INSPECTION & TEST PLAN

Contractor:SEPCOIII ELECTRIC SEPCOIII Electric Power Owner: Lucky Electric LEPCL-10-HZZ-MQA-


EPC Contractor : ITP No. : Project Name : LEPCL 660MW CFPP, Karachi Consultant: FICHTNER
POWER CONSTRUCTION Construction Co., Ltd. Power Company Limited 200003-G01-C
CORPORATION., LTD. Sub-Contractor Name GMBH & CO KG
/ Rev. No. : C Owner Name : Lucky Electric Power Company Ltd.
:

Item Flue gas and air duct Date : 03-07-2019 Consultant Name: FICHTNER

Quantum / Responsibility
Characteristics to be Method of Check / Ref. Doc. / Acceptance
Sl. No. Activity / Process Frequency of Format of Record Remark
checked Instrument Standard
Check Sub-contractor Contractor Consultant

1. PRE-ASSEMBLING OF DUCT
Visual inspection on All fabraction
1.1 V Approved Drg. Inspection Report H W W
welds welds

1.2 Dimensional check Dimension V/M All ducts Approved Drg. Inspection Report H W W

2. ERECTION OF DUCT
Tech. Spec. /Approved
2.1 Erection of supports All ducts Check list H W W
Drg.
Erection of sections Tech. Spec. /Approved
2.2 All ducts Check list H W W
of duct Drg.
Visual inspection on All erection
2.3 V Approved Drg. Inspection Report H W H
welds welds
Damper &
2.4 All ducts Approved Drg. Check list H W W
expansion joint

3. LEAK CONTROL

3.1 Leak test of all jonits Leakage V/M All ducts Tech. Spec. Inspection Report H H H

Legend:

H: Hold Point W:Witness Point R: Report Review S: Surveillance

W:QA/QC organization shall be notified of the timing of inspection


H: QA/QC organization shall be noticed of the timing of
or test in advance. However, the inspection of test shall be performed S: QA/QC organization to monitor work in progress without
inspection or test in advance. Inspection or test shall not be
as scheduled if the QA/QC organization representative is not present. R: Document/Reprot review. (RFI is not rquired to submit.) notice from construction organization. (RFI is not required to
carried out without the QA/QC organization representative
(RFI is rquired to submit.) submit.)
in attendance. (RFI is required to submit.)