COLUMN (TYP.

PILE CUT-OFF LEVEL= (C) COLUMN (TYP.) 4500x1000 TIE BEAM 1968 4500 7064 4500 1968
7530 4500 3440 4500 7530 4500x1000 TIE
PILE CUT-OFF LEVEL= (C)
PILE CAP TOP EL= (A) BEAM PILE CAP TOP EL= (A)

1000

1000
7940 11564
3000

3000
SEE DETAIL-'A' SEE DETAIL-'A'
PILE CAP BOTTOM EL= (B) PILE CAP BOTTOM EL= (B)

75 CC 75 CC
IN-SITU RC PILE IN-SITU RC PILE
75 BFS 75 BFS

2500 7500 7500 7500 2500 2500 7500 7500 2500

27500 20000

FRONT ELEVATION OF PILE CAP (VIEW A A) FRONT ELEVATION OF PILE CAP (VIEW B B)
SCALE = 1:200 SCALE = 1:200
PILE CAP TOP EL= (A)

3000
PILE CAP BOTTOM EL= (B)

27500

2500 7500 7500 7500 2500 X X


B PILE CUT-OFF LEVEL= (C)
1968

4218

2500
75 CC
IN-SITU RC PILE
75 BFS
4500

IN-SITU RC PILE (TYP.)

PILE DESIGN CAPACITY = 3060 T


7500
9780 7940 9780

4500x1000 TIE BEAM (TYP.)

L = 130.0m
20000

11564
7064

2500

4500 4500 FOR TIE BEAM REINFORCEMENT


REFER SUBSTRUCTURE DRAWINGS.
7500

NOTE : -
1) ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED
4500

2) DURING CONSTRUCTION WORK, THE CONTRACTOR SHOULD VARIFY


COLUMN (4 Nos) TYP. THE PILE DESIGN CAPACITY BY CONDUCTIONG SUBSOIL INVESTIGATION PILE TIP EL= (D)
AND PILE LOAD TEST.
3) DURING CONSTRUCTION WORK, THE CONTRACTOR SHOULD ADJUSTED
2500
4218

2500

THE PILE CAP POSITION CONSIDERING LTL OR ANY SUTABLE LOCATION


1968

OR AS PER SITE CONDITION.


4) BASE AND SHAFT GROUTING SHALL BE CARRIED OUT AS PER THE ELEVATION OF CAST IN-SITU RC PILE
7530 4500 3440 4500 7530 DETAILS GIVEN IN THE DRAWING: RHD/PAIRA BRIDGE/MISC-18/R0
(DETAILS OF PILE GROUTING)
27500 5) ACCESSORIES FOR ULTRA SONIC TEST SHALL BE PROVIDED BEFORE
CASTING .
PLAN OF PILE CAP B 6) PILE CAPACITY SHOWN IS WITH GROUP EFFECT 0.67.
A SCALE = 1:200 A

LEGEND :
LTW LOW TIDE WATER LEVEL
PCT PILE CAP TOP ELEVATION
PCB PILE CAP BOTTOM ELEVATION