g) Hard core
1 940.49 1.00 1.00 940.49 All
940.49 m2
2. CONCRETE WORK
I) Lean Concrete
a) Under footing pad
4 1.30 1.30 1.00 6.76 F1
3 1.35 1.35 1.00 5.47 F2
5 1.55 1.55 1.00 12.01 F3
3 2.05 2.05 1.00 12.61 F4
12 1.40 1.40 1.00 23.52 CF1
16 1.60 1.60 1.00 40.96 CF2
4 1.60 3.10 1.00 19.84 CF3
4 2.10 3.10 1.00 26.04 CF4
2 2.10 3.10 1.00 13.02 CF5
1 2.60 2.60 1.00 6.76 CF6
940.49
Total Sum 1,060.94 m2
b) Foundation Columns
27 2.20 0.35 0.45 9.36 C1
14 2.20 0.35 0.45 4.85 C2
5 2.20 0.25 0.25 0.69 C3
c) Form work
a) Footing
4 1.20 4.00 0.25 4.80 F1
3 1.25 4.00 0.30 4.50 F2
5 1.45 4.00 0.35 10.15 F3
3 1.95 4.00 0.45 10.53 F4
12 1.30 4.00 0.35 21.84 CF1
16 1.50 4.00 0.40 38.40 CF2
4 1.50 4.00 0.50 12.00 CF3
4 2.00 4.00 0.50 16.00 CF4
2 2.00 4.00 0.50 8.00 CF5
1 2.50 4.00 0.40 4.00 CF6
b) Foundation Columns
27 2.20 2.00 0.80 95.04 C1
14 2.20 2.00 0.80 49.28 C2
5 2.20 2.00 0.50 11.00 C3
EXPANSION JOINT
B. SUPER STRUCTURE
1. CONCRETE WORK
I) Reinforced Concrete in
a) In elevation columns
column
27 5.52 0.35 0.40 20.87 C1
14 5.52 0.35 0.40 10.82 C2
5 2.76 0.25 0.25 0.86 C3
E) Floor Slab
1 183.24 0.15 1.00 27.49
F) TOP Slab
1 183.25 0.15 1.00 27.49
d) Staircase
16 0.91 1.65 1.00 24.02 RIZER AND TREAD
2 5.07 1.65 1.00 16.73 SOFFIT
1 1.40 1.65 1.00 2.31 LAND
c) Form work
a) In elevation columns
Column
27 5.52 0.75 2.00 223.56 C1
14 5.52 0.75 2.00 115.92 C2
5 2.76 0.50 2.00 13.80 C3
d) Staircase
16 4.95 1.00 1.00 79.20 RIZER AND TREAD
2 1.11 1.00 1.00 2.21 SOFFIT
1 2.31 1.00 1.00 2.31 LAND
d) Solid slab
1 183.24 1.00 1.00 183.24
Truss
RHS ROOF TRUSS
120X80X5MM
2 13.7 1 1 27.42 T1
Total Sum KG
ATO ERMMIAS FIKRE ST TAKE OFF
120X60X5MM
2 11.6 1 1 23.16 T2
Total Sum KG
100X100X4MM
1 39.5 1 1 39.52 T3
1 9.4 1 1 9.40 T4
Total Sum KG
80X80X3.6MM
1 23 1 1 22.51 T2
1 28.3 1 1 28.28 T5
1 24.8 1 1 24.82 T6
Total Sum KG
50X50X3.2MM
2 0.5 1 1 0.96 T3
2 1.5 1 1 3.08 T4
2 2.7 1 1 5.42 T7
Total Sum KG
80X40X3.2MM
2 8.5 1 1 17.00 T1
1 13.9 1 1 13.89 T5
1 12.1 1 1 12.12 T6
Total Sum KG
80X80X5MM
1 26.8 1 1 26.78 T1
Total Sum KG
ATO ERMMIAS FIKRE ST TAKE OFF
120X60X3.6MM
1 26.8 1 1 26.78 T1
Total Sum KG
40X40X3.2MM
1 12.0 1 1 11.98 T1
1 4.5 1 1 4.50 T2
1 3.0 1 1 2.98 T3
1 1.5 1 1 1.47 T4
1 3.1 1 1 3.06 T7
Total Sum KG
30X30X3.2MM
1 5.9 1 1 5.86 T1
1 3.3 1 1 3.34 T2
1 1.0 1 1 0.96 T3
1 3.1 1 1 3.08 T4
1 1.4 1 1 1.40 T5
1 1.4 1 1 1.40 T6
Total Sum KG
60X40X3.2MM
1 6.4 1 1 6.36 T2
1 14.1 1 1 14.08 T3
1 13.7 1 1 13.68 T4
1 3.3 1 1 3.34 T7
Total Sum KG
ATO ERMMIAS FIKRE ST TAKE OFF
70X70X3.6MM
1 22.5 1 1 22.49 T2
1 19.4 1 1 19.43 T3
1 18.2 1 1 18.18 T4
Total Sum KG
50X30X3.2MM
1 7.3 1 1 7.28 T5
1 7.2 1 1 7.16 T6
Total Sum KG
Total Sum KG
ATO ERMIAS FIKRE AR TAKE OFF
1) WALLING
Typical floor
DDT
Ground floor
Typical floor
4 44.45 2.88 512.06 All
DDT
Page 12
ATO ERMIAS FIKRE AR TAKE OFF
Ground floor
Typical floor
Page 13
ATO ERMIAS FIKRE AR TAKE OFF
Ground floor
Typical floor
Ground floor
2) ROOFING
EGA Roofing
Cement screed
Flashing
3) METAL WORK
Hand rail
Page 14
ATO ERMIAS FIKRE AR TAKE OFF
Guard rail
chipwood
Built In Cuboard
Total Sum -
Total Sum -
Kiichen cabinet Floor Mounted
Total Sum -
5) FINISHING WORKS
Page 15
ATO ERMIAS FIKRE AR TAKE OFF
d) Three coats of plastering to concrete ceiling ,concrete gutter,pergolas and stair soffits
a) Ceramic FF
b) PVC FF
Page 16
ATO ERMIAS FIKRE AR TAKE OFF
c) Marble FF
d) Wooden FF
SKIRTING
a) Ceramic skirting
b) PVC skirting
c) Marble skirting
d) Wooden skirting
e) Windo cill
9 1.30 11.70 W1
2 1.85 3.70 W2
Page 17
ATO ERMIAS FIKRE AR TAKE OFF
1 0.90 0.90 D1
9 0.90 8.10 D2
6 0.80 4.80 D3
g) Marble Riser
Page 18
ATO ERMIAS FIKRE AR TAKE OFF
Page 19
Item
no Description Unit Qty Rate Amount
FOR
B+G+9 XXXXX
A - SUB STRUCTURE
B - SUPER STRUCTURE
1.01 Clear and remove top soil to an average depth of 200mm. M2 443.54
1.02 Bulk excavation in ordinary soil not exceeding150cm from NGL. M3 665.31
1.04 Bulk excavation in ordinary soil not exceeding 300cm -450cm . M3 665.31
1.05 Bulk excavation in ordinary soil not exceeding 450cm -600cm . M3 221.77
Backfill under hard core with non-expansive selected material from quarry and compact in
layers not exceeding 200mm thick by sprinkling water to insure 95% modified AASHTO dry
1.06 density. M3 204.30
Backfill under mat with non-expansive selected material from quarry and compact in layers
not exceeding 200mm thick by sprinkling water to insure 95% modified AASHTO dry
1.07 density. M3 81.72
Backfill under hard core with non-expansive selected material from site and compact in
layers not exceeding 200mm thick by sprinkling water to insure 95% modified AASHTO dry
1.08 density. M3 204.30
1.09 Cart away surplus excavated material to a distance not exceeding 5kms. M3 2,262.07
250mm thick sound basaltic or equivalent stone hard-core finished and blinded with crushed
1.10 stone. M2 408.60
2. CONCRETE WORK
2.01
50 mm lean concrete quality C-5, with minimum cement content of 150 kg /m3, of concrete:
2.02
Lean concrete quality C-15, with minimum cement content of 150 kg /m3, of concrete:
a) 100mm thick lean concrete under 100mm thick basement floor slab . M2 408.60
2.03 Reinforced concrete quality C-25,360 kg of cement/m3 filled in to form work and vibrated
around rod reinforcement (Formwork and reinforcement measured separately) .
f) In Ramp M3 1.85
g) In Gread Beam M3 13.49
h In staire Case M3 5.01
2.04 Reinforced concrete quality C-30,400 kg of cement/m3 filled in to form work and vibrated
around rod reinforcement (Formwork and reinforcement measured separately) .
2.05 Provide, cut and fix in position sawn structural wood or steel formwork which ever is
appropriate shall be constructed to the exact sizes, shapes lines and dimensions
shown and as required to obtain accurate alignment, location grade, level and plumb work in
finished structures. Provision shall be made for openings, offset, sinking, keyways, recesses,
moldings, reglets, chamfers, blockings, screeds bullheads, anchorages, inserts and other
features as required..
c) In Mat Beam M 2
222.78
g) In Basement columns M 2
95.59
2.06 Mild steel reinforcement according to structural drawings. Price includes cutting, bending,
placing in position,tying wire and concrete spacers.
2.07 supply and fix 25 x 100mm stayrafoam or equivalent expansion joint filler between Basement
beams and basement floor slab Ml 273.90
TOTAL CARRIED TO SUMMARY ...................................................
3. MASONRY WORK
400mm thick hard trachytic roughly dressed stone masonry foundation wall below ground level
3.01 bedded in cement mortar mix ratio (1:3) M3
400mm thick hard trachytic semi dressed stone masonry exposed Above ground level bedded in
3.02 cement mortar mix ratio (1:3)including pointing. M3
B-SUPER STRUCTURE
1. CONCRETE WORK
Reinforced concrete quality C-25,360 kg of cement/m3 filled in to form work and vibrated
around rod reinforcement (Formwork and reinforcement measured separately).
1.01
Reinforced concrete quality C-30,400 kg of cement/m3 filled in to form work and vibrated
around rod reinforcement (Formwork and reinforcement measured separately) .
1.02
Provide, cut and fix in position sawn structural wood or steel formwork which ever is
appropriate shall be constructed to the exact sizes, shapes lines and dimensions shown and
as required to obtain accurate alignment, location grade, level and plumb work in finished
structures. Provision shall be made for openings, offset, sinking, keyways, recesses,
moldings, reglets, chamfers, blockings, screeds bullheads, anchorages, inserts and other
features as required..
1.03
Mild steel reinforcement according to structural drawings. Price includes cutting, bending,
1.04 placing in position , tying wire, concrete spacers and chairs.
2. BLOCK WORK
Class B, 200mm thick HCB wall with the designed compressive strength , bedded in cement
M2
2.01 mortar (1:3). 1,723.49
Class B, 150mm thick HCB wall with the designed compressive strength , bedded in cement
M2
2.02 mortar (1:3). 3,310.69
Single brick wall with the designed compressive strength , bedded in cement mortar (1:3). M2
2.03 478.63
Supply and fix perforated (Orcal) metal Armstrong ceiling or equivalent complete with
fixing accessories, or equivalent, hanged from concrete slab prepared for recessed light
fittings to toilet room According to the detail drawing & engineers approval.
3.01 M2 371.36
3.03 PURLINE
Supply and fix 50x70mm zigba wood purlin as per the detail drawing. Price shall include anti
termite treatment and all necessary accessories.
Ml 192.23
4. ROOFING
Deckra Roofing cover fixed to 50 x 70mm zigba wood purlin, with standard hooks and
washers. Price includes all necessary accessories. (Roof cover measured in horizontal
4.01 projection) M2 371.36
Supply & fix 110mm diameter PVC down pipe secured to wall with metal bracket with ancorage
4.02 distance of 800mm. M2 649.99
5. ALUMINIUM WORK
Supply and fix ALLCO-5 1.8mm thick average weight 850m/ml anodized aluminum
Curtain Wall framed window-doors, doors and /or windows. All according to the detail
drawing and schedule. Price shall include genuine accessories like connectors, ASSA or
equivalent cylindrical lock and handle with weather gasket and approved quality structural
silicon. The profile should have Curved glass stopper with its connector at corners, kick plat,
handle fascia and all complete accessories. Structural T-sections shall be used for window-
doors,doors and/or windows having greater or equal to 3meters height. Including
Spporting.
5.03 Aluminum Window as per the attached drawing window size Schedule.
Supply and fix 1.25mm thick 28mm wide black iron LTZ section steel profile frame metal window
and door including all the necessary accessories. Unit price includes best quality cylindrical door
lock, one coat of anti-rust and two coats of synthetic enamel paint all according to the detail drawing:
Supply and fix Art Metal guard rail & balustrade around Veranda to aheight 90cm according the
6.01 drawing.price shall including bolted metal plate.as per the detail drawing. Ml 200.97
Apply two coats of plastering in cement mortar ( 1:3) price shall include exposed surface of
beam & column,pre cleaning and preparation of the surface.
7.01
8. FINISHING
Supply and lay 400 x 400 x 6mm approved type non slippery ceramic tile flooring on and
8.01 including 2mm thick cement sand screed bedding. M2 73.77
Supply and lay 600 x 600 x 8mm approved type non slippery Porcelian tile flooring on and
8.02 including 2mm thick cement sand screed bedding adhesives. M2 736.95
20mm thick polished and varnished Local Tid Wood Parque flooring stuck down with approved type
of glue on cement sand screed bedding.
8.03 M2 80.96
15x70 mm polished and varnished wood skirting stuck to wall with approved type of glue and
8.04 screw (price shall include fixing accessories and varnish paint). Ml 74.80
8.05 Supply and fix 10 x100mm high porcelian skirting to wall with cement sand mortar backing. Ml 1372.80
8.06 Supply and fix 10x100mm high Ceramic skirting to wall with cement sand mortar backing. Ml 162.80
450 x 300 x 8mm white glazed ceramic wall tile for toilet, loundary and kitchen stuck to wall
with cement mortar 1:3 to a height of has full height from finished floor level. Price includes
8.07 white cement. M2 966.94
300x20mm approved type white marble window sill cut to appropriate size, weathered and
mounted on & including 30mm thick cement mortar (1:3) bedding. Price includes bull nosing
8.08 and making water drip as shown on the detail drawing Ml
Supply and lay 600x600mmx8mm porceline tile for lift shaft wall clading with cement
8.10 mortar 1:3 adhesives to a Price includes white cement. M2 43.08
Supply and lay 10mmx100mm High Marble Skerting for Staire Case and including 2mm
8.11 thick cement sand screed bedding. Ml 72.27
2.5 m wide Concrete Pavement around the building with 10 cm thick mass concrete bedded
on 100mm thick sand/red ash base with an expansion joint at 1m interval. Price shall
8.12 include excavation and back fill to average depth 50cm work. M2 170.94
8.13 Supply & Lay Dia 30cm concrete half ditch bedded on 100mm thick sand/red ash. ml 85.47
9. GLAZING
9.01 5mm thick clear glass glazed to Aluminum beads and approved quality gomini or seal. M2
6mm thick clear glass glazed to Aluminum beads and approved quality gomini or seal.
9.02 M2
10. PAINTING
Apply three coats of approved quality plastic paint.Price shall include pre-cleaning and
10.01 preparation of surfaces.
Apply APP modified & thickness not less than 4mm slated finish Water Proofing Membrane
or compatible equivalent material for R.C retaining wall in basement and semi-basement
floors as per the manufacturer's instructions and recommendations as shown on the
drawing. The cost shall include cleaning of all dirts and dust materials and all incidental
works and details of manufacturer. The work shall be done on subcontractual base with the
supplier of the material which will give material and construction guarantee to the client .
11.01