SMP For Dry Ash Unloader
SMP For Dry Ash Unloader
FOR
OBJECTIVE
The purpose of this work instruction is to explain the procedure for carrying out Overhaul of
DRY ASH UNLOADER
Make: ZHENJIANG AUXILIARY MACHINERY FOR POWER STATION PLANT;TYPE: ZSJ 200B;
Capacity: 200TPH;
DETAILED INSTRUCTION
Sr. Activity Responsibility
No.
I Overhaul to be done as per Checklist
REVIEW DATE:-
SMP WILL BE REVIEWED IN EVERY SIX MONTH FROM THE DATE OF
ISSUE BASED ON ACTUAL PROBLEM FACED AND SHALL BE UPDATED
ACCORDINGLY.
MECHANICAL MAINTANENCE TEAM WILL VISIT THE EQUIPMENT
TWICE IN A WEEK & IF ANY ABNORMALITY NAMELY (VIBRATION,
ABNORMAL SOUND, TEMPERATURE RISE, BELT TIGHTNESS ETC) OF
EQUIPMENT IS OBSERVED AND THEN THE SAME WILL BE RECTIFIED
WITHIN PRESCRIBED TIME PERIOD.
DO’s :
2. Ensure relevant equipment/system is electrically isolated before starting the work, if applicable.
3. Ensure relevant air/water valves are fully closed for the equipment/system before starting the work.
4. Provide Danger Boards before starting the work involving dismantling of any equipment/system.
6. Ensure proper follow-up of all plant practices, existing regulations, prescribed procedures & general
safety prior to carry out any work.
7. While replacing any spares/oil, ensure that the same must be as per OEM recommendation.
9. Always use the special tools as recommended by OEM for certain equipments like HCSD Pump.
DONT’s :
1. Don’t start the work without presence of Safety Personnel in case fire / other hazards are involved.
3. Don’t use tools & tackles which are not calibrated / certified by relevant authority.
4. Don’t start the work in Pressure Vessels/Pressure Line/Water Line, unless it is completely de-
pressurised.