Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

existing

brgy.
5.0m road
wide

K
AL
HW
OPEN PAT
0M

SPACE
3.0

THWALK

L = 32 meters

L = 32 meters
3.00M PA

L = 26 meters

L = 26 meters
3.00M PATHWALK L = 130 meters
OPEN
E
SPAC 6.50M WIDE ROAD 3.0
L = 90 meters 0M
PA
TH
3.00M PATHWALK

W
AL
LK
OPEN =
E 72

rs
SPAC m

ete
ete
rs

6.50M WIDE ROAD

m
69
=

3.0
L
OPEN

0M
E
SPAC

rs
ete

PA
m
K

TH
AL

65

W
W

AL
TH

K
PA
L = 104 meters

rs
L = 104 meters

L = 104 meters

0M

ete
6.50M WIDE ROAD

L = 104 meters

L = 104 meters

K
3.0

m
AL

63
W

=
TH

L
PA
0M

rs
3.0

ete
AL

m
W
OPEN

TH

57
3.00M PATHWALK

3.00M PATHWALK

6.5
3.00M PATHWALK

E
SPAC
3.00M PATHWALK

PA

=
3.00M PATHWALK
0M

L
0M
W
ID

3.0

K
E

L = 55 meters

AL
L = 48 meters
RO

W
AD

TH
PA
L = 32 meters

0M
OPEN
E

3.0
SPAC

OPEN
E
SPAC

6.50M WIDE ROAD L = 89 meters 6.50M WIDE ROAD L = 135 meters 6.50M WIDE ROAD

L = 220 meters
OPEN
E
SPAC
L = 250 meters

L = 68 meters

L = 68 meters

L = 68 meters

L = 68 meters

L = 68 meters
L = 104 meters

L = 104 meters

L = 104 meters
6.50M WIDE ROAD

3.00M PATHWALK

3.00M PATHWALK

3.00M PATHWALK

3.00M PATHWALK

3.00M PATHWALK

6.50M WIDE ROAD


OPEN
E
SPAC
3.00M PATHWALK

3.00M PATHWALK

3.00M PATHWALK

OPEN
E
SPAC

8.00M WIDE ROAD L = 89 meters

MRF
A=60.00 SQ.M.
LOT AREA REQ. COVERED BASKETBALL TALIPAPA
300.00 SQ.M. COURT A=112.00 SQ.M.
A=420.00 SQ.M. LOT AREA REQ.
LOT AREA REQ. 420.00 SQ.M.
650.00 SQ.M.

POLICE OUTPOST TRICYCLE TERMINAL


A=40.00 SQ.M. A=40.00 SQ.M.
LOT AREA REQ. LOT AREA REQ.
105.00 SQ.M. 105.00 SQ.M.

PARKS AND PLAYGROUND


AREA:2,460.25 SQ.M
HEALTH CENTER / DAY CARE

LOT AREA REQ.


A=145.80 SQ.M.

375.00 SQ.M.

ELEM. SCHOOL (15 CLASSROOM,


3 STOREY BUILDING)
A=513.00 SQ.M.
LOT AREA REQ.
1,260.00 SQ.M.

6.50M WIDE ROAD

AD
NIA RO
3
PHASE
ALK
ALK

THW
HW

PA
PAT

3m
3m

s
0 meter
s
4 meter

L = 38
L = 36

EX
RETENTION POND
IS
TI
NG LINE OF RIPRAP
CO
NC
E

RE LINE OF RIPRAP
IN

TE
RL
TE

RO
RETENTION POND
N

AD
CE
AD
RO
NIA

COMPANY NAME: DRAWN BY: CHECKED BY: APPROVED BY: SHEET CONTENT:

ROTAFLEX CONSTRUCTION ENGR. WILLY MACAM RYAN L. UY PHASE 2


ARCHITECT PROJECT MANAGER PRESIDENT
AND DEVELOPMENT CORP.

You might also like