Method Statement For Modification of Actuator's Base Plate - Rev01

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 12

Doc. No.

: JPS/LB/04
METHOD STATEMENT
Issue No.: 01

MODIFICATIONS OF ACTUATOR’S Revision: 01


BASE PLATE Date: 04.12.19
Page 1 of 5

PROJECT:

MEMBINA DAN MENYIAPKAN LENCONGAN BANJIR SUNGAI


BUNUS SERTA KERJA-KERJA SUNGAI BUNUS SERTA KERJA-
KERJA BERKAITAN WILAYAH PERSEKUTUAN,
KUALA LUMPUR

METHOD STATEMENT

MODIFICATIONS OF ACTUATOR’S BASE PLATE

Pages modified under this revision:-

1 04/12/2019 Based on consultant comments Intan Ismail JT JN


0 28/11/2019 Intan Ismail JT JN
DATE WRITTEN BY CHECKED BY APPROVED BY
REV. STATUS – REVISION MEMO
DD-MMM-YY (name & visa) (name & visa) (name & visa)

Sections changed in last revision are identified by a vertical line in the margin.
Doc. No.: JPS/LB/04
METHOD STATEMENT
Issue No.: 01

MODIFICATIONS OF ACTUATOR’S Revision: 01


BASE PLATE Date: 04.12.19
Page 1 of 5
1. Overview
The base of actuator’s support holes needs to be fitted into the anchor bolt before tightening it
with the nut to disallow any movement. The modifications is required to re-align the location of
the holes with the planted anchor bolt. The material plate that will be used to adopt with the base
plate is S275JR or equivalent with 20mm thickness. The weld minimum thickness shall be 10mm.
All the painted surface on the base plate affected area will be removed first before the welding
process. The cutting method that will be used is hand mill grinder.

2. Layout of Actuator’s Base Plate

1
Doc. No.: JPS/LB/04
METHOD STATEMENT
Issue No.: 01

MODIFICATIONS OF ACTUATOR’S Revision: 01


BASE PLATE Date: 04.12.19
Page 1 of 5
3. Details of Modification
Point On Site Figure Modifications

Drilling to realigning hole to the bolt


A position

Drilling to realigning hole to the bolt


B position

C
An extra plate will be cut and drilled
according to the size and location of the
anchor bolt and welded to the base
support. The material of the plate shall be
S275JR or equivalent with 20mm
thickness.
Doc. No.: JPS/LB/04
METHOD STATEMENT
Issue No.: 01

MODIFICATIONS OF ACTUATOR’S Revision: 01


BASE PLATE Date: 04.12.19
Page 1 of 5
Point On Site Figure Modifications

D Drilling at the location of the anchor bolt.

This section New small


will be cut plate added
and welded
around to
the base
support

New plate with


the size same
with the
previous cut
length is welded
F to the base
support. The
This section will material of the
be cut to the plate shall be
end and S275JR or
removed equivalent with
20mm
thickness.

3
Doc. No.: JPS/LB/04
METHOD STATEMENT
Issue No.: 01

MODIFICATIONS OF ACTUATOR’S Revision: 01


BASE PLATE Date: 04.12.19
Page 1 of 5
Point On Site Figure Modifications

An extra
plate will be
cut and
drilled
according to
G the size and
location of
the anchor
This section bolt and
will be cut to welded to
the end and the base
removed support.

Drilling at the location of the anchor bolt.


H

An extra
plate will be
cut and
drilled
according to
the size and
I location of
the anchor
bolt and
welded to
the base
support.
Doc. No.: JPS/LB/04
METHOD STATEMENT
Issue No.: 01

MODIFICATIONS OF ACTUATOR’S Revision: 01


BASE PLATE Date: 04.12.19
Page 1 of 5
Point On Site Figure Modifications

Drilling to realigning hole to the bolt


J position

Drilling to realigning hole to the bolt


K position

Drilling to realigning hole to the bolt


L position

5
Doc. No.: JPS/LB/04
METHOD STATEMENT
Issue No.: 01

MODIFICATIONS OF ACTUATOR’S Revision: 01


BASE PLATE Date: 04.12.19
Page 1 of 5
Point On Site Figure Modifications

M
This section will New plate with the size same
be cut to the with the previous cut length
end and is welded to the base support
removed

Drilling to realigning hole to the bolt


N position

1
This section will
be cut to the New plate with the size same
end and with the previous cut length
removed is welded to the base support
Doc. No.: JPS/LB/04
METHOD STATEMENT
Issue No.: 01

MODIFICATIONS OF ACTUATOR’S Revision: 01


BASE PLATE Date: 04.12.19
Page 1 of 5
Point On Site Figure Modifications

Drilling to realigning hole to the bolt


2 position

3 OK

4 OK

7
Doc. No.: JPS/LB/04
METHOD STATEMENT
Issue No.: 01

MODIFICATIONS OF ACTUATOR’S Revision: 01


BASE PLATE Date: 04.12.19
Page 1 of 5
Point On Site Figure Modifications

An extra plate will be cut and drilled


according to the size and location of
the anchor bolt and welded to the
base support.

Drilling to realigning hole to the bolt


6 position.

An extra plate
will be cut
and drilled
according to
the size and
7 location of
the anchor
This section will bolt and
be cut to the welded to the
end and base support.
removed
Doc. No.: JPS/LB/04
METHOD STATEMENT
Issue No.: 01

MODIFICATIONS OF ACTUATOR’S Revision: 01


BASE PLATE Date: 04.12.19
Page 1 of 5
Point On Site Figure Modifications

8 OK

An extra plate
will be cut
and drilled
9 according to
the size and
location of
the anchor
This section will bolt and
be cut to the welded to the
end and base support.
removed

Drilling to realigning hole to the bolt


10 position.

9
Doc. No.: JPS/LB/04
METHOD STATEMENT
Issue No.: 01

MODIFICATIONS OF ACTUATOR’S Revision: 01


BASE PLATE Date: 04.12.19
Page 1 of 5
Point On Site Figure Modifications

Drilling to realigning hole to the bolt


11 position

Drilling to realigning hole to the bolt


12 position.

Drilling to realigning hole to the bolt


13 position.
Doc. No.: JPS/LB/04
METHOD STATEMENT
Issue No.: 01

MODIFICATIONS OF ACTUATOR’S Revision: 01


BASE PLATE Date: 04.12.19
Page 1 of 5
Point On Site Figure Modifications

An extra plate
will be cut
and drilled
according to
14 the size and
location of
the anchor
This section will bolt and
be cut to the welded to the
end and base support.
removed

11