(Head Letter of Vendor)

CERTIFICATE OF COMPLETION WORK


TRANSFORMER INSULATION OIL TRANSPORTATION , DECANTING AND WASTE
MANAGEMENT ( UNIT-5 )

Name of Project: Tanjung Jati B Expansion (Jawa-4) Coal Fired Steam Power Plant 2 x 1000MW

Name of work : Transfer Insulation Oil Transportation , Decanting And Waste Management ( Unit-%5 )

Location : Tanjung Jati Power Plant, Jepara


Customer : PT Toshiba Asia Pacific Indonesia
Contract No. : TAPIPO1903015

On this day Monday, date 21 Oct 2019, there has been carried out the site inspection of working progress
achievement of PT Puninar Infinite Raya in accordance with the scope of work mentioned by and between
as below;

On the First Party, and:


Company : PT Toshiba Asia Pacific Indonesia
Address : 9th Floor, Summitmas 1
Jl. Jendral Sudirman kav.61-62 Jakarta, 12190

On the Secondary Party, and:


Company : PT Puninar Infinite Raya
Address : Jl Raya Cakung Cilincing KM 1,5 RT 017 RW 007 Cakung Barat – Cakung
Jakarta Timur

With the result as following:

Progress on 29 June 2019 – 24 July 2019 (final): 1,167,063 mm (1,167.063 m)

Description Total Length (m) Unit Price (IDR) Total Actual Price
A B AxB
Pipe Diameter (65-100)
Pipe Diameter (125-200)
Pipe Diameter (250-800)

Both parties are agreed that the work has been finished 100% (completion) for above contract name which
has been satisfactory completed by (PT XXXX).

First Party, Secondary Party,

PT Puninar Infinite Raya PT Toshiba Asia Pacific Indonesia


Signed by: Signed by:
(Head Letter of Vendor)