I Pekerjaan Persiapan
1 Mob Demob alat dan Pekerja 1.00 0.39 0.0386 0.0386 0.0386 0.0386 0.0386 0.0386 0.0386 0.0386 0.0386 0.0386
2 Bedeng Pekerja 1.00 0.77 0.7727
3 Air dan Listrik Kerja 1.00 0.23 0.0232 0.0232 0.0232 0.0232 0.0232 0.0232 0.0232 0.0232 0.0232 0.0232
Jumlah Pek. Persiapan 1.39 0.83 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06
II Pekerjaan Tanah
1 Galian Tanah 45.93 0.27 0.0391 0.0391 0.0391 0.0391 0.0391 0.0391 0.0391
2 Striping permukaan tanah (t=10 cm) 2,023.25 1.50 0.1876 0.1876 0.1876 0.1876 0.1876 0.1876 0.1876 0.1876
Jumlah Pek. Tanah 1.77 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.19 - -
RENCANA PROGRESS 100.00 1.06 3.14 7.02 7.02 14.46 17.41 17.41 16.71 7.88 7.88
KUMULATIF RENCANA - 1.06 4.20 11.22 18.24 32.70 50.11 67.52 84.24 92.12 100.00
REKAP RENCANA ANGGARAN BIAYA
PEKERJAAN JALAN PAVING BLOCK DAN KANSTIN
PUSDIKLAT PPSDM KEMENTERIAN ATR/BPN
JL. Akses Tol Cimanggis, Wanaherang, Gunung Putri . Bogor
NO URAIN PEKERJAAN JUMLAH
I Pekerjaan Persiapan
1 Mob Demob alat dan Pekerja 1.00 Ls 2,500,000.00 2,500,000.00
2 Bedeng Pekerja 1.00 Ls 5,000,000.00 5,000,000.00
3 Air dan Listrik Kerja 1.00 Ls 1,500,000.00 1,500,000.00
Jumlah Pek. Persiapan 9,000,000.00
II Pekerjaan Tanah
1 Galian Tanah 45.93 m3 38,600.00 1,772,887.00
2 Striping permukaan tanah (t=10 cm) 2,023.25 m2 4,800.00 9,711,576.00
Jumlah Pek. Tanah 11,484,463.00
1 M2 PENGECATAN KANSTIN
NO URAIAN KOEF SATUAN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A Material
Material
1 Pasir pasang m3 225,000.00
2 Pasir Urug m3 175,000.00
3 PC Zak 56,000.00 1,400.00 /kg
4 Cat Kanstin kg 68,000.00 335,000.00 5 kg
Harga (Rp/m2) Harga (Rp/m2) Isi Per
Tipe Tebal
Warna (Natural) Warna (Merah) M2
Bata (21 x 10.5 cm) 6 cm 71,500.00 74,000.00 44.00
Bata (21 x 10.5 cm) 8 cm 81,500.00 84,000.00 44.00
Cacing (22.5 x 11.2 cm) 6 cm 71,500.00 74,000.00 39.00
Cacing (22.5 x 11.2 cm) 8 cm 81,500.00 84,000.00 39.00
Trihex (19.7 x 9.6 cm) 6 cm 71,500.00 74,000.00 39.00
Trihex (19.7 x 9.6 cm) 8 cm 81,500.00 84,000.00 39.00
Ubin Besar (21 x 21 cm) 6 cm 86,500.00 89,000.00 22.00
Ubin Besar (21 x 21 cm) 8 cm 96,500.00 99,000.00 22.00
Segi Enam (20 x 20 cm) 6 cm 71,500.00 74,000.00 25.00
Segi Enam (20 x 20 cm) 8 cm 81,500.00 84,000.00 25.00
Isi Per
Tipe Tebal Harga
M'
kanstin Jepin
kanstin Terotoar
Kanstin Tipe Taman (Jepi 40x20x10 cm 17,500.00 2.50
Kanstin Tipe Trotoar 40x25x15x13 cm 27,000.00 2.50
Kanstin Tipe Trotoar 40x28x15x13 cm 32,500.00 2.50
Kanstin Tipe S 40x15x30x8 cm 32,500.00 2.50
Kanstin DKI 60x25x22x18 cm 57,500.00 1.60
Kanstin DKI Jumbo 60x30x25x20 cm 67,500.00 1.60
Volume Pekerjaan
Lapangan Bekumpul 9.75 + 0.075 + 0.075 = 9.90
10.00 + 0.075 + 0.075 = 10.15 x
100.485 m2