1. ALL PLUMBING WORKS SHALL BE IN ACCORDANCE WITH ALL THE GOVERNING CODES
10mmØ BAR AND REGULATIONS OF THE PHILIPPINE PLUMBING CODE. APPLICABLE RULES AND
12mmØ LIFT BAR 12mmØ LIFT BAR 12mmØ LIFT BAR REGULATIONS OF THE MUNICIPALITY WHICH ARE HEREBY MADE PART OF THESE
PLANS.
C.I. CO C.I. CO C.I. CO
FIN. GRD. LINE
2. THE SPECIFICATIONS AND DRAWINGS ARE MUTUALLY COMPLIMENTARY. IN ALL CASE
OF CONFLICT, THE SPECIFICATION SHALL PREVAIL OVER THE DRAWINGS.
VARIES
3. THE DRAWINGS SHOW THE GENERAL ARRANGEMENT OF ALL THE PIPINGS, HOWEVER,
WHERE LOCAL OR ACTUAL CONDITIONS AT THE JOB SITE NECESSITATE A DEVIATION
0.20 m AIRSPACE MINIMUM OR REARRANGEMENT, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE NEW
INLET
ARRANGEMENT FOR THE ENGINEER/ARCHITECT'S APPROVAL.
OUTLET
4. THE PLUMBING SYSTEM SHALL BE LAID OUT AND INSTALLED CONSISTENTLY
THROUGHOUT WITH THE GIVEN SLOPES IN THE PLANS AND SHALL CONFORM TO THE
ACTUAL LOCATION, DEPTH AND INVERT ELEVATION OF EXISITING PIPES WHERE THE
4"Ø PVC PIPE TAPPING POINT OF EACH SYSTEM.
6" THK. CHB
5. ALL ABOVE STORM DRAIN AND UNDERGROUND PASSING UNDER SLAB SHALL BE
POLYVINYL CHLORIDE (PVC)
10mmØ VERT. BARS
@ EVERY JOINT 6. ALL SANITARY SEWER LINES SHALL BE POLYVINYL CHLORIDE (PVC) PIPES AND
FITTINGS AND ABOVE AND 2% SLOPE FOR 75mmØ AND BELOW.
2150
1700
DIGESTIVE CHAMBER LEACHING ABSORPTION 7. ALL VENT PIPING SHALL BE POLYVINYL CHLORIDE (PVC) SCH. 40 AS APPROVED BY THE
ENGINEER. ALL PLUMBING FIXTURE SHALL BE INDIVIDUALLY VENTD UNLESS
5% SLOPE 5% SLOPE 5% SLOPE 5% SLOPE 5% SLOPE 5% SLOPE 10. CLEAN OUT ARE REQUIRED UNDER THE FOLLOWING CONDITIONS:
A. EVERY CHANGE IN HORIZONTAL DIRECTION
200
B. EVERY 15 METERS IN HORIZONTAL LINE OF PIPE
11. VERIFY AND DETERMINE, SUBJECT TO THE ENGINEER'S APPROVAL, THE BEST
10mmØ TIES LOCATION CONVENIENT ACCEPTALE APPROVED WATER DISCHARGE RECEIVER IN ALL
@ 0.30 m O.C. 400 400 400 400
CASES, PROVIDE STORM DRAINAGE LINES WITH 2% MINIMUM SLOPE TOWARDS
DIRECTIONS OF DRAIN.
0.10m THK. SLAB
(PROVIDE WATER PROOF)
10mmØ BARS
SECTION 12. VERIFY AND DETERMINE, SUBJECT TO THE ENGINEER'S APPROVAL, THE BEST
SOURCE OF WATER. THE CONTRACTOR SAHLL BE RESPONSIBLE FOR TAPPING THE
@ 0.30 m O.C. 150 1500 150 900 900 WATER SYSTEM TOTHE SOURCE EITHER FROM:
A. THE MAIN LOCAL WATER SOURCE
10mmØ TEMP. BARS 10mm Ø BARS 2. ANY ADDITIONAL SOURCE PROVIDED BY THE OWNER
@ 0.20 m O.C. SPACED @ 0.40m
SPECIFICATIONS:
150
1. ALL HORIZONTAL PIPING SHALL BE RUN IN PRACTICAL ALIGNMENT AND AT
UNIFORM GRADE NOT LESS THAN 2% AND SHALL BE SUPPORTED AT INTERVAL
C.I. CO OUTLET NOT TO EXCEED10 FEET.
2. ALL PIPES PASSING THRU OR UNDER WALLS AND DRIVEWAYS SHALL BE
PROPERLY PROTECTED AGAINST BREAKAGE.
3. ALL CAULKED JOINTS SHALL BE FIRMLY PACKED WITH OAKUM OR OIL TREATED
0.50m x 0.50m 0.50m x 0.50m 0.50m x 0.50m
MANHOLE MANHOLE MANHOLE HEMP AND SHALL BE PROPERLY SECURED ONLY WITH PURE LEAD NOT LESS
THAN 1" DEEP WELL CAULKED.
1200
4. WORKMANSHIP SHALL BE OF SUCH CHARACTER AS TO FULLY SECURE THE
RESULTS SOUGHT IN ALL PROVISION OF THE NATIONAL PLUMBING CODE
INCLUDING THE FURNISHINGS OF ALL FITTINGS, TRAPS, VALVES AND
10 mm Ø @ 0.15 O.C.
ACCESSORIES REQUIRED FOR PROPER PLUMBING SYSTEM.
ALT. BENT @ L/4
INLET
C.I. CO
C.I. CO PLUMBING LEGENDS:
10 mm Ø EXTRA BAR = WASTE PIPE F = FAUCET
IN BETWEEN BENT-UP
150