2.estimate Temp Bamboo Bridge

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

ESTIMATE

NAME OF WORK : CONSTRUCTION OF TEMPORARY BAMBOO FOOT BRIDGE AT THE APPROACH TO BORDUBI ME SCHOOL
Name of G.P : LOHIT KHABOLU GAON PANCHAYAT
Estimated Amount : Rs. Span 50
Width 2.50
ITEM OF WORK
Item No. 1. (8.1.17)Providing bamboo maruli ties, purlins, rafters including tying with cane sling / Galvd. tying wire.(a) With Bhaluka bamboo.
Piers @ 2 m c/c 2 27 7 378.000 m
Diagonall battens @ 5 m c/c 2 10 7 140.000
Total = 518.00 m
@ Rs. ₹ 34.49 /RM__________________________________________________________ ₹ 17,865.82

Item No. 2. (8.1.17)Providing bamboo maruli ties, purlins, rafters including tying with cane sling / Galvd. tying wire.(a) With Jati bamboo.
Transverse beam @ 0.5 m c/c 1 101 2.50 252.500 m
Longitudinal beam @ 0.5 m c/c 1 5 50 250.000 m
Hand railing 2 2 50 200.000 m
2 27 3 162.000 m
Total = 864.50 m
@ Rs. ₹ 24.97 /RM__________________________________________________________ ₹ 21,586.57

Item No. 3. (8.1.16)Providing single layer of bamboo mat lining over roof frame.
Bamboo mat flooring 1 1 50 2.50 125.000 m2
Total = 125.00 m2
@ Rs. ₹ 104.91 /m2__________________________________________________________ ₹ 13,113.75
50
M

2.50 M

2
m

5
m