Professional Documents
Culture Documents
JSA Employees
JSA Employees
JSA Employees
4. Site emergencies 4. Mobile phone to be carried in pocket at all times when on site
5. Working alone 5. Contact office per woring alone procedure
JOB/ TASK : Roof Maintenance on a Residential Building DATE :
2 Setting up 1. Pets – agression or stability of ladder 1. Resident to secure pets
2. Prower lines 2. Check Clearance to power lines do not place access ladder
3. Electric Shock within 3 metres of power or other unidentified cables
H 3. If access to roof space is required,power to be turned off in M
meter box
3 Access to Roof 1. Strains and sprains 1. Streching exercise before lifting ladder from vehicle
2. Fall from ladders 2. Ladder to be on level compacted ground, check stability of
ladder before climbing up,
Only access roof via complaint lladeer
H Do NOT Climb up Scaffolding to roof or other platform, M
Ladder not to be used to perform work,
Use of tool belts to carry tools is recomendd
4 Working on Roof 1. Site Hazards – 1. As per Site Safety Report.
Dust / wet / oily roof ( slippery ) Consider the following controls, only proceed if the risk is
Trips / Slips acceptable
Antennas, Satelite dish, Solar panels etc Frequently clean soles of footwear
Feces and walls in fall zone Continually check Surroundings, look out for the
roof fixtures
Do not work above hazard if roof is damp or slippery
Do not work close within 2 metres of edge
Do not answer or make phone calls while on roof
2. Scaffolding required for 2 storey buildings or if worker is over
3 metres above ground be aware of weather forecast and
2. Falls monitor conditions often refer to code of practice for the
prevention of falls in the worklace for additional guidance if
require
3. If Sheets / flashing too long for worker to manage, call
supervisor and ask for assistance
3. Strains and sprains