Another project for flood control system is the rainwater harvesting facilities
located at near the admin building and another one at the rear part of the university
which is the LRC. A rainwater harvesting system consists of three basic elements: a
collection area, a conveyance system, and storage facilities. The collection area in
most cases is elevated at a roof height. A conveyance system usually consists of
gutters or pipes that deliver rainwater to storage vessels. The progress seen during the
visit are the catch basins, where the water will be temporarily stored, cleaned and
treated before being delivered to the tank and the elevated water tank. The treated
water will be stored at the water tank and will be distributed to adjacent buildings for
University of Science and Technology of Southern Philippines
C.M. Recto Avenue, Lapasan, Cagayan de Oro City 9000 Philippines
College of Engineering and Architecture
Department of Civil Engineering
Tel. Nos. +63 (88) 856 1738; Telefax +63 (88) 856 4696
sanitation purposes. The water tank is elevated for the purpose of distributing the
water by gravity flow to avert the use of electricity during water distribution. The area
surrounding the facility that we visited will be used as an activity area for the students.
The next project we visited is the sports complex. The sports complex is going to
have a dormitory, oval, volleyball court, open basketball court and etc. The
undergoing activities and progress in the project are excavating, embanking,
compaction of soil and other preparations necessary for the project. The complex is
elevated to protect the area from flooding.
And last site is the faculty learning resource center (FLRC). The activities that
we witnessed are the construction of foundation, tie beam and column work. The
foundation used for the project is pile foundation. A pile foundation is used because
of a layer of weak soil at the surface. The layer won’t be able to support the weight
of the building do the loads must be able to bypass this layer and be transferred to
the layer of stronger soil. Other parallel activities done are the form works and
reinforcement of pile cap. These activities are done to save time during the
construction works.
University of Science and Technology of Southern Philippines
C.M. Recto Avenue, Lapasan, Cagayan de Oro City 9000 Philippines
College of Engineering and Architecture
Department of Civil Engineering
Tel. Nos. +63 (88) 856 1738; Telefax +63 (88) 856 4696