Professional Documents
Culture Documents
Technical Rehearsal - SM Checklist
Technical Rehearsal - SM Checklist
Name
Fall or Spring, Year PSM: First and Last Name
Pre-Rehearsal
Arrive with ASMs and Crew at call time
Unlock all theatre doors, the booth, and the dressing rooms
Turn on lights, sound system, and headset / monitor system to dressing
rooms
Unplug ghost light
Unlock props cabinet / storage
Unlock Stage Management Kit
As of Date Page 1 of 3
Muhlenberg Theatre Association Production Name Dir: First and Last
Name
Fall or Spring, Year PSM: First and Last Name
Post Rehearsal
Check that all props, set pieces and costumes are returned
Strike costumes (with wardrobe), return to dressing rooms
Strike props and scenery, return to cabinet / storage
Collect personal props from dressing room, return to cabinet
Strike piano (close and cover)
Strike tech table items
Take down any signs that were hung
Sweep for trash and personal belongings left behind
Lock SM kit
Lock props cabinet / storage
Plug in ghost light
Turn off lights, sound system, headset and monitor system
As of Date Page 2 of 3
Muhlenberg Theatre Association Production Name Dir: First and Last
Name
Fall or Spring, Year PSM: First and Last Name
As of Date Page 3 of 3