CDP Format 2019
CDP Format 2019
A. General Information
Project Title: (What you will call your project, example: “Building the Future: One brick at
a time” or “Eat Right, Live Right”)
Community Background:
Briefly describe the situation in the community. You may conduct an ocular
inspection, interview key persons in the community, consult your college
community coordinator and review the community profile. Take note of the
following:
Schools Transportation
Churches Livelihood
Government offices Infrastructure
Hospitals NGOs
Health and sanitation Significant structures
Peace and order Way of life
Disaster risk areas Environment
Private companies Other organizations that help the community
Outline the problems and needs of the target beneficiaries and briefly describe
how the project intends to address these.
Your community profile and background should give me the idea why such
project is needed for the beneficiary and why you thought of that project as a
solution
B. Objectives:
General Objective:
State the over-all direction/ long–term objective in the / of the community. (Use
the Bloom’s Taxonomy of Objectives as your guide in making objectives). You may also use
the community’s current objective/goal connected to your project.
Specific Objective:
Specific Objectives are the short term, more immediate and are component details of
the general or long-term objective. Specific objectives must show output and specific
performance indicators. Make sure that you touch the Psychomotor, Affective and
Cognitive part
(How was the Length of time Result of Things that you will utilize Expenses
project for the the during this stage. during this
conceptualized preparation planning Resources/Tools/Methods/ phase
stage Materials used during
and planned?
(tangible/ planning
Steps that you intangible)
take/will do as a
preparation for the
project. Explain
briefly.)
Actual Activities:
(How it will be How long will What Things that you will utilize Projected
implemented? the output or during this stage. cost/expenses
What are the roles implementation result is during this
of each group or run expected phase
member in the each
implementation of stage?
the project?
Briefly cite the
flow of the activity.
Post-
implementation
Activities:
How long will What will Things that you will utilize Projected
(How it will be the evaluation be the during this stage. cost/expenses
assessed/ take expected during this
evaluated? Review result? phase
your stated project
objectives,
expected outputs,
phasing and
direction. How will
your group
analyze if the
program/project is
effective or not?
A. General Information
Project Title:_____________________
Community Background:
_________________________________________________________
_________________________________________________________
_________________________________________________________
B. Objectives:
General Objective:
_______________________________________________________________________
Specific Objective:
_____________________
_____________________
_____________________
C. The Community Development Plan Matrix
Activities Time Frame Output Resources/Materi Cost
als
Preparation:
Actual Activities:
Post-implementation
Activities:
D. PHOTOS AND DOCUMENTATION