Soldier Pile Retaining Wall – Components and Design

 Soldier pile retaining wall is usually employed for situations where the earth backfill is
needed to be retained temporarily for example at construction site. Soldier pile wall consist
of wide flange steel beams (soldier piles) and wood lagging.
 The former is either forced into the ground to an adequate depth or installed into holes,
which are drilled in advance, then encased in lean concrete to oppose or withstand the
moment exerted by soil and the spacing is commonly between 1.8 m to 2.45 m. The latter is
placed horizontally after excavation is completed and supported by soldier pile flanges at its
ends.
 Soldier piles are cantilevered, but tie backs can be used to decrease embedment depth and
size of the beams in cases where the height of the wall is greater than 4.5 m and enough
space is available for using the ties.

Components Of Soldier Pile Retaining Wall

Figure-1: Typical Soldier Pile Retaining Wall Components


Design of Soldier Pile Retaining Wall

Data Required for Soldier Pile Wall Design

These includes nature of the soil, friction angle of the soil, density of the soil, passive and active
allowable pressures, arching factors to use, and other recommendations which specifically
related to the site. Finally, Choose cost effective beams.

Soldier Pile Wall Design Procedures

In the design methodology, which is explained in the following section, certain assumptions are
made. Firstly, it is assumed that the soil is non-cohesive or sandy otherwise, for example when
the soil type is clay, different passive resistant diagram should be employed. Secondly, this
procedure is applicable for cantilevered soldier pile walls therefore using tiebacks is not
accounted for in this methodology.

Design steps:

1. Compute forces which are exerted by construction surcharges and pressure of active soil
tributary to each soldier pile, Rankine formula could be used for calculation of active pressure
coefficient (Ka).

2. Spacing of the piles is determined depend on beam size, embedment depth, and choosing of
lagging. Several design calculations may be necessary to use to determine the best spacing
option.

3. Determine embedment depth after both surcharge (Pw) and active pressure (Pa) is
calculated. Figure-2 shows different forces which cantilevered soldier pile wall subjected to in a
sandy soil.

The embedment depth (d) of the pile is computed using equation-1 and it is the function of
passive pressure and arching factor which is denoted as (f) and taken as 0.08 but should not
surpass 2.5.
Where:

d: is the effective depth at zero shears.

Pp: is the force which opposes and equal to (Pw+ Pa)

SF: is the Safety factor used for allowable passive pressure

P: is the Allowable passive pressure

D: is the hole diameter or flange width whichever is utilized.

A: arching factor multiplier

Figure-2: Various forces acting on cantilevered soldier pile on non-cohesive soil


4. Calculate maximum beam moment by taking moment summation above zero shear point.
The following equation can be used straight away.

5. The maximum moment is opposed by passive pressure couple consisting of 0.67D*Fp, so the
required depth is calculated as:

And required embedment depth which is denoted as (E) in figure-1, is combined of (D+d), and
as rule of thumb it can be taken between 1.3H to 1.5H.

6. load resistance factor design (LRFD), which is achieved by maximum moment times load
factor of 1.6, is used to select various beam options from AISC 13-edition, LRED, steel design
hand book after chose most economical and available beam.

7. Choose lagging which must be treated wood and conservative fiber stress is 6.2 MPa. Lateral
earth pressure is decreased over the wall height from the base to the top.

Therefore, different lagging thickness can be used at various depths. Due to soil arch action
between beams, 80% of the simple moment of each lag can be used in addition to providing 25
cm space between lags for allowing water drainage.

Using Tiebacks in Soldier Pile Retaining Walls

Tiebacks are used when the height of the wall exceeds 4.5m and adequate space is available.
Not only is tieback utilization decline the size of soldier piles but also the embedment depth.

Generally, tiebacks are steel rods which are placed into a 7.62 mm drilled hole into the backfill
an adequate distance that exceeds failure plane for providing anchorage after grouting.
Tiebacks are inclined downward at 15o to enhance pulling out resistance and to facilitate
grouting. The outside ends of tiebacks are welded to steel beams. Figure-3 shows forces acting
on soldier pile in the case where tiebacks are used.

Figure-3: Forces Acting on Soldier Pile after using Tieback

Moreover, the embedment depth should be adequately withstanding the applied lateral
forces Pw and Pa. Finding (d) is an iterative process; the value by which active and passive
balance is obtained will be (d). After that the maximum bending moment could be computed by
applying statics.