PetroChina International Jabung Ltd. Maint.

 Standar Procedure
Risk Assesment and Management Operations
Job Description: Butane pipeline Revision:
Area/Unit: NGF plant
Equipment Tag: Page 1 of 1
References:
SCBA Gas mask Safety glasses Ear Plug
PPE Required to do this job:
Safety shoes Hand gloves Hard Hats

IF YOU DO NOT MEET ALL OF THE REQUIREMENTS AS STATED IN THIS PROCEDURE THEN DO NOT PROCEED WITH PERFORMING THE JOB

JOB STEP Equipment / Tools Involved Potential Hazard / Loss Control Statement

ASSEMBLY  THE PUMP

Preparation  assembly the pump
Enclose permit to work and coordinate with operation and safety 
1 Work permit form Miscommunication check safety equipment and work areas
dept.
Prepare tools, material, PPE , equipment support and pre ‐job safety  Entry area class I division I , Struck by 
2 Hand tools, Vehicles and Spare part Makesure vehicles in  good condition
briefing conducted other equipment
Entry area class I division I , Struck by 
3 Set mobil crane on position Mobil crane Makesure vehicles in safe condition, install spark arrestor and gas test
other equipment
Entry area class I division I , Struck by 
4 set ligh truck on position Mobil crane Makesure vehicles in safe condition, install spark arrestor and gas test
other equipment
5 Lift driver pump nozzle head from ligh truck  mobil crane The pump falling down makesure the tension of the belt in good object
Liffting sling should be passed throug the windows of the nozzle 
6 head(082)or lifting lugs and the entire pump assembly lifted out of  special tools,mobil crane The pump falling down makesure the tension of the belt in good object
the light truck

Install all the nuts and lock washers from around the nozzle head 
7 Hand tools,  Bolt and nut worn out Inspect bolt and nut before installing
flange to barrel flange.

8 Lift electric motor and install at the Pump Mobil crane,hand tools motor falling down makesure the belt lifter is in good condition before lifting the motor

9 conect any wiring as necessary  hand tools Electric short  Check induction of electrik curent

Install mechanical seal
10 Hand tools Mechanical seal  falling down work with carefully
Note : Makesure the shaft is clean and free of burrs so seal sleeve will 
slide freely over shaft becarefull lifting the mechanical seal.

adjustmen impeller

Prior to adjusment,ensure the setting collar on the mechanical seal is 
loose and unattached to pump shaft.The pump half coupling 
(530)and adjusting plate (532)must be in place on the pump 
shaft.(see suctional drawing).Be sure that the pump half coupling key 
11 (676)is installed.the spacer (538)must be bolted to the drive half 
coupling (529).The adjusting plate (532)and the pump half coupling  Hand tools Bolt and nut worn out,hand tools slip Ispect bolt and nut before installing,use proper tool
(530)must not be bolted to the spacer (538).this allows pump 
impellers(176)to rest on the case seat.
Note :if unable to turn adjusting Plate (532)by hand,then remove and 
check treads for demage.
While holding pump coupling (530)rotate adjusment (532)until gap 
between faces of adjusting plate (532)  and spacer (538) equal the 
12 impeller lift shown on the pump name plate (the name plate is  Hand tools Bolt and nut worn out,hand tools slip work with carefully
mounted on the nozle head ).use filler geuge,hex key or other 
suitable item of proper thickness.
Turn adjusting plate (532)so bolt holes will line up with nearest bolt 
13 holes in the pump half coupling(530). Can couse injury work with carefully

Rotate driver shaft so bolt hold in spacer (538)line up with adjusting 
14 Hand tools Can couse injury work with carefully
plate (532)and pump half Coupling(530).
Insert Two(20 of the coupling bolt 180 Degrees apart and tighten 
15 progressively until secure;thereby,closing the gap between the  hand tools Bolt and nut worn out,hand tools slip Inspect bolt and nut before installing,use proper tool
spacer (538)and the adjusting plate(532). 

insert the other two(2)coupling bolt and tighten all four (4)bolt 
securaly.see attached shaft T.I.R drawing.Indicated the pump shaft 1 
inch  above the mechanical seal (taking care not to force the shaft 
radialy ).for vertical motors the folowing aplies.For two pole runing 
speed(3000/3600RPM)The T.I.R limit is 0.002 inch (0.05mm).For 4 
pole running speed (1500/1800RPM)and slower the T.I.R limit is 
0.004inch(0.10mm).
Note: There are literally dozens of make‐up  combination for coupling  
with either then 8‐ hole adjusting plate or the 4‐hole adjusting 
plate.if the roundout exceed  these limit ,then remove  thefour  Hand tools Bolt and nut worn out,hand tools slip Inspect bolt and nut before installing,use proper tool and work carefully
coupling bolt (deskribed in item 15 and 16)and rotate the spacer 
16 (538)180 degres.reinsert and tighten the bolt for steps 15and 16 and 
recheck the roout above thhe mechanical seal.if the run out stell 
exceeds the limit,the remove the boltand rotate spacer or one of of 
p g
the coupling hubs. p
Important i p g p
mpeller setting shown on name plate 
is for duty condition .for any other condition ,check drive for sign  of 
over load.this done by checking by amperage drawn against full load  
amperage by on motor name plate. if the motor being  overloaded 
,the impeller might be rubbing on the case.using prosedur  previously 
outlined rise impellers until unit is operating properly
Mechanical seal should be adjusted per specific seal 
instructions.attach coupling guard to coper windows in the nozzle 
head.

Conect the suction and discharge piping so that no strain is 
17 Hand tools Bolt and nut worn out,hand tools slip Inspeck bolt and nut before installing,use properly tools
transmited to the pump.
Check the pump for free shaft rotation.when all is in order the pump 
barrel is filled with liguid by opening the suction valve.Spaces not 
vented by removing pipe plugs from the vent taps or by opening 
valves and vent to an appropriate location.Start the pump with 
18 Hand tools/Valve opener Bolt and nut worn out,hand tools slip Inspeck bolt and nut before installing,use properly tools
discharge valve partially open.Donot operate the pump under closed 
discharge without by‐passing some of liquid to the suction vessel.

Test running the pump ,check running condition and vibration
19 special tools(vibration test ) Rotating equipment can cause accidents makesure  all safety guard eguipment has installed before running the pump

20 Close permit Work permit form Miscommunication Coordinate with NGF operationc,heck safety equipment and work areas

Man Power :  1) Mechanic Tech.   : 
2) Electric Tech.      : 
Prepared By : Review By : Approved By : Approved By :

Ujang dadang M.yasin / Sokib Rudi hermawan / Ahmad fakar Widodo


 Mechanic Technition Mechanic Supervisor Maint. Superintendent/Lead Supv. HSE Superintendent/Supv.