Design Sheet Format
Design Sheet Format
Office :
Pune
Project :
Design Proposal Report for structural Componets on Aurangabad to Jalgao road
CH.89-800 to 93-940
Owner :
PWD
Contractor :
Pavetech
Client
Title :
RCC Walls and CD Work for Aurangabad to Jalgao CH 89-800 to 93-940
1.0 Objective
The Objective and the scope of this document is to
describe the retaining walls and its length on typical types
needed for Aurangabad - Jalgao road
1. Fixing the thickness of Structural members.
2. Develop input for analysis in SAP/CSI Bridge(Software) and perform analysis in SAP.
3. Check capacity of members.
4. Design and determine the reinforcing steel .
5. Check wide beam shear .
6. Check Bearing pressure.
7. Provide design sketches for drawing development
Details of Recognizance survey
Name of Work - Design Proposal Report for structural Componets on Aurangabad to Jalgao road CH.89-800 to 93-
940
Reinforced Concrete Wall
Type of Additional for
Sr. No. Chainage Height Total length Length Remark
Structure Embedment
Same as road
3 90+570 Old CD WORK 4.5 M 0.5 M 5.0 M
carriage way width
Same as road
4 90+730 New CD WORK 4.7 M 0.5 M 5.2 M
carriage way width
Old CD WORK
Same as road
5 90+920 TO NEW CD 6.0 M 0.5 M 6.5 M
carriage way width
EORK
Same as road
6 91+200 New CD WORK 1.0 M 0.5 M 1.5 M
carriage way width
Same as road
7 91+420 Old CD WORK 1.5 M 0.5 M 2.0 M
carriage way width
Same as road
8 91+620 Old CD WORK 2.8 M 0.5 M 3.3 M
carriage way width
Same as road
9 91+980 Old CD WORK 1.5 M 0.5 M 2.0 M
carriage way width
Same as road
10 92+490 Old CD WORK 2.4 M 0.5 M 2.9 M
carriage way width
StructSource Engineering Solutions Ltd Calculation Note
Design Proposal Report for structural Prepared By SDB
JOB Componets on Aurangabad to Jalgao road Rev R0
CH.89-800 to 93-940 Checked By GSP
RCC Walls and CD Work for Aurangabad to Jalgao CH 89-800
TITLE Date 11/25/2019
to 93-940
Same as road
11 92+580 Old CD WORK 2.4 M 0.5 M 2.9 M
carriage way width
Same as road
12 92+690 Old CD WORK 2.6 M 0.5 M 3.1 M
carriage way width
Same as road
13 92+850 Old CD WORK 4.0 M 0.5 M 4.5 M
carriage way width
Same as road
14 93+010 Old CD WORK 3.0 M 0.5 M 3.5 M
carriage way width
StructSource Engineering Solutions Ltd Calculation Note
Design Proposal Report for structural Prepared By SDB
JOB Componets on Aurangabad to Jalgao road Rev R0
CH.89-800 to 93-940 Checked By GSP
RCC Walls and CD Work for Aurangabad to Jalgao CH 89-800
TITLE Date 11/25/2019
to 93-940
Sr. No. Chainage Type of Structure N E