PLOT WISE POWER DEMAND CALCULATION & TRANSFORMER SIZING FOR ABD RANCHI SMART CITY

Product Mix Occupancy Power Power Demand in Power Demand in Selected Incoming Power supply Source
factor Demand in MVA @ 0.98 PF kVA Distribution
Plot No. Area (Acre) A(Ha) FSI/FAR BUA (Sq.m.)
MW Voltage Level
(kV)
8 Health Management & Research Institute 5.6 2.27 2.50 56658 100% 2.11 2.15 2152 33kV
1 Skill development park 6.9 2.79 2.50 69811 100% 2.60 2.65 2651 33kV 33/11kV
7 Arts and Craft Institute 5.6 2.27 2.50 56658 100% 2.11 2.15 2152 33kV SUB-STATION-2
42 Mall 5.8 2.35 4.00 93890 100% 2.98 3.05 3045 33kV
TOTAL LOAD IN (33KV RING-1) 23.9 9.7 277017.2 9.8 10.0 10000
28 5 Star Hotel -1 5 2.02 4.00 80940 100% 2.57 2.63 2625 33kV
32 Five Star Hotel -2 5 2.02 4.00 80940 100% 2.57 2.63 2625 33kV
33/11kV SUB-STATION-1 AT MRSS
33 Commercial Tower 4.2 1.70 4.00 67990 100% 2.16 2.21 2205 33kV
TOTAL LOAD IN (33KV RING-2) 14 6 229870 7 7.5 7455
34 Commercial / Office -3 8.3 3.36 4.00 134360 100% 4.27 4.36 4358 33kV
4 JUMPI 7.5 3.04 2.50 75881 100% 2.82 2.88 2882 33kV
TOTAL LOAD IN (33KV RING-3) 15.8 6.4 210241.7 7.1 7.2 7239
11/0.433 kV,CSS-2 WITH 250KVA TR for 0.22 0.23 228 11kV
Mendatory areas (Green / Roads / open area 61.26 24.79 1.00 247929 100%
33/11kV
/ circulation)
SUB-STATION-2
62 Transit Hub-3 1.2 0.49 2.59 12578 100% 0.31 0.32 319 11kV
60 Mix Use-6 5.3 2.14 2.59 55553 100% 1.38 1.41 1407 11kV
17 Residential -1 6.4 2.59 3.41 88322 100% 0.98 1.00 997 11kV
59 Mix Use-5 5.15 2.08 2.59 53981 100% 1.34 1.37 1367 11kV
TOTAL LOAD IN (11KV RING-1) 79.3 32.1 458363.2 4.2 4.3 4317
11/0.433 kV,CSS-1 WITH 250KVA TR for
Mendatory areas (Green / Roads / open area 61.26 24.79 1.00 247929 100% 0.22 0.23 228 11kV
/ circulation)
58 Mix Use-4 (Including Budget Hotels) 2.53 1.02 2.59 26519 100% 0.66 0.67 672 11kV
48 Urban Civic Tower 3.5 1.42 1.50 21247 100% 0.97 0.99 991 11kV 33/11kV SUB-STATION-1 AT MRSS
49 Convention Centre 5 2.02 1.50 30353 100% 1.39 1.42 1416 11kV
37 Vending area -a 1.5 0.61 4.00 24282 100% 0.77 0.79 788 11kV
TOTAL LOAD IN (11KV RING-2) 73.8 29.9 350329.4 4.0 4.1 4094
TOTAL LOAD-1 346.86 140.37 2082203.35 34.38 34.84 34837
5 University Campus -1 25 10.12 2.50 252938 100% 9.41 9.61 9606 33kV
33/11 kV
12 Economics School 5 2.02 2.50 50588 100% 1.88 1.92 1921 33kV
SUB-STATION-3
TOTAL LOAD IN (33KV RING-4) 30.00 12.14 303525.00 11.30 11.53 11527
6 University Campus -2 26.3 10.64 2.50 266090 100% 9.90 10.11 10105 33kV
33/11 kV
15 Institute -1 4 1.62 2.50 40470 100% 1.51 1.54 1537 33kV
SUB-STATION-3
TOTAL LOAD IN (33KV RING-5) 30.30 12.26 306560.25 11.41 11.64 11642
2.32 2.36 2363 33kV
40 4.5 1.82 4.00 72846 100%
Commercial Centre
41 Comm/ Mall / Offices 9.07 3.67 4.00 146825 100% 4.67 4.76 4762 33kV 33/11 kV
44 Medical College 11 4.45 1.50 66776 100% 3.05 3.12 3115 33kV SUB-STATION-4
16 Institute -2 6.3 2.55 2.50 63740 100% 2.37 2.42 2421 33kV
TOTAL LOAD IN (33KV RING-6) 30.87 12.49 350186.91 12.41 12.66 12660
46 Public Facility -1 3 1.21 1.50 18212 100% 0.83 0.85 850 11kV
19 Hostel 9.3 3.76 3.41 128343 100% 0.79 0.81 806 11kV
45 Fire Station 2.7 1.09 1.50 16390 100% 0.75 0.76 765 11kV
33/11 kV
65 Mix Use-9 1.9 0.77 2.59 19915 100% 0.49 0.50 504 11kV
SUB-STATION-3
35 Commercial -4 1.2 0.49 4.00 19426 100% 0.62 0.63 630 11kV
36 Hatt 1.5 0.61 4.00 24282 100% 0.77 0.79 788 11kV

POWER INFRASTRUCTURE
AREA BASED DEVELOPMENT, RANCHI SMART CITY 1/4
Product Mix Occupancy Power Power Demand in Power Demand in Selected Incoming Power supply Source
factor Demand in MVA @ 0.98 PF kVA Distribution
Plot No. Area (Acre) A(Ha) FSI/FAR BUA (Sq.m.)
MW Voltage Level
(kV)
TOTAL LOAD IN (11KV RING-3) 19.60 7.93 226567.25 4.26 4.34 4342
53 Service area -d 4.6 1.86 1.50 27924 100% 1.28 1.30 1303 11kV
68 Mix Use-12 4.6 1.86 2.59 48216 100% 1.20 1.22 1221 11kV
33/11 kV
20 Residential EWS Plot 6 2.43 3.41 82802 100% 0.51 0.52 520 11kV
SUB-STATION-4
70 Transit Hub-4 4.7 1.90 2.59 49264 100% 1.22 1.25 1247 11kV
TOTAL LOAD IN (11KV RING-4) 19.90 8.05 208206.01 4.21 4.29 4291
51 Service area -b 1.9 0.77 1.50 11534 100% 0.53 0.54 538 11kV
18 Residential -2 5.4 2.19 3.41 74521 100% 0.82 0.84 841 11kV
61 Transit Hub-2 3.7 1.50 2.59 38782 100% 0.96 0.98 982 11kV 33/11kV
2 Student Resource Centre 1 0.40 2.50 10118 100% 0.38 0.38 384 11kV SUB-STATION-2
63 Mix Use-7 2.68 1.08 2.59 28091 100% 0.70 0.71 711 11kV
52 Service area -c 1.6 0.65 1.50 9713 100% 0.44 0.45 453 11kV
TOTAL LOAD IN (11KV RING-5) 16.3 6.6 172759.1 3.8 3.9 3910
TOTAL LOAD-2 141.09 57.10 1489703.94 46.82 47.77 47772
31 3 Star Hotel 3 1.21 4.00 48564 100% 1.54 1.58 1575 33kV
30 Retail / Mall-1 6 2.43 4.00 97128 100% 3.09 3.15 3150 33kV
29 Commercial / Office -2 6.25 2.53 4.00 101175 100% 3.22 3.28 3281 33kV
56 Mix Use-2 9.14 3.70 2.59 95803 100% 2.38 2.43 2426 33kV
TOTAL LOAD IN (33KV RING-7) 24.4 9.9 342670.0 10.2 10.4 10433 33/11kV SUB-STATION-1 AT MRSS
54 Transit Hub -1 9.51 3.85 2.59 99681 100% 2.47 2.52 2524 33kV
43 Hospital 14 5.67 1.50 84987 100% 3.89 3.96 3965 33kV
24 Residential -4 11 4.45 3.41 151803 100% 1.68 1.71 1714 33kV
TOTAL LOAD IN (33KV RING-8) 34.5 14.0 336471.2 8.0 8.2 8203
50 Service area -a 1.15 0.47 1.50 6981 100% 0.32 0.33 326 11kV
27 Commercial / Office -1 2.85 1.15 4.00 46136 100% 1.47 1.50 1496 11kV
55 Mix Use -1 2.75 1.11 2.59 28825 100% 0.72 0.73 730 11kV 33/11kV SUB-STATION-1 AT MRSS
57 Mix Use-3 3.27 1.32 2.59 34275 100% 0.85 0.87 868 11kV
TOTAL LOAD IN (11KV RING-6) 10.0 4.1 116216.9 3.4 3.4 3420
TOTAL LOAD-3 48.92 19.80 639508.15 18.62 19.00 19002

3 Technical college 14.26 5.77 2.50 144276 100% 5.37 5.48 5479 33kV
33/11 kV
9 School with Hostels Facility 8.6 3.48 2.50 87011 100% 3.24 3.30 3304 33kV
SUB-STATION-2
TOTAL LOAD IN (33KV RING-9) 22.9 9.3 231286.1 8.6 8.8 8784
23 Residential -5 13.5 5.46 3.41 186304 100% 2.06 2.10 2104 33kV
22 Residential -6 11 4.45 3.41 151803 100% 1.68 1.71 1714 33kV
14 Institute of Hotel Management 6 2.43 2.50 60705 100% 2.26 2.31 2305 33kV
33/11 kV
10 Law College 5 2.02 2.50 50588 100% 1.88 1.92 1921 33kV SUB-STATION-4
11 Fashion Institute 5 2.02 2.50 50588 100% 1.88 1.92 1921 33kV
21 Residential -3 12.83 5.19 3.41 177057 100% 1.96 2.00 1999 33kV
TOTAL LOAD IN (33KV RING-10) 53.3 21.6 677044.1 11.7 12.0 11965
11/0.433 kV,CSS-3 WITH 250KVA TR for 11kV
Mendatory areas (Green / Roads / open area 61.26 24.79 1.00 247929 100% 0.22 0.23 228
/ circulation)
66 Mix Use-10 2.02 0.82 2.59 21173 100% 0.53 0.54 536 11kV
67 Mix Use-11 2.5 1.01 2.59 26204 100% 0.65 0.66 664 11kV 33/11 kV
64 5.25 2.12 2.59 55029 100% 1.37 1.39 1393 11kV SUB-STATION-3
Mix Use-8
69 Mix Use-13 2.94 1.19 2.59 30816 100% 0.76 0.78 780 11kV
13 Primary School 2 0.81 2.50 20235 100% 0.75 0.77 768 11kV
TOTAL LOAD IN (11KV RING-7) 76.0 30.7 401387.1 4.3 4.4 4370

POWER INFRASTRUCTURE
AREA BASED DEVELOPMENT, RANCHI SMART CITY 2/4
Product Mix Occupancy Power Power Demand in Power Demand in Selected Incoming Power supply Source
factor Demand in MVA @ 0.98 PF kVA Distribution
Plot No. Area (Acre) A(Ha) FSI/FAR BUA (Sq.m.)
MW Voltage Level
(kV)
11/0.433 kV,CSS-4 WITH 250KVA TR for
Mendatory areas (Green / Roads / open area 61.26 24.79 1.00 247929 100% 0.22 0.23 228 11kV
/ circulation)
39 Local Shopping Centre 1.5 0.61 4.00 24282 100% 0.77 0.79 788 11kV
25 Residential -7 7.5 3.04 3.41 103502 100% 1.15 1.17 1169 11kV 33/11 kV
SUB-STATION-4
26 Residential -8 3.58 1.45 3.41 49405 100% 0.52 0.53 526 11kV
47 Community Centre 1.2 0.49 1.50 7285 100% 0.33 0.34 340 11kV
38 Vending area -b 1.4 0.57 4.00 22663 100% 0.72 0.74 735 11kV
TOTAL LOAD IN (11KV RING-8) 76.4 30.9 455066.1 3.7 3.8 3785
TOTAL LOAD-4 119.56 48.39 1472400.58 31.35 31.99 31988

Service area -a / Proposed 220/33kV


2 0.81 1.50 12141 100% 0.56 0.57 566 11kV 220/33kVkV GIS SUB-STATION AT MRSS
MRSS

Service area -a / Proposed 33/11kV SS-1 0.85 0.34 1.50 5160 100% 0.24 0.24 241 11kV 33/11kV SUB-STATION-1 AT MRSS
33/11 kV
Service area -c/ Proposed 33/11kV S/S-2 0.7 0.28 1.50 4249 100% 0.19 0.20 198 11kV
SUB-STATION-2
Public Facility -1/ Proposed 33/11kV S/S- 33/11 kV
0.7 0.28 1.50 4249 100% 0.19 0.20 198 11kV
3 SUB-STATION-3
33/11 kV
Service area -d/ Proposed 33/11kV S/S-4 0.7 0.28 1.50 4249 100% 0.19 0.20 198 11kV
SUB-STATION-4
TOTAL LOAD 656.43 265.66 5683816.03 131.16 133.84 93.69 Overall Diversity Factor@ 0.70
220/33kV Transformer Sizing Calculation for
Total Estimated Load Total Estimated load with Overall Diversity Factor@ 0.70
Estimated Load
Total Estimated Load in MW at 220/33kV S/S 131.16 MW 91.81 MW
Total Estimated Load in MVA at 220/33kV S/S @ 0.98P.F. 133.84 MVA 93.69 MVA
Total Max. power demand (in MVA) at Overall diversity factor of 0.7 considered 116.7 MVA
Transformer Percentage Loading at
at peak hours (11 00-- 18 00 hrs)
Different Cooling Rating

Transformer At 65 MVA with ONAF-2 At 52 MVA with ONAF-1


rating
Evaluation of Different Cases for Transformer operation
required At Average
in MVA At Average loading
loading in a At peak loading in a day At peak loading in a day
in a day
day
Case-1 220/33kV Transformer rating required when all 48% 59.8% 60% 74.8%
3 Transformer are working 39

Case-2 220/33kV Transformer rating required when 2 72% 89.8% 90% -


Transformer are working and 1 in fault 58 For Different cooling ratings the loading on the
condition, Considering (N-1) redundancy transformer is with in the precribed 90% limit
Case-3 Total Estimated load for Phase-1 & Phase-2 45% - 56% -
with Overall Diversity Factor@ 0.70, when 2 57.99 for optimize & efficient operation of
Transformer installed are working Transformers in different cases.
Case-4 Total Estimated load for Phase-1 & Phase-2 89% - - -
with Overall Diversity Factor@ 0.70, when 1 57.99
Transformer are working and 1 in fault
condition
Considering the above cases, 220/33kV Transformer standard Considering the various factors like Diversity Factor at different time zones in a day, Phase wise & gradual development of
rating selected Ranchi Smart City over the years, optimized loading on Transformers & overall diversity factor the Final Selected rating of
65 220/33kV Power Transformer is 3 x 40/52/65 MVA, ONAN/ ONAF1/ ONAF2 (3 WORKING) and 2 transformers will be installed in
first phase & third will be installed in 3rd phase.

POWER INFRASTRUCTURE
AREA BASED DEVELOPMENT, RANCHI SMART CITY 3/4
Product Mix Occupancy Power Power Demand in Power Demand in Selected Incoming Power supply Source
factor Demand in MVA @ 0.98 PF kVA Distribution
Plot No. Area (Acre) A(Ha) FSI/FAR BUA (Sq.m.)
MW Voltage Level
(kV)
33/11kV Transformer Sizing Calculation
Total Estimated Load in MW at 33/11kV substation 33.0 MW
Total Estimated Load in MVA at 33/11kV substation 33.7 MVA
Load in MVA at 33/11kV @ 0.98P.F. & 0.7 Overall Diversity factor 23.6 MVA
Load in MVA at 33/11kV Substations @ 0.98P.F. & 0.70 Overall Diversity factor 23.6 MVA

33kV/11kV
Transform
33kV Ultimate Demand @ Overall Diversity Total Estimated Load
er rating
Factor of 0.70 at 11kV
required
Substation Wise
@ 90%
load distribution
33kV Load including 11kV load Load Rating in
Load (in MW)
(in MW) (in MVA) MVA

S/S-1 23.61 8.15 8.3 10.17


S/S-2 23.63 8.26 8.4 10.30
Diversity Factor is not considered while sizing of 33/11kV Transformer, Since load on 11kV is a small fraction of City load.
S/S-3 22.01 8.73 8.9 10.89
S/S-4 22.57 8.11 8.3 10.11
91.81 33.3 33.9 41.5
Total Load on 11kV @ Overall Diversity Factor of 0.70 23.75 MVA Transformer Percentage Loading at Different Cooling Rating

Transformer rating
required
(Considering SS-3
Evaluation of Different Cases for Transformer operation At 12.5 MVA At 10 MVA
which is having For Different cooling ratings the loading on the transformer is with in the
maximum load at precribed 90% limit for optimize & efficient operation of Transformers in
11kV Level) different cases.
Case-1 33/11kV Transformer rating required when 2 Transformer are 5.44 MVA 35.64% 44.55%
working
Case-2 33/11kV Transformer rating required when 1 Transformer are 10.89 MVA 71.28% 89.10%
working and 1 in fault condition
Considering the above cases & any small future requirement, 33/11kV 12.5 MVA Considering the various factors like Diversity Factor at different time zones in a day, optimized loading on Transformers & overall diversity factor the Final
Transformer standard rating selected Selected rating of 33/11kV Power Transformer is 3 x 10/12.5 MVA, ONAN/ ONAF (2 WORKING).

Selected rating of 33/11kV Power Transformer for 33/11kV SUB-STATION-1 at MRSS, Sub-station-2, SUB-STATION- 3 and SUB-STATION- 4 are 2 x 10/12.5 MVA (2 WORKING)