H M EL
HPCL-Mittal Energy Limited
Guru Gobind Singh Refin ery, Bathin da.
O&M By:
· )
BOI LERS
HEAVY ENGIN EERING LTD
~.
Mr. K. Raju Mr. Amresh Mr. Raj esh Mr. Laxm an Tari
00 20101/20 IFI Mr. Prashant Mitra
Asst.Mgr Kum ar SI Dy. Mgr
17 Eng (ISGEC)
(ISGEC) (ISGEC) PM (ISGEC) (HMEL)
ISSUE
REV STATUS PREPARED REVI EWED CHECKED APPROVED CONCURRED
DATE
This document is confidential. Neither the whole nor any part of this document may be disclosed to any third party without the prior written consent of HPCL-
MITT AL ENERGY LTD. The copyright of this document is vested in HPCL-MITTAL ENERGY LTD. All rights reserved. Neither the whole nor any part of this
document may be reproduced, stored in any retrieval system or transmitted in any form or by any means (electronic, mechanical, reprographic, recording or
otherwise) without the prior written consent of the cop right owner. Format No. 9111·000·PCT ·007·00006 Rev·OO
HPCL-Mittal Energy Limited Revision 01
SOP for Boiler Hydro Test in 2x300 TPH CFBC Boiler Issue Date 12106/2018
Next Review 12106/2019
® UB#5: 9112-S7S-0PR-704-00046 Rev 01
HMEL Page 2 of 16
"
The Owner of this Document is Department OPERATION at BATHINDA. Please Contact AGM / OPERATION
Manager- for any clarifications, Updates or Revisions.
HPCL-Mittal Energy Limited Revision 01
SOP for Boiler Hydro Test in 2)(300 TPH CFBC Boiler Issue Date 12106/2018
Next Review 12106/2019
® UB#5: 9112-575-0PR-704-00046 Rev 01
HMEL Page 3 of 16
INDEX
4
, C'_,_~
4
- 'r
3 References 4
4 Responsibility 4
13 Performance indicators 12
14 Records 12
16 Change Register i 16
HPCL-Mittal Energy Limited Revision 01
SOP for Boiler Hydro Test in 2)(300 TPH CFBC Boiler Issue Date 12106/2018
Next Review 12106/2019
® UB#5: 9112-575-0PR-704-00046 Rev 01
HMEL Page 6 of 16
~ ISGEC manuals
~ J B0940-50990200-P I 0-0006
DEFINITIONS OF LABEL
LABEL DEFINITIONS
DANGER:
DANGERS alert you to an immediate hazard that causes serious injury or death and
requires special Precautions to be taken
CAUTION:
CAUTION alert you to a potential hazards that causes serious damage to equipment!
Pro ert under certain condition
WARNING:
WARNING alert you to a potential hazard that causes serious injury or death under certain
condition
NOTE:
NOT Note emphasize or remind you of an important place of information
SOP for Boiler Hydro Test in 2)(300 TPH CFBC Boiler Issue Date 12106/2018
Next Review 12106/2019
® UB#5: 9112-575-0PR-704-00046 Rev 01
HMEL Page 7 of 16
Hydraulic test in a boiler is carried out to check leakages & welding strength of
pressure parts and prove the strength of the boiler at a pressure greater than the
working pressure and is carried out at following stages:-
.:. On completion of repair of boiler pressure parts .
•:. On completion of annual overhaul.
.:. At the request of statutory authority to fulfill the statutory requirement.
S ACTION BY
DESCRIPTION
No FE- CRE- SIC
Ensure that all the air vents of drum are fully opened (12-GLV-
1 0424 & 12-GLV-423), (12-MOV-0401, 12-MOV-0402, 12-MOV- ~ ~
403, and 12-MOV-404).
Ensure that Main Steam Line stop valve (12-MOV-OS11) is fully
2 closed & bypass motorized valve (12-MOV-OS13, 12-MOV- ~
OS12) is also fully closed.
Ensure that main steam line stop valve main & bypass (Burner
3 floor) (12-MOV-OS14 & 12-MOV-OS1S) is close & make sure ~
manually tight.
SOP for Boiler Hydro Test in 2x300 TPH CFBC Boiler Issue Date 1210612018
Next Review 1210612019
® UB#5: 9112-575-0PR-704-00046 Rev 01
HMEL Page 8 of 16
Ensure that all the air vents in saturated steam line (12-GLV-
OS06) (12-GTV-OS09) (12-GLV-OS01) (12-GTV-OS02) (12-GLV-
6 OS2S/OS26), & Super heater steam line (12-GLV-OS31/0S32), ./
Wing wall «12-GLV-OS19/0S20), COD (12-GLV-OS13/0S14) is
in full open condition.
Super heater drain isolation valve (12-GLV-OS31, 12-GLV-
7
OS32) is fully closed.
./
The Drum level gauge glass must be flushed properly for clear
8
visibility.
./
Ensure that the pH level of Boiler Feed water (OM) 8.8 pH to
9
9.2 pH.
./
Ensure that Soot blowing main isolation valve (12-GTV-1S01) is
10
fully closed.
./
-c--
Ensure that the entire down comer drain isolation valve (12-
11
GLV-0487) (12-GTV-MOV-0413) is fully closed.
./ ./
Ensure that Rear wall bottom header (12-GLV-0489) (12-GTV-
12
MOV-0414) is fully closed.
./ ./
Ensure that Compact separator return ring wall header drain
13 isolation valve (12-GLV-0496), (12-GLV-0497) (12-GTV-MOV- ./ ./
0416) is fully closed.
Ensure that Compact separator 01 top & rear wall header (12-
14
GLV-0494) (12-GTV-MOV-041S) is fully closed.
./ ./
Ensure that Compact separator 02 return ring wall header (12-
15
GLV-041 04/041 OS) (13-GTV-MOV-0417) is fully closed.
./ ./
Ensure that Compact separator 02 top rear wall (12-GLV-
16
04107) (12-GTV-MOV-0418) is fully closed.
./ ./
Ensure that Down comer drain (12-GLV-04113) (12-GTV-
17
MOV-0419) is fully closed.
./ ./
Ensure that Wing wall bottom header drain (12-GLV-0411S)
18
(12-GTV-MOV-0420) is fully closed.
./ ./
Ensure that all the drains of Main stem line are close (12-GLV-
19 OS69, 12-MOV-OS21, 12-GLV-S68, 12-MOV-OS22, 12-GLV-S70, ./ ./
and 12-MOV-OS20).
SOP for Boiler Hydro Test in 2)(300 TPH CFBC Boiler Issue Date 12106/2018
Next Review 12106/2019
® UB#5: 9112-575-0PR-704-00046 Rev 01
HMEL Page 9 of 16
Start-up Procedure:
S ACTION BY
DESCRIPTION
No FE- CRE- SIC
1 Ensure that all the above checks are healthy.
Take a clearance from HMEL Shift In charge for fill the boiler
2
with feed water from their existing side.
SOP for Boiler Hydro Test in 2)(300 TPH CFBC Boiler Issue Date 12106/2018
Next Review 12106/2019
® UB#5: 9112-575-0PR-704-00046 Rev 01
HMEL Page 11 of 16
SOP for Boiler Hydro Test in 2)(300 TPH CFBC Boiler Issue Date 12/06/2018
Next Review 1210612019
UB#5: 9112-515-0PR-104-00046 Rev 01
HMEL Page 12 of 16
14. Records:
Observe Water level check, pressure rising rate, pressure dropping rate. Log
Book & Checklist of Field & DCS.
DCS Checklist
SOP for Boiler Hydro Test in 2)(300 TPH CFBC Boiler Issue Date 12106/2018
Next Review 12106/2019
® UB#5: 9112-S7S-0PR-704-0004S Rev 01
HMEL Page 13 of 16
SOP for Boiler Hydro Test in 2)(300 TPH CFBC Boiler Issue Date 12106/2018
Next Review 12106/2019
® UB#5: 9112-575-0PR-704-00046 Rev 01
HMEL Page 14 of 16
Responsibilit
S.no Description Status Feedback
y
Air vents of drum 12-GLV-0424 & 12-GLV-
1 423, 12-MOV-0401, 12-MOV-0402, 12- FE OPEN
MOV-403, 12-MOV-404.
2 FE OPEN
Main Steam Line stop valve 12-MOV-0511.
Bypass motorized valve 12-MOV-0513, 12-
3 FE CLOSE
MOV-0512
Wing wall air vent 12-GLV-0526, 12-GLV-
4 FE OPEN
0525
Startup vent valve 12-MOV-0509 &
control valve 12-PV-0501
5 FE OPEN
0497) (12-GTV-MOV-0416)
Compact separator 01 top & rear wall
16 header (12-GLV-0494) (12-GTV-MOV- FE CLOSED
0415)
Compact separator 02 return ring wall
17 header (12-GLV-04104/04105) (12-GTV- FE CLOSED
MOV-0417).
Compact separator 02 top rear wall (12-
18 FE CLOSED
GLV-04107) (12-GTV-MOV-0418)
Final super heater drain valve 12-GLV-571,
19 12-MOV-0519, 12-GLV-0572, and 12- FE CLOSED
MOV-0518
r---
WING wall drains 12-GLV-0524, 12-MOV-
20 FE CLOSED
0516.
21 Primary super heater drain 12-GLV-0521 FE CLOSED
Primary inlet super heater drains 12-MOV-
22 FE CLOSED
0508.
COD bottom drain 12-MOV-0505, 12-
23 MOV-0504, CCFWB header drain 12-MOV- FE CLOSED
0503
24 COD side wall drain 12-MOV-0502 FE CLOSED
25 COD side wall drain 12-MOV-0501 FE CLOSED
Primary Super Heater vent 12-GLV-0519,
26 FE OPEN
12-GTV-0520
Blow down: [(12-GTV-0483) (12-GTV-
0411}L [(12-BAV-0409) (12-GLV-0471}L
[(12-GTV-0479) (12-GTV-0480}L[(12-GTV-
0481) (12-GTV-0482}L [(12-MOV-0407)
(12-MOV-0410)L [(12-GTV-0476) (12-GTV-
27 FE CLOSED
0477}L [(12-GTV-0478) (12-GTV-MOV-
0405}L [(12-GTV-MOV-0406) (12-GTV-
MOV-0405)L [(12-GTV- 0405) (12-GTV-
MOV-0412}L [(12-GLV-3129) (12-GTV-
MOV-0412)]
Drum RHS, LHS safety valves (12-SV-
GAGS TO BE
28 0402/401L & Main steam line safety valve FE
PROVIDED
(12-SV-501).
All the instrument is Isolated except the
29 test pressure gauges (12-PG-0505/0504) FE ENSURE
(13-PG-0402/0403).
HPCL-Mittal Energy Limited Revision 01
SOP for Boiler Hydro Test in 2)(300 TPH CFBC Boiler Issue Date 1210612018
Next Review 1210612019
UB#5: 9112-575-0PR-704-00046 Rev 01
HMEL Page 16 of 16
Sr. No
1
Page No
10
Clause No.
Point no 7 & 9
Previous Clause
When pressure is reached up to
Revised Clause
When pressure is reached up to hydro
I
hydro test pressure (1.25 X Drum test pressure (1.25 X MAWP)
working pressure) immediately immediately stop the pump and Close
stop the pump and Close the the discharge valve.
discharge valve.