.3
P+he 30.7112 > h banjir+ fb 3.6167
h tanggul 27.0945

Fr d2 error elv5 elv4 g beff Q


6.0410 6.3734 19.39079 150.3964 177.8866 9.81 43.2767 576
6.0409 6.3733 19.39123 150.3964 177.8866 9.81 43.2767 576
6.0408 6.3733 19.39143 150.3964 177.8866 9.81 43.2767 576
Qr Q Er B n kp ka L L pilar
576 576.0323 0.03226 44.4 7 0.01 0.1 200 0.8
576 576.0066 0.00657 44.4 7 0.01 0.1 200 0.8
576 575.9998 -0.00023 44.4 7 0.01 0.1 200 0.8
576 575.9552 -0.04483 44.4 7 0.01 0.1 200 0.8
576 575.9295 -0.07053 44.4 7 0.01 0.1 200 0.8
Tabel III. Terjunan

Elevasi tanah asli


Saluran Q b h v g ΔH
T1 T2
RT1 2.472 2.575 1.030 0.582396 9.8 152.69 152.59 0.100
RT2 1.377 1.841 0.920 0.541779 9.8 150.87 149.89 0.978
RT3 0.622 0.825 0.825 0.457293 9.8 149.58 149.39 0.196
RT4 0.133 0.476 0.476 0.294455 9.8 147.64 147.26 0.377
RW2 0.00 0.000 0.000 0 9.8 147.35 146.18 1.176
RW3 0.83 1.476 0.738 0.50505 9.8 143.75 142.27 1.477
RW5 0.37 0.930 0.620 0.384767 9.8 138.33 136.50 1.833
RW6 0.18 0.541 0.541 0.310709 9.8 133.10 132.50 0.600
RD1 0.80 1.445 0.722 0.509477 9.8 146.39 144.79 1.597
RD2 0.54 1.239 0.620 0.471719 9.8 142.12 141.90 0.214
RD3 0.31 0.659 0.659 0.353484 9.8 133.33 133.33 0.000
RD4 0.13 0.476 0.476 0.294579 9.8 130.67 130.47 0.198

Yd/Δz = 0.8
LP/Δz = 2.4
H1 Hd Δz Vu Yu Fr Yd Lp
1.040 1.737 1.911 6.119 0.404 3.076 1.528 4.585
0.928 1.551 2.348 6.784 0.203 4.810 1.878 5.635
0.829 1.385 1.311 5.070 0.123 4.624 1.049 3.147
0.477 0.797 0.560 3.313 0.040 5.276 0.448 1.344
0.000 0.000 0.000 0.000 #DIV/0! #DIV/0! 0.000 0.000
0.745 1.244 2.027 6.303 0.131 5.562 1.621 4.864
0.623 1.040 1.789 5.922 0.062 7.573 1.431 4.294
0.543 0.907 0.818 4.004 0.045 5.997 0.654 1.963
0.729 1.217 2.052 6.342 0.126 5.713 1.642 4.925
0.625 1.044 0.786 3.925 0.138 3.370 0.629 1.887
0.661 1.104 0.730 3.783 0.081 4.242 0.584 1.752
0.478 0.798 0.476 3.054 0.044 4.661 0.381 1.142
Tabel IV.2.a Jalur Rembesan dan Tekanan (Line) pada saat Debit Banjir
No Garis V h 1/3 h Lw ∆h Hxg P
1 0.00 0.00 133.07 133.07
1-2 3.069502 - -
2 3.07 19.81 163.76 143.95
2-3 1.5 - -
3 4.57 29.49 178.76 149.27
3-3.1 - 1.32 0.44
3.1 5.01 32.33 178.76 146.43
3.1-3.2 8.5 - -
3.2 13.51 87.18 263.76 176.58
3.2-3.3 - 1 0.33
3.3 13.84 89.34 263.76 174.43
3.3-3.4 8.5 - -
3.4 22.34 144.19 178.76 34.57
3.4-4 - 1.32 0.44
4 22.78 147.03 178.76 31.73
4-5 0.774 - -
5 23.56 152.03 186.50 34.48
5-6 - 2.44 0.81
6 24.37 157.27 186.50 29.23
6-7 0.9 - -
7 25.27 163.08 195.50 32.42
7-7.1 - 1.08 0.36
7.1 25.63 165.41 195.50 30.10
7.1-7.2 6.87 - -
7.2 32.50 209.74 264.20 54.46
7.2-7.3 - 1 0.33
7.3 32.83 211.89 264.20 52.31
7.3-7.4 6.87 - -
7.4 39.70 256.23 195.50 -60.73
7.4-8 - 1.08 0.36
8 40.06 258.55 195.50 -63.05
8-9 1.674 - -
9 41.74 269.36 178.76 -90.59
9-10 - 39.3667 13.12
10 54.86 354.04 178.76 -175.28
10-11 1.5 - -
11 56.36 363.72 193.76 -169.96
11-12 - 3 1.00
12 57.36 370.18 193.76 -176.41
12-13 4.5 - -
13 61.86 399.22 100.85 -298.36
Tabel III.9 Perhitungan Galian Dan Timbunan

Data Saluran Rerata volume


Saluran Patok Y Y+h ketrangan
X I Fb h b Kiri tengah kanan Y rata rata (m3)
T0-T1 100 190.99 190.96 190.90 190.95 190.9622 191.974 Galian Timbunan 255.93
T1-T2 100 190.98 190.94 190.89 190.94 190.9378 191.950 Galian Timbunan 255.93
RT1 0.000139 0.6 1.012 2.529
T2-T3 100 191.12 190.96 191.91 191.33 190.9639 191.976 Galian Timbunan 255.93
T3-T4 100 191.20 191.05 191.00 191.08 191.046 192.058 Galian Timbunan 255.93
T5-T6 100 191.32 191.10 191.01 191.14 191.1007 192.113 Galian Timbunan 255.93
RT2 0.000148 0.5 0.922 1.844
T6-T7 100 191.24 191.10 191.02 191.12 191.0958 192.108 Galian Timbunan 255.93
Primer

T7-T8 100 191.33 191.10 191.02 191.15 191.0983 192.110 Galian Timbunan 70.39
T8-T9 100 191.14 191.07 191.01 191.07 191.0706 192.083 Galian Timbunan 70.39
RT3 T10-T11 100 0.000160 0.3 0.839 0.839 191.23 191.03 190.98 191.08 191.0279 192.040 Galian Timbunan 70.39
T11-12 100 191.22 191.01 190.93 191.05 191.0143 192.026 Galian Timbunan 0.00
T12-T13 100 191.14 191.01 190.95 191.03 191.0108 192.023 Galian Timbunan 0.00
T13-T14 100 191.17 191.01 190.97 191.05 191.0057 192.018 Galian Timbunan 0.00
RT4 0.000126 0.3 0.534 0.534
T14-T15 100 191.12 190.99 190.91 191.01 190.9945 192.006 Galian Timbunan 0.00
RW1 W0-W1 100 0.000174 0.5 0.888 1.776 191.04 190.95 190.91 190.97 190.954 191.966 Galian Timbunan 0.00
W1-W2 100 190.93 190.88 190.79 190.87 190.882 191.894 Galian Timbunan 0.00
W2-W3 100 190.95 190.84 190.80 190.86 190.8377 191.850 Galian Timbunan 0.00
RW2 W3-W4 100 0.000185 0.5 0.806 1.613 190.84 190.73 190.71 190.76 190.7346 191.747 Galian Timbunan 0.00
W4-W5 100 190.58 190.50 190.45 190.51 190.4994 191.511 Galian Timbunan 0.00
W5-W6 100 189.99 189.93 189.87 189.93 189.9348 190.947 Galian Timbunan 0.00
Sekunder 1

W6-W7 100 189.34 189.29 189.21 189.28 189.2867 190.299 Galian Timbunan 0.00
RW3 0.000205 0.5 0.711 1.422
W8-W9 100 188.98 188.94 188.90 188.94 188.9378 189.950 Galian Timbunan 0.00
RW4 W10-W11 100 0.000203 0.5 0.648 1.295 188.55 188.49 188.41 188.48 188.4933 189.505 Galian Timbunan 0.00
W11-W12 100 188.76 188.70 188.66 188.71 188.6985 189.710 Galian Timbunan 0.00
W12-W13 100 0.000156 0.4 0.613 0.919 187.71 187.68 187.60 187.66 187.6781 188.690 Galian Timbunan 0.00
RW5
W13-W14 100 186.23 186.14 186.10 186.16 186.137 187.149 Galian Timbunan 0.00
W14-W15 100 185.52 185.47 185.41 185.47 185.4725 186.484 Galian Timbunan 0.00
RW6 W15-W16 100 0.000144 0.3 0.534 0.534 184.79 184.70 184.64 184.71 184.704 185.716 Galian Timbunan 0.00
W16-W17
D0-D1 100 184.42 184.36 184.31 184.36 184.3583 185.370 Galian Timbunan 0.00
D1-D2 100 184.97 184.89 184.82 184.89 184.8878 185.900 Galian Timbunan 0.00
RD1 0.000206 0.5 0.704 1.407
D2-D3 100 185.72 185.66 185.61 185.66 185.659 186.671 Galian Timbunan 0.00
D3-D4 100 185.22 185.14 185.06 185.14 185.142 186.154 Galian Timbunan 0.00
D4-D5 100 184.86 184.80 184.74 184.80 184.7984 185.810 Galian Timbunan 0.00
D5-D6 100 184.67 184.58 184.55 184.60 184.5757 185.588 Galian Timbunan 0.00
D6-D7 100 183.57 183.48 183.43 183.49 183.4758 184.488 Galian Timbunan 0.00
Sekunder 2

RD2 D7-D8 100 0.000205 0.4 0.609 1.219 182.73 182.67 182.62 182.67 182.6695 183.681 Galian Timbunan 0.00
D8-D9 100 182.57 182.51 182.45 182.51 182.512 183.524 Galian Timbunan 0.00
D9-10 100 182.53 182.42 182.36 182.44 182.4225 183.435 Galian Timbunan 0.00
D10-D11 100 182.44 182.31 182.25 182.33 182.3075 183.320 Galian Timbunan 0.00
Curah hujan Mean 12.5 25 37.5 50 62.5 75 87.5 100 112.5 125 137.5 150 162.5 175
bulanan mm
Curah hujan efektif rata-rata bulanan/mm
ET tanaman 25 8 16 24
rata-rata 50 8 17 25 32 39 46
bulanan/mm 75 9 18 27 34 41 48 56 62 69
100 9 19 28 35 43 52 59 66 73 80 87 94 100
125 10 20 30 37 46 54 62 70 76 85 92 98 107 116
150 10 21 31 39 49 57 66 74 81 89 97 104 112 119
175 11 23 32 42 52 61 69 78 86 95 103 111 118 126
200 11 24 33 44 54 64 73 82 91 100 109 117 125 134
225 12 25 35 47 57 68 78 87 96 106 115 124 132 141
250 13 25 38 50 61 72 84 92 102 112 121 132 140 150

Apabila kedalam air bersih yang dapat ditampung dalam tanah pada waktu irigasi lebih besar atau lebih
kecil dari 75 mm, harga - harga faktor koreksi yang akan dipakai adalah :

Tampungan efektif 20 25 37.5 50 62.5 75 100 150 175 200


Faktor tampungan 73 77 86 93 97 1.00 1.02 1.06 1.07 1.08

CONTOH :
Diketahui :
Curah hujan mean bulanan = 100mm; ET tahunan =150 mm; tampungan efektif = 175 mm
pemecahan :
Faktor koreksi untuk tampungan efektif = 1.07
Curah hujan efektif 1.07 x 74 = 79 mm
Sumber : Ref (FAO,1977)
187.5 200

120
127 133
134 141
142 150
150 159
158 167

h besar atau lebih

You might also like