Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

MSB Preparation for Bow Thruster

Power Management is in Power Management is in


Auto mode Manual mode

When Bow thruster request When using Shaft generator


indicator is ON to run for Bow Thruster

Standby generator will CQF 2 (No.2 Bus tie ACB)


start automatic – must be OFF
synchronize with running
generator and ACB will
close

Manually push the button


of Bow thruster request
CQF 2 and Bow thruster on MSB (Bow thruster
ACBs will be closed panel)
Automatic

Bow thruster ACB will be


closed Automatic
Start Ready light will
be lit on MSB

Start Ready light will


be lit on MSB
Bow Thruster Starting Procedure

Select Power request


either on Bridge Panel
Bow Thruster can be
and Starter Panel
started from three location
(Local Panel – not
available)

Wait for Power Available and


Base on Setting of Selector Ready to start indicator lit
Switch on Starter Panel in either on Bridge Panel and
Forward Bow Thruster Panel Starter Panel

1. It can be started from 1. Start fan


Bridge 2. Start hydraulic pump
2. It can be started from 3. Start main motor
Starter Panel
3. It can be started from
Local Panel near Bow
Thruster motor (Just
starting of fan; hydraulic
pump and Main motor) Now Bow Thruster
can be operated from
the Bridge – at three
locations

The Bow Thruster must be


started in sequence For Emergency Operation
1. Bow Thruster room fan Communicate with Bridge
must be started - First Push the solenoid valve of hydraulic
2. Hydraulic pump must be pump unit – Port or Stb direction as
started – Second indicated on Solenoid valve – as order
3. Then Main motor can be from Bridge – stop pushing when
started desire pitch reach

You might also like