Professional Documents
Culture Documents
Outline
Outline
Outline
2906 2906
1700
1700
a
CR1 L 50x5 3M16 H2 a a
L 45x4
R1 BR1 a a 2M16 R4
PB3
L45x4
22001300
1M16
a
A PB2
A
CR2 R2 R1 R3
L 50x4 50x5
L
a
H1
1M16 a R6
1M16
a
SECTION 1-1
LEG
R5
L45x4
1M16
L 45x4
R3 PB3 a
H1 L 45x4 a a
HL70x5
6M20
L50x5
2M16
1500
R5 H2 R4 a
PB2
CR1 2M16 L
1M16
R1 a 70x5 4M16
SECTION 2-2
L50x5
2M16
R2 a
2 CR2 HL 70x5 4M20
4246
L 45x4
2084
3000
L50x4
2M16
1M16 a a
L50x5
1M16
1300 R1 L 45x4
B B
PB2
1800 a
R2 a
L 45x4 a
1500 1M16
L70x5 L60x5
2M20 2M16
2M16
a
L
70x5 4M16
1M16 SECTION 3-3
60x5
L
a
3
PB3
6M20 PB1
90x8
3000
HL 70x5 4M20
2084
4246
L 1300
HL
2M20 2M16
2M16
L70x5 L60x5
L60x5
L 45x4 a
a
45x4
1M16
1800
L 45x4
a
SECTION 8-8
SECTION 4-4
1500
28800
2M16 L 1M16
L50x5
2M16
a 70x5 4M16
L 45x4
a
C HL 70x5 4M20 C
4 R2
R1 4246
L
PB6
PB5
a a
L60x5 L60x5
2M16 3M16
3800
2084
R3 PB4
PB2
a
1300
6M20
HL 100x10
1700
R4
a a
f
L
45x4
1800 L 45x4
2M16 R11 1M16
SECTION 5-5 a a
1M16 a
PB3
R12 a 70x5 4M16
a
R13
R14 PB1
HL 70x5 4M20
4892
R1
R2
5
SECTION 9-9
2084
D D
1700 2800
L60x5 L75x5
3M16 3M20
L75x5
3M20
c
a a
L 40x4 a
1300
1800
L 60x5
L 50x5
3187
1M16
2M16 L70x5 SECTION 6-6
L70x5 L50x5
2M20 2M16
1M16
a 4M16
a
a
HL 125x10
2800
3M20
HL70x5
10M20
HL 70x5 4M20
4892
d a
a f
6 a
b
L 70x5 a a
2084
L 70x5
HL 70x5
2000
3M20
1300
2M20
1800
1M16 L 70x5
a 4M16
3600
1800 SECTION 10-10
3100
a
HL 70x5 4M20
3600
4892 SECTION 7-7 b
LONGITUDINAL FACE
R1
3100
65800
R2
b
7
b
2084
L 40x4
g
F 1300
1800
b
F
2M20
L70x5
1M16
3200 3200
SECTION 11-11
L 45x4
1M16
b
G b G
L75x5
3200
2M20
L 45x4
L 45x4 1M16 g
b
1M16
2M16
10M20
L 60x5
8 b a R3 R1 b
SECTION 12-12
HL 140x12
3200
37000
b R2 HP1
b
H 2M16
L 60x6
HP2
H
9 f b
g
g
b
3000
f b
2M16
BASIS +0 g
b
L70x5
3000
2M20
L 60x6
10 f b
g
f 2M16 b
g
PT. PLN (PERSERO)
BASIS +3
I 11 L70x5
UNIT INDUK PEMBANGUNAN II I
ff g Jln. Dr. Cipto No. 21, MEDAN - 20152
f
SECTION 13-13
30003000
Pekerjaan :
2M16 e
g
L70x5 BASIS +6
12 f f
g e
Kontrak No. :
f
e
2M16 051.PJ PLN2014/131/UIP II/2014, Tanggal 29 Desember 2014
g e g
3000
L70x5 BASIS +9
13 General Notes : Kontraktor :
J g g
- All Dimension Show in Milimeters J
e
g - High Steel (HL) accordance with JIS G3101 Grade ST-52 fy=355 MPa GEDUNG THT Lantai 1
g a L 45x4 1M16 - Mild Steel (L) accordance with JIS G3101 Grade ST-37 fy=235 MPa Jl. Budhi Raya No. 41 Kemanggisan - JAKARTA 11480
L75x6
2M16
2M20
BASIS +12 b L 50x4 1M16 - Bolt and Nut accordance with JIS B1180, JIS G4051
L70x5
14 c L 50x5 1M16
Grade 8.8 with Zinc Coated and Bare Pabrikan : Nama Gambar :
g g - Hot Dip Galvanized accordance with ASTM A123
d L 56x5 1M16 SECTION 14-14 Jl. Budhi Raya No. 41 Kemanggisan
3000
f L 60x6 1M16
- Indicate mark is Plate (Steel Tower Division) OUTLINE
h
BASIS +15 g L 70x5 1M16 - Indicate mark is Profile
K h L 75x5 1M16
Length Bolt Lock Nut + 5mm from the existing bolt length
Referensi :
PEMBANGUNAN TRANSMISI 150 KV K
PLTU AIR ANYIR - PANGKAL PINANG (PAKET 1)