PLN (PERSERO)
PENYALURAN DAN PUSAT PENGATUR BEBAN (P3B) SUMATERA
UNIT PELAYANAN TRANSMISI PEMATANG SIANTAR
A Pemeliharaan Jaringan
1 Compression Dead-end Clamp for ACSR 240/40 mm² set 5
2 Parallel Grove for GSW 55 mm² set 80
3 I-Clamp Connector for ACSR 240/40 mm² set 12
4 T-Clamp Connector for ACSR 240/40 mm² set 5
5 Parallel Grove for ACSR 240/40 mm² set 22
7 Repair Sleeve for ACSR 435/56 mm² set 5
8 Compression Dead-end Clamp for ACSR 435/55 mm² set 5
9 Midspan Joint for ACSR 435/55 mm² set 5
JUMLAH A
B Pemeliharaan Gardu Induk
1 Terminasi Outdoor Kabel Power 630 mm² kit 3
2 Terminasi Indoor Kabel Power 630 mm² kit 3
3 Terminasi Outdoor Kabel Power 400 mm² kit 2
4 Terminasi Indoor Kabel Power 400 mm² kit 3
5 Cable Schoen Power (Bimetal) AL/CU 630 mm² bh 12
6 Cable Schoen Power (Bimetal) AL/CU 400 mm² (Ring) bh 12
7 Heat Shrink 85 mm² 24 kV m 48
8 T-Clamp Connector for AAC 630 mm² to AAC 630 mm² bh 3
9 T-Clamp Connector for AAC 630 mm² to AAC 400 mm² bh 3
10 T-Clamp Connector for AAC 1000 mm² to AAC 630 mm² bh 3
11 I-Clamp Connector for AAC 630 mm² to AAC 630 mm² bh 6
12 I-Clamp Connector for AAC 630 mm² to AAC 400 mm² bh 3
13 I-Clamp Connector for AAC 1000 mm² to AAC 630 mm² bh 4
14 I- Plat Clamp Connector for AAC 630 mm² (20x120x120) bh 4
15 L-Plat Clamp Connector for AAC 630 mm² (20x120x120) bh 6
JUMLAH B
C Pemeliharaan PMO
1 MCB 1 Pole 6A set 3
2 MCB 2 Pole + 1 NC 16A set 4
3 MCB 3 Pole + 1 NC 6A set 3
4 Aux Relay 110 VDC + Socket (4 Pole) 6A set 6
5 Aux Relay 220 VDC + Socket (4 Pole) 6A set 4
6 Kabel NYAF 1.5 mm² ( 1 rol = 100m) rol 4
7 Kabel NYAF 2.5 mm² ( 1 rol = 100m) rol 4
8 Kontaktor 220 VAC + 1 NO + 1 NC 6A set 4
9 Kontaktor 110 VAC + 1 NO + 1 NC 6A set 4
JUMLAH C
Terbilang :
Harga (Rp) Jumlah
Material (Rp)
- -
- -
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
JUMLAH -
PPN 10 % -
TOTAL -
PEMBULATAN -
Diajukan oleh