RAB

NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)


I PEEKRJAAN PERSIAPAN 17,000,000.00
1 Membersihkan lapangan dan perataan 5,000,000.00
2 Pengukuran dan pemasangan bouwplank 10,000,000.00
3 Biaya air dan listrik kerja 2,000,000.00
II PEKERJAAN TANAH 18,000,000.00
1 Galian tanah per 1m 10,000,000.00
2 Urugan tanah kembali (1/3 galian) 5,000,000.00
3 Urugan Pasir Bawah Pondasi 3,000,000.00
III PEKERJAAN PASANGAN PONDASI 47,000,000.00
1 Pasang pondasi foot plat (1x1)m 18,000,000.00
2 Pasang pondasi batu kali 1:3 20,000,000.00
3 Pasang pondasi pagar 1:3 9,000,000.00
IV PEKERJAAN BETON 207,700,000.00
1 Lantai Kerja Pondasi Footplate 1,300,000.00
2 Membuat Beton Sloof Beton Bertulang 20/15 12,000,000.00
3 Membuat Kolom Beton bertulang 30/30 65,000,000.00
4 Membuat Kolom Beton bertulang 15/15 20,000,000.00
5 Membuat plat lantai 70,000,000.00
7 Balok Induk (30/30) 16,500,000.00
8 Balok Anak (15/15) 3,700,000.00
9 Ring Balok (15/15) 11,000,000.00
10 Membuat beton bordes dan anak tangga 8,200,000.00
V PEKERJAAN DINDING 111,000,000.00
1 Pasang Bata merah 1:3 40,000,000.00
2 Plesteran 1:3, tebal 15mm 48,000,000.00
3 Acian 23,000,000.00
VI PEKERJAAN ATAP 19,300,000.00
1 Rangka Atap Baja ringan 15,000,000.00
2 Atap genteng metal 3,600,000.00
3 Nok genteng metal 400,000.00
4 Listplank 300,000.00
VII PEKERJAAN PINTU DAN JENDELA 60,250,000.00
1 Pasang kusen pintu dan jendela kayu jat 15,000,000.00
2 Pasang daun pintu dan jendela 25,000,000.00
3 Pasang kaca jendela 5,000,000.00
4 Pasang kunci silinder 850,000.00
5 Pasang Engsel Pintu 1,000,000.00
6 Pasang Engsel jendela 900,000.00
7 Pasang grendel jendela 12,500,000.00
VIII PEKERJAAN LANTAI DAN DINDING KERAMIK 81,000,000.00
1 Pasang lantai keramik 40x40 cm 60,000,000.00
3 Pasang dinding keramik 20x20 cm 15,000,000.00
4 Pasang lantai keramik 20x20 cm 6,000,000.00
IX PEKERJAAN INSTALASI LISTRIK 8,400,000.00
1 Instalasi stop kontak 900,000.00
2 Instalasi ttk lampu 5,000,000.00
3 Instalasi saklar 2,500,000.00
X PEKERJAAN INSTALASI AIR BERSIH DAN AIR KOTOR 11,800,000.00
1 Memasang kloset duduk 5,300,000.00
2 Memasang bak mandi 1,800,000.00
3 Memasang kran air diameter 3/4” 600,000.00
4 Membuat septctank dan peresapan 500,000.00
5 Pasang 1 bh bak cuci stainless steel 1,000,000.00
6 Memasang 1 m' Pipa PVC tpe AW diameter3” 200,000.00
7 Memasang 1 m' Pipa PVC tpe AW diameter 4” 600,000.00
8 Membuat Saluran Air Bersih 1,800,000.00
XI PEKERJAAN PLAFOND 27,000,000.00
1 Pasang rangka plafond 10,000,000.00
2 Pasang plafond 14,000,000.00
3 List tepi plafond 3,000,000.00
XII PEKERJAAN PENGECATAN 45,000,000.00
1 Pengecatan dinding 35,000,000.00
2 Pengecatan kusen, daun pintu dan daun jendela 2,000,000.00
3 Pengecatan plafond 8,000,000.00
JUMLAH 653,450,000.00
REKAPITULASI

NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)


I PEEKRJAAN PERSIAPAN 17,000,000.00
II PEKERJAAN TANAH 18,000,000.00
III PEKERJAAN PASANGAN PONDASI 47,000,000.00
IV PEKERJAAN BETON 207,700,000.00
V PEKERJAAN DINDING 111,000,000.00
VI PEKERJAAN ATAP 19,300,000.00
VII PEKERJAAN PINTU DAN JENDELA 60,250,000.00
VIII PEKERJAAN LANTAI DAN DINDING KERAMIK 81,000,000.00
IX PEKERJAAN INSTALASI LISTRIK 8,400,000.00
X PEKERJAAN INSTALASI AIR BERSIH DAN AIR KOTOR 11,800,000.00
XI PEKERJAAN PLAFOND 27,000,000.00
XII PEKERJAAN PENGECATAN 45,000,000.00
TOTAL 653,450,000.00
B

NO URAIAN PEKERJAAN JUMLAH HARGA (Rp) BOBOT (%)


1
I PEEKRJAAN PERSIAPAN 17,000,000.00 2.602
II PEKERJAAN TANAH 18,000,000.00 2.755
III PEKERJAAN PASANGAN PONDASI 47,000,000.00 7.193
IV PEKERJAAN BETON 207,700,000.00 31.785
V PEKERJAAN DINDING 111,000,000.00 16.987
VI PEKERJAAN ATAP 19,300,000.00 2.954
VIII PEKERJAAN PINTU DAN JENDELA 60,250,000.00 9.220
VIII PEKERJAAN LANTAI DAN DINDING KERAMIK 81,000,000.00 12.396
IX PEKERJAAN INSTALASI LISTRIK 8,400,000.00 1.285
XI PEKERJAAN INSTALASI AIR BERSIH DAN AIR KOTOR 11,800,000.00 1.806
X PEKERJAAN PLAFOND 27,000,000.00 4.132
XII PEKERJAAN PENGECATAN 45,000,000.00 6.887
TOTAL 653,450,000.00 100.000
BAR CHART

WAKTU PEKERJAAN (120 HARI KALENDER)


MINGGU KE :
2 3 4 5 6 7 8 9 10 11
12 13 14 15 16
KURVA S

WAKTU PEKERJAAN (120 HARI KALENDER)


NO URAIAN PEKERJAAN JUMLAH HARGA (Rp) BOBOT (%) MINGGU KE :
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
I PEEKRJAAN PERSIAPAN 17,000,000.00 2.602 0.780 0.121 0.121 0.121 0.121 0.121 0.121 0.121 0.121 0.121 0.121 0.121 0.121 0.121 0.121 0.121
II PEKERJAAN TANAH 18,000,000.00 2.755 1.377 0.826 0.275 0.275
III PEKERJAAN PASANGAN PONDASI 47,000,000.00 7.193 2.877 4.316
IV PEKERJAAN BETON 207,700,000.00 31.785 3.179 7.946 7.946 9.536 3.179
V PEKERJAAN DINDING 111,000,000.00 16.987 6.795 6.795 3.397
VI PEKERJAAN ATAP 19,300,000.00 2.954 1.477 1.477
VII PEKERJAAN PINTU DAN JENDELA 60,250,000.00 9.220 2.766 3.688 2.766
VIII PEKERJAAN LANTAI DAN DINDING KERAMIK 81,000,000.00 12.396 3.719 4.339 4.339
IX PEKERJAAN INSTALASI LISTRIK 8,400,000.00 1.285 1.285
X PEKERJAAN INSTALASI AIR BERSIH DAN AIR KOTOR 11,800,000.00 1.806 1.264 0.542
XI PEKERJAAN PLAFOND 27,000,000.00 4.132 2.892 1.240
XII PEKERJAAN PENGECATAN 45,000,000.00 6.887 3.443 2.066 1.377
TOTAL 653,450,000.00 100.000
JUMLAH - 0.780 1.499 3.825 7.891 8.343 8.068 9.657 10.095 8.393 7.762 7.528 7.226 7.009 6.999 3.427 1.499
KUMULATIF - 0.780 2.279 6.104 13.995 22.338 30.406 40.063 50.157 58.550 66.312 73.840 81.066 88.076 95.074 98.501 100.000
IX 91
10
91
IV 28
4 VII 84
28 8
84

I III IV 56 V 70 VIII 91 X XI 105 XII 112


0 7 28 98
0 1 3 5 6 9 11 11 11
0 7 28 56 70 91 98 105 112

II
VI 70 XII
21 7
2
21 70

I
21
2
21

0 7 21 21
0 1 2 2
0 7 21 21