To examine the broad project environment and apply project management tools
and techniques to a simulated project.
Establish the key project planning and control activities and apply the planning
and control tools and techniques in a project environment.
Examine the project lifecycle and its relationship with project activities and
processes.
Discuss the 5 key variable of project management: cost, time, quality, scope and
risk and the trade−offs and interaction between these variables.
Assessment
Imaginary Project
Budget CHF 2M
12M long
3-Nov-13 Page 1 of 4
Global Business Project Management Lecturer:
Assessment Deliverables
1. Concept stage
3-Nov-13 Page 2 of 4
Global Business Project Management Lecturer:
3-Nov-13 Page 3 of 4
Global Business Project Management Lecturer:
6. Annexes
The Project Dossier should not exceed 40-50 A4 pages
Recommended format: minimum of 2cm margins, font size 12pt 1.5 Line spacing
All rest material (articles, research results, statistical data, resources, complex
graphic, interviews plans etc.) should be included in the annexes and should
serve the purpose of supporting the Project Dossier’s content and assumptions
Presentation – Structure
Based on the project dossier
The power point presentation should contain 25-35 slides
It must be tested prior to the final presentation on the class’s projection
equipment
The group presentation should explain and reflect the Project Concept and
business case.
The structure of the presentation is free, however it is highly advisable to
generally adapt the Project Dossier’s (Above) structure as mentioned before.
Please keep in mind that presentations should be short, concise and less
comprehensive than the Project Dossier.
Please notice:
Failure to meet the final Project Dossier submission deadline on June16th 2014,
will be penalized
Version discrepancies or incomplete submitted final documents will be penalize
Unjustified absence of one of the team’s members will result in an F for the
particular individual
3-Nov-13 Page 4 of 4