The document provides instructions for power management and starting procedures for a bow thruster in both auto and manual modes. It explains that in auto mode, the standby generator will start and synchronize before closing circuit breakers to provide power. In manual mode, the operator must close specific circuit breakers before being able to start the bow thruster from the bridge panel or local panel. It also outlines the proper sequence for starting the bow thruster's fan, hydraulic pump, and main motor.
The document provides instructions for power management and starting procedures for a bow thruster in both auto and manual modes. It explains that in auto mode, the standby generator will start and synchronize before closing circuit breakers to provide power. In manual mode, the operator must close specific circuit breakers before being able to start the bow thruster from the bridge panel or local panel. It also outlines the proper sequence for starting the bow thruster's fan, hydraulic pump, and main motor.
The document provides instructions for power management and starting procedures for a bow thruster in both auto and manual modes. It explains that in auto mode, the standby generator will start and synchronize before closing circuit breakers to provide power. In manual mode, the operator must close specific circuit breakers before being able to start the bow thruster from the bridge panel or local panel. It also outlines the proper sequence for starting the bow thruster's fan, hydraulic pump, and main motor.
When Bow thruster request When using Shaft generator
indicator is ON to run for Bow Thruster
Standby generator will CQF 2 (No.2 Bus tie ACB)
start automatic – must be OFF synchronize with running generator and ACB will close
Manually push the button
of Bow thruster request CQF 2 and Bow thruster on MSB (Bow thruster ACBs will be closed panel) Automatic
Bow thruster ACB will be
closed Automatic Start Ready light will be lit on MSB
Start Ready light will
be lit on MSB Bow Thruster Starting Procedure
Select Power request
either on Bridge Panel Bow Thruster can be and Starter Panel started from three location (Local Panel – not available)
Wait for Power Available and
Base on Setting of Selector Ready to start indicator lit Switch on Starter Panel in either on Bridge Panel and Forward Bow Thruster Panel Starter Panel
1. It can be started from 1. Start fan
Bridge 2. Start hydraulic pump 2. It can be started from 3. Start main motor Starter Panel 3. It can be started from Local Panel near Bow Thruster motor (Just starting of fan; hydraulic pump and Main motor) Now Bow Thruster can be operated from the Bridge – at three locations
The Bow Thruster must be
started in sequence For Emergency Operation 1. Bow Thruster room fan Communicate with Bridge must be started - First Push the solenoid valve of hydraulic 2. Hydraulic pump must be pump unit – Port or Stb direction as started – Second indicated on Solenoid valve – as order 3. Then Main motor can be from Bridge – stop pushing when started desire pitch reach