Alireza Ghorbani Profile

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Alireza Ghorbani

Head of Piping Department at Oil Design and Construction Company

Summary
• 19 years of experience in Oil, Gas and Power Plant projects
• Very good knowledge in piping codes and standards.
• Proficient in Lead of a piping team in both FEED & Detail Design performing engineering & checking
functions and providing technical and administrative leadership to the respective discipline personnel;
• Fluent in maximizing team efficiency and ensuring technical accuracy by clear direction and control of the
piping design team and all input data and ensuring work to be carried out in accordance with relevant codes,
standards and procedures.
• Proficient in issuing and checking of piping Feed and Basic Design and Detail Design documents.
• Adequate knowledge about Equipments, Instrument Devices requirements, Process description, PFD/ P&ID,
Safety Requirements in Offshore and Onshore Plants;.
• Fluent in developing and enhancing processes and systems for wide use in the discipline.
• Very good experiences in using of piping 3D design software: PDMS, AUTOPLANT, CADWORX PIPE and
also 2d drawings extraction software: PLANTWAVE;
Very good experiences in software: CAESAR II, AUTOPIPE;

Experience
Head of Piping Department
July 2013 - Present
Projects Involed:
1- Abadan oil refinery upgrading and capacity Consolidation project (CDU/VDU, LPG, GHT, KHT, NHT,
CCR, ISOM, HCU, SRU, HPU, UTILITY, INTERCONNECTING units). (EPC)
2- Tabriz oil refinery GHT unit. (gas oil hydro treating) unit. (EPC)
3- Bandar Abbas-Sirjan/Rafsanjan oil rpoducts pipeline (about 500km 26") and relevant 3 pump stations and
2 terminals. (EPC)
4- Azadegan North Well Head. (including 32 well heads and 64 flow lines). (EPC)
5- Abadan-Mahshahr pump stations and metering system. (EPC)
6- Relocation of flare stacks and burn pit system of Phase 1 south pars gas field.

Piping Department Manager


February 2009 - February 2013 (4 years 1 month)
Managing Piping Engineering Teams in Following Projects:
1- Bandar Abbas Gas Condensate Refinery
2- Reshadat Offshore Oil Platform Renovation and Development Project

Page 1
3- Tishreen Heat Recovery Steam Generation Power Plant
4- Jandar Heat Recovery Steam Generation Power Plant

Lead Piping Engineer


January 2008 - February 2009 (1 year 2 months)
Lead Engineer for Proposal Preparation of following Projects:
1- Razi Petrochemical 3rd Urea Plant
2- 3 HDPE Plants (Dehdasht, Mamasani and Boroujen)
3- Veniran Methanol Plant

Piping Engineering Coordinator


May 2004 - February 2008 (3 years 10 months)
Piping Engineering Coordinator in Following Projects:
1- Kharg Gas Gathering and NGL Recovery (Whole process, utility, tankage and offsite units). (EPC)
2- AMAK Project (Ahvaz, Maroun, Abteymour and Koupal Gas Gathering and Treatment).((Whole process,
utility, tankage and offsite units).(EPC)
3- Songon Cupper Recovery Plant (EPC)
4- Module F of Foolad Mobarakeh Direct Reduction Plant (EPC)

Piping Engineer
July 1997 - May 2004 (6 years 11 months)
Piping Design, 3d Modeling, Stress analysis, Supporting and Procurement Engineering of Following Oil, Gas
and Petrochemical Projects:
1) “Lavan” Oil Refinery. steam generation unit. (EPC)
2) “Arak” Petrochemical Complex. steam generation unit. (EPC)
3) “Fajr” Gas Refinery. steam and power generation unit. (EPC)
4) “Shiraz” Petrochemical Complex. steam generation unit. (EPC)
5) “Esfahan” Oil Refinery. steam generation unit. (EPC)

Education
Iran University of Science and Technology
Bachelor of Science (BS), Mechanical Engineering, 1990 - 1995

Page 2
Alireza Ghorbani
Head of Piping Department at Oil Design and Construction Company

Contact Alireza on LinkedIn

Page 3

You might also like